The Pressure and Temperature Limits Report specifies what pressure and temperature a reactor is license to.
Topic |
|---|
|
|
| All by date | | | Start date | Site | Title |
|---|
| ML25345A246 | 11 December 2025 | Ginna | 10 CFR 50.12 Exemption Request for Alternate Material Properties Bases | | ML25328A120 | 9 December 2025 | Watts Bar Sequoyah | Issuance of Amendment Nos. 373, 368; 177, and 82 Regarding Use of Online Monitoring Methodology | | ML25330A018 | 8 December 2025 | Watts Bar | Correction to Amendment No. 141 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition | | JAFP-25-0056, Pressure and Temperature Limits Report (PTLR) Revision 2 | 4 December 2025 | FitzPatrick | Pressure and Temperature Limits Report (PTLR) Revision 2 | | ML25283A005 | 9 October 2025 | Point Beach | Periodic Update of the Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control (Redacted) | | ML25282A058 | 9 October 2025 | Point Beach | Periodic Update of the Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (Redacted) | | ML25283A002 | 9 October 2025 | Point Beach | Periodic Update of the Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (Redacted) | | ML25283A013 | 9 October 2025 | Point Beach | Periodic Update of the Updated Final Safety Analysis Report, Chapter 15, Aging Management Programs and Time Limited Aging Analysis | | ML25258A174 | 22 September 2025 | Brunswick | Proposed Alternative for Reactor Pressure Vessel Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55A(Z)(1) | | ML25262A158 | 19 September 2025 | Palo Verde | Relief Request 75 – Proposed Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval |
|
|---|