ML20082L743
| ML20082L743 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/06/1995 |
| From: | Hepler O Federal Emergency Management Agency |
| To: | Spessard R NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML17291A773 | List: |
| References | |
| NUDOCS 9504210281 | |
| Download: ML20082L743 (1) | |
Text
.
J, i. w. -?fiFederal Emergency Management Agency O
Washington, D.C. 20472 I
APR 6 1995 Mr. R. Lee Spessard, Director Division of Technical Support Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 j
Dear Mr. Spessard:
Enclosed is a copy of the final report for the January 4,
- 1995, j
Washington State Emergency Coordination Center (ECC) Drill site-specific to the WNP-2 Nuclear Power Plant.
The State of Washington participeced in the drill.
The drill report was l
prepared in March 1995 by the Region X staff of the Federal Emergency Management Agency (FEMA).
The FEMA Region X staff wi]1 forward a copy of the report to the State of Washington.
l The purpose of the' drill was to evaluate the capability of the l
Washington State ECC to carry out emergency response functions in l
an unannounced and off-hours drill.
No Deficiencies or Areas Requiring Corrective Actions were identified during the drill.
l If you should have any questions, please contact Dr. Anne Marie T. SuPrise, Chief, State and Local Regulatory Evaluation and l
Assessment Branch, at (202) 646-4065.
Sincerely,
,EC
- o. Megs H pler, III Director i
Exercises Division
)
Preparedness, Training, and Exercises Directorate l
Enclosure Attachnent
$5Dt/71018IS //
i
.