Forwards Final Rept for 950104 Drill site-specific to Plant. No Deficiencies Noted
ML20082L743
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/06/1995
From: Hepler O
Federal Emergency Management Agency
To: Spessard R
NRC (Affiliation Not Assigned)
Shared Package
ML17291A773 List:
References
NUDOCS 9504210281
Download: ML20082L743 (1)


Text

.

J, i. w. -?fiFederal Emergency Management Agency O

Washington, D.C. 20472 I

APR 6 1995 Mr. R. Lee Spessard, Director Division of Technical Support Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 j

Dear Mr. Spessard:

Enclosed is a copy of the final report for the January 4,

1995, j

Washington State Emergency Coordination Center (ECC) Drill site-specific to the WNP-2 Nuclear Power Plant.

The State of Washington participeced in the drill.

The drill report was l

prepared in March 1995 by the Region X staff of the Federal Emergency Management Agency (FEMA).

The FEMA Region X staff wi]1 forward a copy of the report to the State of Washington.

l The purpose of the' drill was to evaluate the capability of the l

Washington State ECC to carry out emergency response functions in l

an unannounced and off-hours drill.

No Deficiencies or Areas Requiring Corrective Actions were identified during the drill.

l If you should have any questions, please contact Dr. Anne Marie T. SuPrise, Chief, State and Local Regulatory Evaluation and l

Assessment Branch, at (202) 646-4065.

Sincerely,

,EC

o. Megs H pler, III Director i

Exercises Division

)

Preparedness, Training, and Exercises Directorate l