Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests
ML17292B640
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/13/1999
From: Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-068, GO2-99-68, NUDOCS 9904220285
Download: ML17292B640 (4)


Text

CATEGORY j.-

REGULA'1 .cY INFORMATION DISTRIBUTION. SYSTEM (RIDS)

ACCESSION NBR:9904220285 DOC.DATE: 99/04/13 NOTARIZED: NO DOCKET ¹ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SMITH,G.,O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Requests that WNP-2 Operator Requalification Program be granted one-time extension beyond requirement in 10CFR55.59(a) (2) for annual operating tests.

DISTRIBUTION CODE: M003D COPIES RECEIVED:LTR jj ENCL Q SIZE:

TITLE: Operator Requalification Program NOTES: E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD4-2 PD CUSHING,J INTERNAL: ACRS ~Zr~ENTER 01 NRR/DIPM/IOLB +RGN EXTERNAL: NOAC NRC PDR D

0 E

N WASTETH j

j'ijj"~!jilj'-ilia gj: jg I

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richland, Washington 99352-0968 Apn'l 13, 1999 GO2-99-068 Docket No. 50-397 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2 OPERA. TING LICENSE NPF-21 REQUE~ST FOR ONE-TIME EXTENSION TO THE ANNUAL OPERATING TEST REQUIREMENTS OF 10CFR55.59

.The Supply System requests that the WNP-2 Operator Requalification Program be granted a one-time extension beyond the requirement in 10CFR55.59(a)(2) for annual operating tests.

Specifically, we are requesting that the annual operating test periodicity be allowed a one-time extension from "annual" to a period not to exceed 15-months from the last date of passing the operating examination for each licensee at our facility. The Requalification Program 24-month cycle duration in 10CFR55.59(a)(1) will not be altered by this extension request.

WNP-2 is presently transitioning from a 12-month to a 24-month refuel cycle. As part of this transition, the Spring 1999 Refueling Outage (R14) has been moved to the Fall 1999 timeframe (currently scheduled for September 18 through October 23, 1999). Due to the increased demand for Operations staffing during the plant refueling outage, requalification training is limited to startup training and resumed after plant re-start. A one-time extension of the annual operating test periodicity will allow for the WNP-2 Operations and Training staff to focus on outage activities while minimizing the use of overtime to accommodate a concurrent requalification training schedule.

This request for a period "not to exceed 15-months" is based on the date of the first .

examinations administered in 1998 (November 19, 1998) to the projected last day for administering the operating exam (February 11, 2000). Since examinations are administered over a period of six weeks (one week per operating crew), the actual period between operating exams will be less than 15-months for most licensed operators.

63 pp ygo gQ I 'rr'rr04220285 9'rr04iS PDR ADQCK 050003'rr7 V PDR

l REQUEST FOR ONE-T EXTENSION TO THE ANNUA OPERATING TEST REQUIREMENTS OF 10CFR55.59 Page 2 Your prompt consideration of this request would be appreciated. Should you have any questions or desire additional information, please call me or WD Shaeffer, Manager, WNP-2 Nuclear Training; at (509) 377-8266.

Respectfully, GO Smith Vice President, Generation Mail Drop 927M CC: EW Merschoff, - NRC RIV RM Gallo, - NRR JS Cushing, - NRR JL Pellet, - NRC RIV NRC Sr. Resident Inspector, - 927N, DL Williams, - BPA/1399 PD Robinson, - Winston Ec Strawn