Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999
ML17292B558
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/04/1999
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-08, GL-92-8, GO2-99-027, GO2-99-27, NUDOCS 9902180235
Download: ML17292B558 (6)


Text

CATEGORY j.

I REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

,ACCESSION NBR:9902180235 DOC.DATE: 99/02/04 NOTARIZED: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME . AUTHOR, AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Requests change to CO which modified WNP-2 OL to reflect schedule for implementing Thermo-Lag 330-1 fire barrier C/As. Change requested to reflect that final implementation of C/As will be completed during Fall 1999 not Spring 1999. A DISTRIBUTION CODE: A029D TITLE: Generic Letter COPIES RECEIVED:LTR 92-008 Thermo-Lag 330 i ENCL Fire Barrier I SIZE: D T NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA ~ 1 0 PD4-2 PD 1 1 POSLUSNY 1 1 INTERNAL 1 1 NRR/DE/EELB 1 1 NRR/DRPW/PD3-1 1 1 NRR/DSSA/SPLB 1 1 NRR/KUGLER,A 1 1 RGN4 FILE 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richland, Washington 99352-0968 February.4, 1999 G02-99-027 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 AMENDED LETTER THERMO-LAG 330-1 FIRE BARRIERS REQUEST FOR CHANGE TO CONFIRMATORY ORDER

References:

1) Letter, dated March 25, 1998, C Poslusny (NRC) to 1V Parrish (SS),

"Confirmatory Order Modifying License"

2) Letter, dated December 28, 1998, JV Parrish (SS) to NRC, "Request for Change to Confirmatory order - Thermo-Lag 330-1 Fire Barriers",

'I The purpose of this letter is to request a change to the confirmatory order which modified the WNP-2 operating license to reflect the schedule for implementing Thermo-Lag 330-1 fire barrier corrective actions. This letter supersedes our letter dated December 28, 1998 (Reference 2), which contained an error in the accompanying affidavit. The subject line of the affidavit was incorrect.

We are requesting that the confirmatory order be changed to reflect that final implementation of Thermo-Lag 330-1 fire barrier corrective actions at WNP-2 will be completed during Fall 1999 instead of Spring 1999. The reason for the request is due to the planned transition to a 24-month fuel cycle during 1999.

The order had confirmed a commitment to complete implementation of Thermo-Lag 330-1 fire barrier corrective actions on a schedule commensurate with previous Supply System correspondence docketed in response to Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers."

Specifically, by Reference 1, the WNP-2 operating license was modified to state that final implementation of The'rmo-Lag fire barrier corrective actions would be completed during the R-14 Maintenance and Refueling Outage (Spring 1999). Reference 1 also indicated that overall work package close-out would be completed by December 1999. The Spring 1999 date was based upon a previously-established, 12-month refueling outage schedule.

.A 9902'i80235 990204 PDR':ADGCK 05000397 PDR

1 4 14 pent.

I'

'l~P 4~ >

l

~I I

AMENDED LETTER THERMO-LAG330-1 FIRE BARRIERS REQUEST FOR CHANGE TO CONFIRMATORY ORDER Page 2 of 2 In the order, the NRC stated that the Director, Office of Nuclear Reactor Regulation, may relax or rescind, in writing, any provisions of the confirmatory order upon a showing by the licensee of good cause.

Although current plans are to complete the overall project as originally scheduled, we are in the process of transitioning to a 24-month fuel cycle. This required rescheduling of the R-14 Maintenance and Refueling Outage from Spring 1999 to Fall 1999. The last remaining outage related Thermo-Lag modifications willbe implemented during the R-14 outage, but in the fall time-frame. This will have no impact on the final completion schedule because the overall Thermo-Lag resolution effort will be completed by December 1999 as required by the order.

Therefore, we are proposing that the Confirmatory Order Modifying License NPF-21 be revised to read as follows:

"WPPSS shall complete final implementation of Thermo-Lag 330-1 fire barrier corrective actions at Washington Public Power Supply System, Nuclear Project No. 2, described in the WPPSS submittals to the NRC dated April 13, 1993, February 11, 1994, November 9, 1994, April 27, 1995, September 26, 1997, and February 4, 1999 during the R-14 Maintenance and Refueling Outage (Fall 1999). Overall work package close-out will be completed by December 1999."

We appreciate your assistance in this matter. Should you have any questions or desire additional information pertaining to this letter, please call PJ Inserra at (509) 377-4147.

Respectful, Parrish Chief Executive Officer Mail Drop 1023 cc: SJ Collins - NRC NRR NRC Senior Resident Inspector - 927N EW Merschoff- NRC RIV PD Robinson - Winston & Strawn LJ Smith - NRC RIV DL Williams - BPA/1399 C Poslusny, Jr - NRC NRR

STATE OF WASHINGTON )

Subject:

ratin License NPF-21

'C.

) Amended Letter

) Thermo-La 330-1 Fire Bamer COUNTY OF BENTON ) han e to Confirmat rder I, JV PARRISH, being duly sworn, subscribe to and say that I am the Chief Executive Officer for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the f&authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

DATE , 1999 arrish Chief Executive Officer On this date personally appeared before me JV Parrish, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this ~day of 1999 No Public in and for the STATE OF WASHINGTON Residing a My Commission Expires

~ ~