See 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Topic |
---|
|
|
10 CFR | |
---|
All by date | | Start date | Site | Title |
---|
ENS 57092 | 25 April 2024 21:55:00 | Perry | Configuration of B and C Residual Heat Removal Loops in an Unanalyzed Condition | ENS 56957 | 9 February 2024 18:22:00 | Peach Bottom | Unanalyzed Condition - Inadequate Fuses for Fuel Pool Cooling | NUREG-2194 Volume 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | 31 January 2024 | | NUREG-2194, Vol. 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | ENS 56928 | 18 January 2024 20:04:00 | Columbia | Residual Heat Removal Degraded Due to Service Water Leakage | ML24008A248 | 8 January 2024 | 07201031 | NAC International, Response to Apparent Violations (a and B) in NRC Inspection Report 72-1031/2023-201; EA-2023-069 | ENS 56910 | 28 December 2023 16:29:00 | Watts Bar | Unanalyzed Condition | ML23234A176 | 14 December 2023 | | IMC 0309 Reactive Inspection Decision Basis for Power Reactors | IR 05000341/2023010 | 8 December 2023 | Fermi | Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 | ML23338A251 | 5 December 2023 | | Summary of the Reactor Oversight Process Bi-Monthly Public Meeting | ML23345A084 | 28 November 2023 | Susquehanna | Technical Requirements Manual |
|
---|