CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9904150026 DOC.DATE: 99/04/06 NOTARIZED: NO DOCKET FACIL:50-3/7 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.N~ ." , AUTHOR AFFILIATION WEBRING,R.L. Washington Public Power Supply System RECIP.'NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Informs NRC that insp interval ending date for ISI program plan has been extended by one year to 051212,due to changes in plant refueling outage schedule.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code - GL-89-04 NOTES:

RECXP1ENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA PD4-2 PD CUSHING, J INTERNAL: ACRS FILE C NRR/DE/ECGB NUDOCS-ABSTRACT 1 OGC/HDS3 RES/DET/EIB 1 1 RES/DET/EMMEB EXTERNAL: LITCO ANDERSON NOAC 1 1 NRC PDR m(OIRLj~l NOTE TO ALL "R'ZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTZON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415"2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richlanri, Washington 99352-0968 April 6, 1999 G02-99-062 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 EXTENSION OF SECOND 10- YEAR INSERVICE INSPECTION PROGRAM PLAN

Reference:

Letter GO2-94-286, dated December 27, 1994, JV Parrish (SS) to NRC, "Second 10- Year Inservice Inspection Program Plan" The reference letter submitted the second 10-year Inservice Inspection Program Plan (ISI Program Plan). The ISI Program Plan identified the ending date for the second interval to be December 12, 2004 (Table 5.2.1, page 5-45). This is twenty years after the initial service date of December 13, 1984.

This letter is written to inform the staff of an extension to the ISI Program Plan. The inspection interval ending date has been extended by one year to December 12, 2005 due to changes in the WNP-2 refueling outage schedule. The extension is within the provisions of ASME Section XI, IWA-2430, "Inspection Intervals," paragraph (d). The applicable edition of ASME Section XI for the second inservice inspection interval at WNP-2 is the 1989 Edition, no Addenda.

Should you have any questions or desire additional information regarding this matter, please call me or P J Inserra at (509) 377-4147.

Respectfully, ebring Vice President, Operations Support/PIO Mail Drop PE08 cc: EW Merschoff - NRC RIV DL Williams - SPA/1399 JS Cushing - NRR PD Robinson - Winston 0 Strawn NRC Senior Resident Inspector - 927N 9904i 5002b 99040b PDR ADQCK 05000397r' i~