MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] |
Text
ACCESSION NBR:9908190101 t DOC.DATE: 99/08/12 t
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NOTARIZED: NO DOCKET ¹
'ACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH- N~E AUTHOR AFFILIATION WEBRXNG,R.L. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Submits two ISI program plan relief requests for NRC review approval,per 10CFR50.55a(a) (3) (i) .Proposed alternatives provide acceptable level of quality S safety.
DISTRIBUTION CODE: A047D TITLE: OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from I ENCL ( SIZE:
ASME Code 7
NOTES: E RECIPIENT COPIES RECIPIENT COPIES G, ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD4-2 LA 1 1 CUSHXNG,J 1 1 INTERNAL: ACRS 1 1 01 1 1 NUDOCS-ABSTRACT 1 1 OGC/RP 1 0 RES/DET/ERAB 1 1 RES/DET/MEB 1 1 ~
EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D
0
'E N
NOTE TO ALL NRIDSN RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR 11 ENCL 10
E&ERQÃ NORTH llVEST PO. Box 968 e Richland, Washington 99352-0968 August 12, 1999 G02-99-155 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 INSERVICE INSPECTION PROGRAM PLAN RELIEF REQUEST 2ISI-18 AND 2ISI-19 This letter submits two Inservice Inspection (ISI) Program Plan relief requests for NRC review and approval. Relief Request 2ISI-18 (Attachment 1) proposes to use the existing WNP-2 written practice for the qualification and certification of personnel that perform nondestructive examinations as an alternative to the development and administration of a second written practice, regarding the above, for examinations of the containment vessel. The NRC evaluated a similar request from the Duane Arnold Energy Center (TAC No. MA0419) and on April 16, 1998, approved the relief request. The safety evaluation concluded the proposed alternative provided for qualified examiners.
Relief Request 2ISI-19 (Attachment 2) proposes to eliminate reexamination of containment vessel flaws or areas of degradation after the flaw or degradation is repaired.
Relief is requested in accordance with 10 CFR 50.55a(a)(3)(i), as the proposed alternatives provide an acceptable level of quality and safety.
Staff review and approval is requested prior to September 1, 2000, to support the Spring 2001 refueling outage. Should you have any questions or desire additional information regarding this issue, please call me or Mr. PJ Inserra at (509) 377-4147.
Respectfully, RL Webring ) q(Oi)L6 Vice President, Operations Support/PIO Mail Drop PE08 9908i90i0i 9908i2 Attachments PDR ADOCK OM00397 6 PDR cc: EW Merschoff - NRC MV DL Williams - BPA/1399 JS Cushing -NRCNRR PD Robinson - Winston 2 Strawn NRC Sr. Resident Inspector - 927N
INSERVICE INSPECTION PROGRAM PLAN RELIEF REQVEST 2ISI-18 AND 2ISI-19 Page 1 of 3 Requirement for Which Relief is Requested ASME Section XI, 1992 Edition, 1992 Addenda, Subarticle IWA-2300.
Section XIRequirements ASME Section XI, 1992 Edition, 1992 Addenda, Subarticle IWA-2300, requires examination personnel to be qualified and certified to the requirements of ANSVASNT CP-189.
Code Requirement from Which Relief is Requested Relief is requested fiom the provisions of Subarticle IWA-2300, "Qualifications of Nondestructive Examination Personnel." This Subarticle requires personnel that perform nondestructive examinations be qualified and certified using a written practice in accordance with ANSI/ASNT CP-189, "Standard for Qualification and Certification of Nondestructive Testing Personnel," as amended by the requirements ofASME Section XI.
Basis for Requesting Relief Relief is reque ted in accordance with 10 CFR 50.55a(a)(3)(i) in that the proposed alternative provides an acceptable level of quality and safety.
The requirements regarding examination of Code Class 1, 2, and 3 components (10 CFR 50.55a) reference the 1989 Edition of ASME Section XI. The qualification of nondestructive examination personnel is addressed in Subarticle IWA-2300 of the 1989 Edition and requires a written practice based on SNT-TC-1A, as amended by the requirements of Subarticle IWA-2300. We have implemented a qualification program based on the above requirements.
In a Federal Register Notice dated August 8, 1996 (61 Federal Register 41303), the NRC amended 10 CFR 50.55a to incorporate by reference the 1992 Edition with 1992 Addenda of Subsections D%V. and IWLof Section XI of the ASME Boiler and Pressure Vessel Code. This change represents an addition to the Inservice Inspection (ISI) Program Plan. The ASME Section XI, 1992 Edition, 1992 Addenda requires the use of a written practice based on the requirements of ANSI/ASNT CP-189, as amended by the requirements of Subarticle IWA-2300, to implement Subsection IWE. This is a duplication of the existing written practice and existing qualification and certification program for personnel that perform nondestructive examinations of Code Class 1, 2, and 3 components (as noted in the paragraph immediately above).
Alternative Requirements Examinations required by Subsection IWE shall be conducted by personnel qualified and certified to a written practice based on the current ISI Section XI Code of record for
~ i~
INSERVICE INSPECTION PROGRAM PLAN RELIEF REQUEST 2ISI-18 AND 2ISI-19 Attachment 1 Page 2 of3 subsections IWB, IWC, IWD, and IWF for the reminder of the second ISI inspection interval.
The current Code for the second inspection interval is the 1989 Edition, no Addenda. These alternate requirements will be revised to the latest approved written practice when the ISI Program Plan for IWB, IWC, IWD, and IWF is revised for the third ISI inspection interval.
The revision is anticipated to be completed in 2005.
In addition to the current written practice for personnel performing examinations of Code Class 1, 2, and 3 components, as described in the previous'paragraph, the following will be included in the written practice for IWE personnel qualification:
- 1) A near distance test chart that meets the requirements of IWA-2321 and IWA-2322 (ASME Section XI, 1992 Edition, 1992 Addenda) will be used for annual demonstration of natural or corrected near distance visual acuity.
- 2) Personnel performing IWE examinations will receive instructions pertinent to IWE components.
Justification for the Granting of Relief We will revise the written practice for qualifying and certifying examination personnel to ASME Section XI, IWA-2300, 1992 Edition, 1992 Addenda, or later, when the ISI program is revised for the third ISI inspection interval during 2005.
The alternative incorporates provisions of IWA-2321 and IWA-2322, of the 1992 Code, for vision and illumination requirements as alternate visual near distance requirements for the remainder ofthe second ISI inspection interval.
The alternative provides qualification and certification to the same requirements used for personnel performing examinations of Code Class 1, 2, and 3 components in addition to specific requirements for visual acuity for IWE component examinations. The alternative meets, as a minimum, the requirements for examinations now being performed on Code Class 1, 2, and 3 components, therefore, providing an adequate level of quality and safety.
Visual examination is the primary nondestructive examination method required by Subsection IWE. Neither CP-189 or SNT-TC-1A specifically includes visual examination, thus, the Code requires qualification and certification to comparable levels as defined in CP-189 or SNT-TC-1A, as applicable, and the employer's written practice.
The latest Edition of ASME Section XI (1998) no longer requires nondestructive examination examiners to be qualified or certified using CP-189 for performance of visual containment examinations (IWF 2330). The 1998 Edition of Section XI requires that the Owner establish a qualification and certification program.
Attachment Page 3 of3 1
~,
INSERVICE INSPECTION PROGRAM PLAN RELIEF REQUEST 2ISI-18 AND 2ISI-19
~
The current requirements represent a hardship to WNP-2, and its vendors, regarding the development and maintenance of an additional, separate written practice. Development and administration of a second program would not enhance safety or quality and would serve as a burden, particularly in developing a second written practice, tracking of certifications, and duplication of paperwork. This duplication would also apply to NDE vendor programs.
Updating to the 1992 Edition, 1992 Addenda, for subsections IWB, IWC, IWD, and IWF would require a request for relief similar to this one. The alternate, as a minimum, has the same requirements for performing visual examination of Code Class 1, 2, and 3 components.
Implementation Schedule Relief is requested for the first ten-year containment inspection interval for WNP-2.
Bibliography
- 1. Letter dated December 19, 1997, Kenneth E. Peveler to NRC, 'Duane Arnold Energy Center, Docket No: 0-331, Op. License No: DPR-49, Relief Request MC-R001"
- 2. Letter dated March 18, 1998, Kenneth E. Peveler to NRC, 'Duane Arnold Energy Center, Docket No: 0-331, Op. License No: DPR-49, Relief Request MC-R001"
- 3. Letter dated April 16, 1998, Richard P. Savio to Mr. Lee Liu, "Evaluation of Relief Request MC-R001 Related to Qualification Requirements for Non-Destructive Examination Personnel Performing Containment Inspections - Duane Arnold Energy Center (TAC No. MA0419)"
- 4. Letter dated April 23, 1998, Richard J. Laufer to Mr. Lee Liu, "Correction to Evaluation of Relief Request MC-R001 Related to Qualification Requirements for Non-Destructive Examination Personnel Performing Containment Inspections - Duane Arnold Energy Center (TAC No. MA0419)"
- 5. ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition, no Addenda
- 6. ASME Boiler and Pressure Vessel Code,Section XI, 1992 Edition, 1992 Addenda
- 7. ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition, no Addenda
t INSERVICE INSPECTION PROGRAM PLAN RELIEF RENDU ST 2ISI-18 AND 2ISI-19 Page 1 of3 Components for Which Relief is Requested All components within the examination boundary of Subarticle IWE as listed in the ISI Program Plan.
Section XIRequirements ASME Section XI, 1992 Edition, 1992 Addenda, IWE-2420(b) and IWE-2420(c) state:
"(b) When component examination results require evaluation of flaws, areas of degradation, or repairs in accordance with IWE-3000, and the component is found to be acceptable for continued service, the areas containing such flaws, degradation, or repairs shall be reexamined during the next inspection period listed in the schedule of the inspection program of IWE-2411 or IWE-2412, in accordance with Table IWE-2500-1, Examination Category E-C.
(c) When the reexaminations required by IWE-2420(b) reveal that the flaws, areas of degradation, or repairs remain essentially unchanged for three consecutive inspection periods, the areas containing such flaws, degradation, or repairs no longer require augmented examination in accordance with Table IWE-2500-1, Examination Category E-C."
Code Requirement from Which Relief is Requested Relief is requested from implementing ASME Section XI, 1992 Edition, 1992 Addenda, IWE-2420.
Basis for Requesting. Relief Relief fiom the above requirements is requested under 10 CFR 50.55a(a)(3)(i) in that the proposed alternative provides an acceptable level of quality and safety.
Alternative Requirement The requirements ofIWE-2420, ASME Section XI, 1998 Edition willbe used.
SustiTication for the Granting of Relief The current requirement is ambiguous, contradicts IWE-3122, and does not follow similar requirements for ASME Section XI, Code Class 1, 2, and 3 components.
When a compc nent is subjected to an inservice examination, ASME Section XI provides four means for acceptance in IWE-3122. They are:
INSERVICE INSPECTION PROGRAM PLAN RELIEF REQUEST 2ISI-18 AND 2ISI-19 Page2of3
- 1) IWE-3122.1 - results do not exceed acceptance standards ofIWE-3400;
- 2) IWE-3122.2 - results exceed the acceptance standards, but the component is repaired;
- 3) IWE-3122.3 - results exceed the acceptance standards, but the component is replaced;
- 4) IWE-3122.4 - results exceed the acceptance standards, but the component is evaluated as acceptable for continued service.
In accordance with IWE-3122, only when an unacceptable examination result is evaluated and determined acceptable for continued service is a reexamination required during the next inspection period. Contrary to this, the requirements of IWE-2420 would require reexamination during the next inspection period for components that were repaired.
Performing successive examinations on a component that has.been repaired is not warranted since the component has been restored to an acceptable condition.
Table 1 compares the 1992 Edition, 1992 Addenda, with the 1998 Edition.
The proposed alternate requirement removes the ambiguity and conflict between IWE-3122 and IWE-2420.
The ASME ha.'> approved the proposed alternate.
Implementation Schedule This relief request will be implemented during the first containment inspection interval.
AIL'6 I
t INSERVICE INSPECTION PROGRAM PLAN RELIEF REQU ST 2ISI-18 AND 2ISI-19 Page 3 of3 TABLE 1 ASME Section XI, 1992 ASME Section XI, 1998 Comments Edition, 1992 Addenda Edition IWE-2420(a) The sequence of IWE-2420(a) The sequence of No change.
component examinations component examinations established during the first established during the first inspection interval shall be inspection interval shall be repeated during each successive repeated during each successive inspection interval, to the inspection interval, to the extent practical. extent practical.
IWE-2420(b) When component IWE-2420(b) When eeinyeaeat Removed repairs from examination results require examination results require reexamination requirement.
evaluation of flaws, areas of evaluation of flaws, gr areas of degradation, or repairs in degradation-,er-i:eyes in accordance with IWE-3000, accordance with IWE-3000, and the component is found to and the component is feuiid-te be acceptable for continued be acceptable for continued service, the areas containing service, the areas containing such flaws, degradation, or such flaws, gr degradation-,er.
repairs shall be reexamined repahs shall be reexamined during the next inspection during the next inspection period listed in the schedule of period listed in the schedule of the inspection program of IWE- the inspection program of IWE-2411 or IWE-2412, i>> 2411 or IWE-2412, in accordance with Table IWE- accordance with Table IWE-2500-1, Examination Category 2500-1, Examination Category E-C. E-C.
IWE-2420(c) When the IWE-2420(c) When the Removed repairs from reexamination required by reexamination required by reexamination requirement.
IWE-2320(b) reveal that the IWE-2320(b) reveal that the Reduced reexamination periods flaws, areas of degradation, or flaws, gr areas of degradation, from three to one.
repairs remain essentially er-repairs remain essentially unchanged for three unchanged for tahe nex three consecutive inspection periods, eeaseetitive inspection periods, the areas containing such flaws, r degradation, or repairs no longer require augmented no longer require augmented examination in accordance with examination in accordance with Table IWE-2500-1, Table IWE-2500-1, Examination Categor E-C. Examination Category E-C.