ML17284A875

From kanterella
Jump to navigation Jump to search
Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5
ML17284A875
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/30/1999
From: Coleman D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-165, NUDOCS 9909090208
Download: ML17284A875 (6)


Text

mx'zaoar 1 REGULATO Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9909090208 DOC.DATE: 99/08/30 NOTARIZED: NO DOCKET ¹ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 ASH. N2&iE AUTHOR AFFILIATXON COLEMAN,D.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Provides correct page from license NPF-21 marked to show rev addressed in 990729 application for amend, which included page that was inadvertently included as attachment 4.Replace attachment 4 with attached page &, disregard attachment 5; DISTRIBUTION CODE: ROOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution I ENCL L SIZE:

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 LPD4-2 LA 1 1 CUSHXNG,J 1 1 SC 1 INTERNAL: ACRS 1 1 I-LE CENTER 1 1 NRR/DSSA/SPLB 1 1 R/'DSSXf'SR B 1 1 NUDOCS-ABSTRACT 1 1 OGC/RP. 1 0 EXTERNAL: NOAC 1 1 NRC PDR D

@g)gQ<~(Qv E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEZVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 11 ENCL 10

EWER@P'ORTH WEST PO. Box 968 m Richland, Washington 99352-0968 August 30, 1999 G02-99-165 Docket No. 50-397 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 REQUEST I<'OR AMENDMENT, POST-ACCIDENT NEUTRON FLUX MONITORING, LICENSE CONDITION 2.C.(1G), ATTACHMENT 2 ITEM 3(b)

Reference:

Letter dated July 29, 1999, RL Webring (Energy Northwest) to NRC, "Request for Amendment, Post-Accident Neutron Flux Monitoring, License Condition 2.C.(16), Attachment 2, Item 3(b)"

The purpose of this letter is to provide the correct page from Operating License NPF-21 marked to show the revision addressed in the reference letter. The reference letter included a page that was inadvertently included as Attachment 4. Please replace Attachment 4 noted in the reference letter, with the attached page. In addition, please disregard Attachment 5, "Revised Operating License Page" included in the reference letter as it has been determined that it is not necessary.

Should you have any questions or require additional information pertaining to this letter, please contact P J Inserra at (509) 377-4147.

Respectfully, DW Coleman Manager, Regulatory Affairs Mail'Drop PE20 Attachment cc: EW Merschoff - NRC - RIV NRC Sr. Resident Inspector - 927N JS Cushing -NRC - NRR DL Williams - BPA/1399 TC Poindexter - Winston & Strawn 9q09990208 c<90830 P PD<< ADCIC<< 050003<'7 P PDR

)*

~4 y >I" 4

P H

~l

REQUEST FOR AhlE MENT, POST-ACCIDENT NEU ON FLUX MONITORING, LICENSE CONDITION 2.C. (16), ATTACHMENT2, ITEM 3(b) 0 eratin License Marked-U a e

Attachment 2

3. Re ulator Guide 1.97 Revision 2 Com liance (a) The licensee shall implement (installation or upgrade) requirements of Regulatory Guide 1.97, Revision 2 with the exception of items (b) and (c) below prior to startup following the first refueling outage.

DELE v'b) i s sh '

me is'

'tall ion

'ri upg de) equi me s t

gu to G .9 , R 2, r fl mo pri s p fo ow' e f r r u ing o age.

(c) The licensee shall implement (install and have operational) a wide range suppression pool level monitoring system which satisfies the Category 1 equipment specifications in accordance with Regulatory Guide 1.97, Revision 2, prior to startup following the second refueling outage.

4. U rade Emer enc 0 eratin Procedures EOPs The'icensee shall provide within two(2) months after the issuance of this operating license, an addendum to the Procedures Generation Package describing the function and task analysis as identified in Supplement 1 to NUREG-0737.
5. Emer enc Res onse Facilities The licensee shall have fully functional emergency response facilities (Technical Support Center, Operational Support Center, and Emergency Operations Facility) prior to exceeding five (5) percent of rated power.

a e ~ o r

j ~

~ ~