A half scram means that only half a signal to have a scram happened. Meaning that no control rods actually inserted.
Topic |
|---|
|
|
| All by date | | | Start date | Site | Title |
|---|
| ML26015A128 | 28 January 2026 | Hatch | Integrated Inspection Report 05000321/2025004 and 05000366/2025004 | | ML25290A063 | 13 October 2025 | Susquehanna | Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.6, All Other Instrumentation Systems Required for Safety | | ML25290A059 | 13 October 2025 | Susquehanna | Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.2, Reactor Trip System - (Reactor Protection System) - Instrumentation and Controls | | ML25224A059 | 12 August 2025 | Dresden | Nuclear Power Station, Units 2 and 3, Integrated Inspection Report 05000237/2025002 and 05000249/2025002 | | IR 05000237/2025002 | 12 August 2025 | Dresden | Integrated Inspection Report 05000237/2025002 and 05000249/2025002 | | 05000352/LER-2025-002, Unit 1, Loss of Power to the 1A Reactor Protection System Resulted in Multiple Invalid Primary Containment Isolations | 12 August 2025 | Limerick | Unit 1, Loss of Power to the 1A Reactor Protection System Resulted in Multiple Invalid Primary Containment Isolations | | ENS 57850 | 10 June 2025 23:10:00 | Browns Ferry | 60-DAY Optional Telephonic Notification for Invalid Containment Isolation | | ML25106A142 | 24 April 2025 | Hatch | MD 8.3 - Hatch, Unit 1, TCV RPS Pressure Switches | | NLS2025008, Nuclear Station, Technical Specification Bases Changes | 17 April 2025 | Cooper | Nuclear Station, Technical Specification Bases Changes | | ML25091A046 | 27 March 2025 | | FOIA-2025-000406 Released Set 1 |
|
|---|