| Start date | Site | Title |
---|
ML24284A294 | 22 October 2024 | | Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 29, 2024 |
RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 | 21 October 2024 | Dresden | Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 |
ML24276A133 | 17 October 2024 | FitzPatrick | Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes |
LR-N24-0062, Proposed Changes to Enclosure 2 Volume 13, ITS Section 3.8 Electrical Power Systems, of the Improved Technical Specification Conversion License Amendment Request | 17 October 2024 | Hope Creek | Proposed Changes to Enclosure 2 Volume 13, ITS Section 3.8 Electrical Power Systems, of the Improved Technical Specification Conversion License Amendment Request |
05000373/LER-2023-001-01, Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate | 9 October 2024 | LaSalle | Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate |
ML24239A538 | 20 September 2024 | Seabrook | Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation |
05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground | 19 September 2024 | Davis Besse | Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground |
05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps | 19 September 2024 | South Texas | Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps |
CP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel | 12 September 2024 | Comanche Peak | License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel |
ML24225A002 | 3 September 2024 | Cook | Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time |