| Start date | Site | Title |
---|
ML25127A214 | 22 May 2025 | Palo Verde | Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle |
ML25085A416 | 22 May 2025 | 05200050 | SDAA - FSER Chapter 10 - Steam and Power Conversion System |
ML25127A174 | 15 May 2025 | Palo Verde | Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operating Valves |
ML25129A077 | 13 May 2025 | Grand Gulf | Integrated Inspection Report 05000416.2025001 |
ML25128A279 | 12 May 2025 | Braidwood | Issuance of Alternative Requests RR 3 Associated with Post-Maintenance Testing of Air-Operated Control Valve Fourth Inservice Testing Program Interval |
IR 05000352/2025001 | 12 May 2025 | Limerick | Integrated Inspection Report 05000352/2025001 and 05000353/2025001 |
IR 05000413/2025001 | 9 May 2025 | Catawba | Integrated Inspection Report 05000413/2025001, 05000414/2025001 and 07200045/2025001 |
IR 05000445/2025001 | 8 May 2025 | Comanche Peak | Integrated Inspection Report 05000445-2025001 and 05000446-2025001 |
IR 05000254/2025001 | 8 May 2025 | Quad Cities | Integrated Inspection Report 05000254/2025001 and 05000265/2025001 |
IR 05000483/2025001 | 8 May 2025 | Callaway | Integrated Inspection Report 05000483/2025001 |