ML17284A830

From kanterella
Jump to navigation Jump to search
Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl
ML17284A830
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/22/1999
From: Coleman D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-139, NUDOCS 9908020066
Download: ML17284A830 (8)


Text

CATEGORY REGULAT RY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9908020066 DOC.DATE: 99/07/22 NOTARIZED: NO DOCKET FACIL:..50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTQ'NAh& AUTHOR AFFILIATION COLEMAN,D.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

.Records Management Branch (Document Control'esk)

SUBJECT Clarifies change of licensee name from WPPS to Energy Northwest,& change of facility name from WPPSS Nuclear C, Project number 2 to WNP-2,as recgxested in 990719 telcon with JS Cushing of NRC.Marked-up OL pages, encl.

DISTRIBUTION CODE: M006D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Changes of Personnel/Address 1

NOTES:

A'ECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD4-2 LA 1 1 CUSHING,J 1 1 INTERNAL: ACRS 1 1 ASLBP 1 1 CAA-16B-13 1 1 -XGE CENTER 0 1 1 OC/LFDCB OGC/RP 1

1 0

1 RDSS P SECY/DSB

-33 1,.11 1

EXTERNAL: NRC PDR D

Igm

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, DISTRIBUTION LISTS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10

l WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richiand, Washington 99352-0968 July 22, 1999 602-99-139 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

i

Subject:

WNP-2 OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENT LICENSEE AND FACILITYNAME CHANGE ADDITIONALINFORMATION

Reference:

Letter, dated June 3, 1999, JV Parrish (SS) to NRC, "Request for Amendment, Licensee Name Change" This letter provides clarification concerning the legal corporate status regarding the change of licensee name from Washington Public Power Supply System to Energy Northwest and the change of facility name from Washington Public Power Supply System Nuclear Project Number 2 (WNP-2) to WNP-2. This clarification is provided as requested during a July 19, 1999, telephone conversation with JS Cushing (NRC) and JD Arbuckle and RN Sherman of the Supply System.

The reference letter provided Operating License pages marked to show the licensee and facility name change. The attached Operating License pages are marked to show clarification changes regarding the change of facility name and to reflect a correction to the license number (Appendix B). The legal corporate status of the licensee has not changed and no transfer within the scope of 10CFR50.80 will or has occurred.

Should you have any questions or desire additional information regarding this matter, please contact Mr. P J Inserra at (509) 377-4149.

DW Coleman (Mail Drop PE2 )

Manager, Regulatory Affairs Attachment cc: EW Merschoff - NRC RIV DL Williams - BPA/1399 JS Cushing - NRC NRR PD Robinson - Winston 2 Strawn NRC Sr. Resident Inspector - 927N 990S020066 990722 PDR ADQCK 05000397 H PDR

)

REQUEST FOR AMEN NT LICENSEE AND FACILITYNAME CHANGE ADDITIONALINFORMATION Attachment Operating License Marked Up Pages

OOCKET NO. 50-397 FACILITY OPERATING LICENSE License No. NPF-21

1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

FAr844y Akg~ vy ggy A. The application for license filed by the 4yAeaw (4fVSS-, also the licensee); complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have b de; E>e~c Nd+m m8~r iw'eP -2 B. Construction of We . 2-(the facility) has been substantially completed in conformity with Construction Permit No. CPPR-93 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.0. below);

D. There is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be

~

conducted in complianc'e with the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.0.

. below);

Enr@+c, A dctff ovF87 E. The is technically qualified to engage in the activities authorized by this license in accordance with the Commission's regulations set forth in 10 CFR Chapter I; F. The spy y N~ar<~z~ has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements", of the Commission's regulations;

ll P

It I P:

~

I'II

~ '" II

'L I < 'I I A4 g It I't

APPENDIX B FACILITY OPERATING LICENSE 'NO. ~

QPr--2 l 'O GOCKET NO. 50-397 ENVIRONMENTAL PROTECTION PLAN (NONRAOIOLOGICAL)

I

P

~ +L<<'I

~ 0