IR 05000397/1996002

From kanterella
Jump to navigation Jump to search
Informs That Anticipated Date of Full Compliance for Both Violations a & B Noted in Insp Rept 50-397/96-02 Is 960930
ML17292A294
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/04/1996
From: Swank D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-114, NUDOCS 9606110115
Download: ML17292A294 (2)


Text

('A'I'E(iUK Y J REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)~'CESSION NBR:9606110115 DOC.DATE: 96/06/04 NOTARIZED:

NO CIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION SWANK,D.A.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)SUBJECT: Informs that anticipated date of full compliance for both violations A a B noted in insp rept 50-397/96-02 960930.DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR j ENCL a SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response J NOTES: DOCKET 05000397 T E RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS A ILE CENTE CH HHFB NRR/DRPM/PERB OE DIR RGN4 FILE 01 COPIES LTTR ENCL RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS3 COPIES LTTR ENCL R Y RNAL: LITCO BRYCE,J H NRC PDR NOAC D o NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM I?O.Box 968~3000 George lVashington ivay~Richland, 1Vashington 99352-0968

~(509)372-5000 June 4, 1996 G02-96-114 Docket No.50-397 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555 Gentlemen:

Subject: NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21,-~NRC-INSPECTION REPORT 96-02, ADDITIONAL INFORMATION FOR"NOTICE OF, VIOLATION References:

1)Letter dated April 18, 1996, JV Parrish (SS)to US Nuclear Regulatory Commission,"NRC Inspection Report 96-02, Response to Notice of Violation" 2)Letter dated March 19, 1996, JE Dyer (NRC)to JV Parrish (SS),"NRC Inspection Report 50-397/96-02 and Notice of Violation" The Supply System's response to the referenced Notice of Violation did not include dates of full compliance for the violations identified.

The anticipated date of full compliance for both violations A&B is September 30, 1996.Should you have any questions or desire additional information regarding this matter, please call me or Ms.Lourdes Fernandez at (509)377-4147.Respectfully, D.A.Swank (Mail Drop PE20)Manager, Regulatory Affairs cc: LJ Callan, NRC RIV TG Colburn, NRR KE Perkins, Jr., NRC RIV, WCFO qb0bii0ii5 9bOb04 PDR ADOCK 05000397 8 PDH NS Reynolds, Winston&Strawn NRC Sr.Resident Inspector, MD927N DL Williams, BPA, MD399 rgo(