IR 05000397/1996016
| ML17292A653 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/09/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 9701140277 | |
| Download: ML17292A653 (6) | |
Text
CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9701140277 DOC DATE: 97/Ol/09 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397
~
~
AUTH.NAME AUTHOR AFFILIATION YNN,T.P.
Region 4 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.
Washington Public Power Supply System SUBJECT:
Ack receipt of 961206 ltr informing NRC of steps taken to correct violations noted in insp rept 50-391/96-16 on 961107.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR J ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:
C RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS ILE CENTER
~B B
NRR/DRPM/PERB OE DIR RGN4 FILE
ERNAL: LITCO BRYCE,J H
NRC PDR'OPIES LTTR ENCL RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS3 NOAC COPIES LTTR ENCL
1
1
1 E
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
~ pI
~pQ AEQUI Wp0 Jf**g+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 EA 96-343 JAN 9 l997 J. V. Parrish, Chief Executive Officer Washington Public Power Supply System 3000 George Washington Way P.O. Box 968, MD 1023 Richland, Washington 99352 SUBJECT:
NRC INSPECTION REPORT 50-397/96-16 and Notice of Violation Thank you for your letter G02-96-237of December 6, 1996, in response to our letter and Notice of Violation dated November 7, 1996, concerning two violations related to noncompliance to procedures during the approach to criticality and use of an inadequate procedure governing adjustable speed drive testing.
We have reviewed your reply and find
~
~
j it responsive to the concerns raised in our Notice of Violation. We willreview the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
Sincerely, omas P.
nn, Director Division of Reactor Safety Docket No.: 50-397 License No.:
NPF-21 CC:
Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 970ii40277 970i09 PDR ADOCK 05000397
Washington Public Power Supply System-2-Mr. Paul R. Bemis (Mail Drop PE20)
Vice President, Nuclear Operations Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Al E. Mouncer (Mail Drop 396)
Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Lourdes C. Fernandez (Mail Drop PE20)
Manager, Lrcensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Malcolm H. Phillips, Jr., Esq.
Winston 5 Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502
Washington Public Power Supply System-3-E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bcc to DMB (IE01)
bcc distrib. by RIV:
L. J. Callan Resident Inspector DRP Director DRS-PSB Branch Chief (DRP/E, WCFO)
MIS System Senior Project Inspector (DRP/E, WCFO)
RIV File Branch Chief (DRP/TSS)
M. Hammond (PAO, WCFO)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
WCFO File DRS Al 97-G~+7.
boo7 DOCUMENT NAME, E.X
~~a i~
4I( **g4.7 o~
To receive copy of document, Indicate ln box: "C" = Copy without enclosures
"E" = Copy with e osures "N"= No copy RIV:RE:0 TOMcKerno 01/ /97
- DRS C:BE C:OB TPGw nn 01/
HJWong $~
01/7/97 JLPel p'1/6
/97 OFFICIAL RECORD COPY
Washington Public Power Supply System-3-E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
,.bcc to DMB (IE01)
bcc distrib. by RIV:
L. J. Callan Resident Inspector DRP Director DRS-PSB Branch Chief (DRP/E, WCFO)
MIS System Senior Project Inspector (DRP/E, WCFO)
RIV File Branch Chief (DRP/TSS)
M. Hammond (PAO, WCFO)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
WCFO File DRS Al 97-G~+7-6 oo "/
DOCUMENT NAME:
~WC, im~( I( 6-+4 <+ "f To receive copy of document, indicate in box: "C" = Copy without enciosures
"E'
Copy with e osures "N" = No copy RIV:RE:0 C:OB C:BE
- DRS TOMcKerno 01/ /97 01/I&/97 01/
01/7/97 OFFICIAL RECORD COPY JLPel p'JWong (~
TPGw nn
>4OoeO