IR 05000397/1995008
| ML17291B020 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/15/1995 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| 50-397-95-08, 50-397-95-8, NUDOCS 9509210221 | |
| Download: ML17291B020 (4) | |
Text
~
~S Staui
~~i UNITEDSTATES NUCLEAR R EG ULATORY COMMASS lON
REGION IV
611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 760114064 SEP t 5 f995 Washington Public Power Supply System ATTN:
J.
V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.
Box 968.
HD 1023 Richland, Washington 99352 SUBJECT:
NRC INSPECTION REPORT 50-397/95-08 NRC INSPECTION REPORT 50-397/95-08 has been canceled; therefore.
no inspection report will be issued for this report number.
Docket:
50-397 License:
NPF-21 homas P.
Gwynn, Di ect r
. Division of Reactor ety CC:
Washington Public Power Supply System ATIN:
J.
H. Swai les, WNP-2 Plant Hanager P.O.
Box 968, HD 927H Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
Chief Counsel 3000 George Washington Way P.O.
Box 968, HD 396 Richland.
Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:
Frederick S. Adair, Chairman P.O.
Box 43172 Olympi a
~ Washington 98504-3172 Washington Public Power Supply System ATTN:
D. A. Swank, WNP-2 Licensing Hanager P.O.
Box 968 (Hail Drop PE20)
Richland, Washington 99352-0968 95092i022i 9509i5 PDR ADOCK 05000397
Washington Public Power Supply System Washington Public Power Supply System ATTN:
P.
R. Bemis, Director Regulatory and Industry Affairs P.O.
Box 968 (Hail Drop PE20)
Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:
Chairman P.O.
Box 190 Prosser, Washington 99350-0190-Winston 8 Strawn ATlN:
H.
H.
Phi lips, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
Washington Public Power Supply System-3-E-Mail 'report to D. Nelson (DJN)
E-Hail report to NRR Event Tracking System (IPAS)
'bcc to DMB (IE01) bcc distrib. by RIV:
L. J. Callan DRSS-F IPB
'ranch Chief (DRP/E.
WCFO)
Senior Project Inspector (DRP/E, WCFO)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)
H.
Hammond (PAO, WCFO)
DOCUMENT NAME:
R:N WN2%WN508rp.wap To receive py of document, indicate in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy D:DRS TPGwynn 09/
/95 D:DRP JED
/95 D:DRS TPGwynn 09/
/95 09/
/95 09/
/95
Washington Public Power Supply System I
E-Hail report to D. Nelson (DJN)
E-Hail report to NRR Event Tracking System (IPAS)
bcc to DMB (IE01) bcc distrib.
by RIV:
L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E.
WCFO)
Leah Tremper (OC/LFDCB, HS:
TWFN 9E10)
Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)
H.
Hammond (PAO, WCFO)
DOCUMENT NAME:
R:% WN2KWN508rp.wap To receive opy of document, indicate In box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy D:DRS TPGwynn 09/
/95 D:DRP JED
/95 D:DRS TPGwynn 09/
/95 09/
/95 09/
/95