ML20094D868
| ML20094D868 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/18/1995 |
| From: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9511060291 | |
| Download: ML20094D868 (1) | |
Text
a e
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.o. Box 968
- 3000 George Washington Way e Richland. Washington 993S2 0968 * (509) 372 5000 August 18, 1995 GO2-95-155 Docket No. 50-397 Mr. L. J. Callan, Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064
Dear Mr. Callan:
Subject:
WNP-2, OPERATING LICENSE NPF-21 REGION IV RADIATION PROTECTION MEETING
Reference:
Letter GO2-95-114, dated June 21,1995, JV Parrish (SS) to U Callan (NRC),
" Region IV Radiation Protection Meeting" The referenced letter invited members of the staff to attend a Region IV based utility meeting to discuss radiation protection matters. Due to scheduling conflicts for certain utilities within the Region, the meeting scheduled for August 24 and 25,1995, has been postponed. The tentative time for a rescheduled meeting is mid-January in Arlington, Texas. Exact times and locations will be coordinated with members of your staff and other Region IV power plants. We apologize for any inconvenience resulting from this postponement. We look forward to your attendance at the upcoming meeting.
Should you have any questions or desire additionalinformation regarding this matter, please call me or W. H. Barley at (509) 377-2386, FAX (509) 377-8637.
- rely,
,/
A J. VWarrishTMail Drop 1023)
Vice President, Nuclear Operations 9511060291 950818 DAS/ml PDR ADOCK 05000397 P
PDR cc:
NRC Document Control Desk KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N i
l
(: C[ Gy fI o,