MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] |
Text
CATEGORY 1 REGULATO INFORMATION DISTRIBUTION YSTEM (RIDS)
ACCESSION NBR:9605210464 DOC.DATE: 96/05/16 NOTARIZED: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to verbal questions from NRC staff re proposed amend, revising TS to reflect replacement of existing reactor reci1culation flow control sys w/adjustable speed drive sys.
DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution J ENCL ( SIZE:
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME ITTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 COLBURNgT 1 1 INTERNAL: ACRS" 1 1 ER 0 1 1 NRR/DE/EMCB, NRR/DSSA/SPLB NUDOCS-ABSTRACT 1
1 1
1'IGE 1
1 1
NRR/DSSA/SRXB OGC/HDS3 1
1 1
1 1
0 EXTERNAL: NOAC 1 NRC PDR 1 1'OTE TO ALL "RIDS" RECIPIENTS:
DOCUMENT .CONTROL DESK, PLEASE HELP US TO REDUCE WASTE! CONTACT THE ELIM1NATE YOUR NAME FROM ROOM OWFN 5D-5(EXT. 415-2083) TO DISTRIBUTION LISTS FOR DOCUMENTS, YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR"'3'NCL '12
I 4
t r'
f
@~i WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 May 16, 1996 G02-96-104 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NO. NPF-21 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS, REACTOR RECIRCULATION SYSTEM ADJUSTABLE SPEED DRIVE UPGRADE - ADDITIONALSUPPLEMENTAL INFORMATION(TAC NO.
M93949)
References:
- 1. Letter GO2-96-098, dated May 8, 1996, JV Parrish (SS) to NRC, "Request for Amendment to Technical Specifications, Reactor Recirculation System Adjustable Speed Drive Upgrade - Additional/",,)i~
Supplemental Information (TAC NO. M93949)"
- 2. Letter GO2-96-075, dated April 4, 1996, JV Parrish (SS) to NRC, "Request for Amendment to Technical Specifications, Reactor Recirculation System Adjustable Speed Drive Upgrade - Additional Supplemental Information (TAC NO. M93949)"
- 3. Letter GO2-96-051, dated March 12, 1996, JV Parrish (SS) to NRC, "Request for Amendment to Technical Specifications, Reactor Recirculation System Adjustable Speed Drive Upgrade - Supplemental Information (TAC NO. M93949)"
- 4. Letter, dated February 13, 1996, JW Clifford (NRC) to JV Parrish (SS),
"Request for Additional Information for the Washington Public Power Supply System (WPPSS) Nuclear Project No. 2 (WNP-2) (TAC NO.
M93949)"
- 5. Letter GO2-95-228, dated October 26, 1995, JV Parrish (SS) to NRC, "Request for Amendment to Technical Specifications, Reactor Recirculation System Adjustable Speed Drive Upgrade" 96052i0464 9605i6 PDR ADOCK 05000397 P PDR
Page 2 RESPONSE TO REQUEST FOR ADDITIONALINFORMATION- ASD SUBMITTAL The purpose of this letter is to respond to three verbal questions from the NRC staff related to the proposed amendment that revises the WNP-2 Technical Specifications to reflect the replacement of the existing Reactor Recirculation (RRC) flow control system with an adjustable speed drive (ASD) system. The questions and associated responses are presented below:
Question 1:
Assuming the ASDs are operational, what analyses were performed by the Supply System to provide assurance that the safety-related 4.16 kV undervoltage and degraded voltage protective relaying would not be inadvertently challenged during the normal and accident loading conditions established for the TR-S transformer? What were the results of the analyses?
Response
The voltage drops at the safety-related 4.16 kV buses (SM-4, SM-7, and SM-8) were evaluated for the maximum ASD operational design loading (including house loads), as well as for the bounding Loss of Coolant Accident (LOCA) loading, while connected to the TR-S transformer.
As specified in the Reference 1 submittal, the maximum ASD operational loading while connected to the TR-S transformer willbe administratively restricted to two ASDs at 50% drive speed or a single ASD at 100% drive speed. The minimum steady-state voltages expected at the 4.16 kV buses assuming these loading restrictions are shown in the "TR-S Loading Comparison" table provided below.
A LOCA scram will cause a main turbine trip and leads to a fast transfer of the TR-Nl'and TR-N2 transformer loads to the "Y" (4.16 kV) and "X" (6.9 kV) windings of the TR-S transformer, respectively. The LOCA scram and turbine trip also cause a fast closure of the turbine stop and control valves and result in an initiation of the End-of-Cycle RRC pump trip (and ASD trip).
Thus, the LOCA loads supplied by the TR-S transformer include the design basis safety-related loads, but do not include the RRC pump drive motors or the ASDs.
As indicated in the "TR-S Loading Comparison" table provided below, the minimum steady-state voltages at the safety-related 4.16 kV buses for ASD operation while connected to the TR-S transformer (1 ASD at 100% speed or 2 ASDs at 50% speed) are greater than the minimum steady-state voltages established for the LOCA loads in deriving the degraded voltage relay settings. Therefore, the voltage drops at the safety-related 4.16 kV buses due to ASD operational loading are bounded by the voltage drops due to LOCA loading, Furthermore, since the minimum steady-state voltages established for the LOCA loads are above the maximum Technical Specification allowable values for the undervoltage and degraded voltage relay setpoints (also indicated in the table below), the safety-related 4.16 kV undervoltage and degraded voltage protective relaying will not be inadvertently challenged during the normal or accident loading conditions.
~ i Page 3 RESPONSE TO REQUEST FOR ADDITIONALINFORMATION- ASD SUBMITTAL'R-S Loading Comparison Safety-Related Bus 1 ASD 100%
Speed at 2 ASDs at 50% Speed LOCA Loads
'V Relay Max TS Allowable Value Degraded Voltage Relay Max TS Allowable Value SM-4 3835 V 3828 V 3807 V 3045 V 3756.2 V SM-7 3835 V 3828 V 3816 V 3045 V 3756.2 V SM-8 3832 V 3825 V 3816 V 3045 V 3756.2 V
'SDs are automatically tripped on a scram signal. Minimum steady-state voltages established for LOCA loads in deriving the degraded voltage relay settings.
Question 2:
Implementation of the ASD design change results in additional TR-S and TR-N2 transformer loading and a necessity to derate the transformers. With these changes to the WNP-2 onsite electrical power system, will the plant still remain within its design basis?
Response
In accordance with WNP-2 Final Safety Analysis Report (FSAR), Section 8.1.5.2, the design basis of the onsite electrical power system is to supply the functional requirements of all auxiliary plant loads required for all modes of operation. Those portions of the system required for the distribution of power to Engineered Safety Feature (ESF) electrical components are designed to provide reliable availability of power essential to shutdown and maintain the plant in a safe condition and/or limit the release of radioactivity to the environment following a design basis accident. Furthermore, the physical events that accompany such an'accident will not interfere with the ability of the system to mitigate the consequences of that accident within the acceptable limits, even assuming a single, simultaneous failure in the electrical system.
The Supply System has evaluated the additional TR-S and TR-N2 loading and transformer derating associated with the ASD design change to ensure that WNP-2 remains within its design basis.
The Reference 1 submittal showed that the expected loading amps for the TR-S and TR-N2 transformers during ASD operation in the plant startup and normal operating modes would be less than the derated ampere ratings for the transformers. Based on this result, it was concluded that both the TR-S and TR-N2 transformers have sufficient capacity to supply the required fundamental and harmonic currents for ASD operation during the required modes of operation.
As discussed in the response to Question 1 above, a LOCA scram will cause a main turbine trip and leads to a fast transfer of the TR-Nl and TR-N2 transformer loads to the "Y" (4.16 kV) and
Page 4 RESPONSE TO REQUEST FOR ADDITIONALINFORMATION- ASD SUBMI'ITAL "X" (6.9 kV) windings of the TR-S transformer, respectively. The LOCA scram and turbine trip also cause a fast closure of the turbine stop and control valves and result in an initiation of the End-of-Cycle RRC pump trip (and ASD trip). Since the TR-N2 transformer is unloaded during a LOCA, the additional loading and derating of the TR-N2 transformer during ASD operation will have no impact on a LOCA. Furthermore, since the ASDs are tripped on a LOCA, the ASDs will have no impact on the LOCA loading for the TR-S transformer. Hence, no derating of the TR-S transformer is necessary for a LOCA. The TR-S transformer retains its original ratings of 2510.2 Amps (30 MVA)for the "X" winding and 5551.4 Amps (40 MVA) for the "Y" winding for LOCA loading. The expected LOCA loading (in Amps) for the TR-S transformer are 885.3 Amps for the "X" winding and 4904.7 Amps for the "Y" winding, which are within the rated capability of the transformer. The TR-S transformer thus remains capable of providing the power essential to shutdown and maintain the plant in a safe condition and/or limit the release of radioactivity to the environment following a design basis accident.
Based on the above evaluation, the TR-S and TR-N2 transformers will still be capable of supplying the functional requirements of the plant loads (including the ESF loads) required for the normal and accident modes of operation assuming the additional loading and derating necessary to implement the ASD design change. Therefore, the Supply System has concluded that WNP-2 will remain within its design basis following the changes to the onsite electrical power supply system related to the ASD design change.
Question 3:
What is the contribution of the ASDs to the "Expected Loading Amps" for the different loading and percent speed combinations shown in the Reference 1 "Transformer Loading Summary Table" for the TR-S and TR-N2 transformers?
Response
The following table provides the ASD contribution to the "Expected Loading Amps" for the same TR-S and TR-N2 transformer loading and percent speed combinations shown in the Reference 1 "Transformer Loading Summary Table."
ASD Load Contribution Table Transformer % Speed Expected Loading Amps ASD Contribution (Amps)
TR-S 50 1425
" 378 TR-S 100 1885 803 TR-N2 '231.6
" '606" TR-N2
'05 2379.7
" 1753 One RRC pump in 12 pulse mode
" Two RRC pumps in 12 pulse mode
Page 5 RESPONSE TO REQUEST FOR ADDITIONALINFORMATION- ASD SUBMITTAL Question 4:
Why does the Supply System believe that it is not necessary to test the ASD runback feature which, upon a loss of one ASD channel (in 12-pulse mode), automatically reduces the frequency of the remaining ASD channel to 52 Hz'2
Response
As part of the power ascension testing program to be conducted following the Spring 1996 (R-11) Maintenance and Refueling Outage, both ASD channels in each RRC pump loop will be tested to provide assurance that each of the four ASD channels has sufficient load capability for 52.2 Hz operation. Each ASD channel will also be tested to ensure that, upon a loss of a single channel (when operating in 12-pulse mode), the remaining operational channel willrunback from an initial speed greater than 52.2 Hz to the 52.2 Hz setpoint.
Should you have any questions or desire additional information regarding this matter, please call me or Lourdes Fernandez at (509) 377-4147.
Respectfully, J. V. Parrish Chief Executive Officer (Mail Drop 1023)
CDM/cdm CC: LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston Ec Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N
ll (
STATE OF WASHINGTON )
Subject:
Amendment to Technical Specifications
) Reactor Recirculation System Adjustable COUNTY OF BENTON ) Speed Drive Upgrade - Additional Supplemental Information I, J. V. PARRISH, being duly sworn, subscribe to and say that I am the Chief Executive Officer for the WASHINGTONPUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoirig; and that to the best of my knowledge, information, and belief the statements made in it are true.
DATE , 1996 J, Parrish ief Executive Officer On this date personally appeared before me J. V. PARMSH, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this ~day of 1996.
No Public n an rt e STATE OF WASHINGTON Residing at My Commission Expires