IR 05000397/1995008

From kanterella
Jump to navigation Jump to search
Cancellation of Insp Rept 50-397/95-08.Informs That No Insp Rept Will Be Issued for Subj Rept
ML17291B020
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/15/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
50-397-95-08, 50-397-95-8, NUDOCS 9509210221
Download: ML17291B020 (4)


Text

~

~S Staui

~~i UNITEDSTATES NUCLEAR R EG ULATORY COMMASS lON

REGION IV

611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 760114064 SEP t 5 f995 Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968.

HD 1023 Richland, Washington 99352 SUBJECT:

NRC INSPECTION REPORT 50-397/95-08 NRC INSPECTION REPORT 50-397/95-08 has been canceled; therefore.

no inspection report will be issued for this report number.

Docket:

50-397 License:

NPF-21 homas P.

Gwynn, Di ect r

. Division of Reactor ety CC:

Washington Public Power Supply System ATIN:

J.

H. Swai les, WNP-2 Plant Hanager P.O.

Box 968, HD 927H Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O.

Box 968, HD 396 Richland.

Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympi a

~ Washington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Hanager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 95092i022i 9509i5 PDR ADOCK 05000397

PDR

Washington Public Power Supply System Washington Public Power Supply System ATTN:

P.

R. Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190 Prosser, Washington 99350-0190-Winston 8 Strawn ATlN:

H.

H.

Phi lips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System-3-E-Mail 'report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

'bcc to DMB (IE01) bcc distrib. by RIV:

L. J. Callan DRSS-F IPB

'ranch Chief (DRP/E.

WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

H.

Hammond (PAO, WCFO)

DOCUMENT NAME:

R:N WN2%WN508rp.wap To receive py of document, indicate in box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy D:DRS TPGwynn 09/

/95 D:DRP JED

/95 D:DRS TPGwynn 09/

/95 09/

/95 09/

/95

Washington Public Power Supply System I

E-Hail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

bcc to DMB (IE01) bcc distrib.

by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E.

WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

H.

Hammond (PAO, WCFO)

DOCUMENT NAME:

R:% WN2KWN508rp.wap To receive opy of document, indicate In box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy D:DRS TPGwynn 09/

/95 D:DRP JED

/95 D:DRS TPGwynn 09/

/95 09/

/95 09/

/95