GO2-95-014, Forwards Cycle 10 Colr. Informs That Committee Has Reviewed & Approved Rev 1 to COLR 94-10
| ML17291A622 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/25/1995 |
| From: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17291A623 | List: |
| References | |
| GO2-95-014, GO2-95-14, NUDOCS 9502010195 | |
| Download: ML17291A622 (3) | |
Text
P RIGRITY 1
(ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9502010195 DOC.DATE: 95/01/25 NOTARIZED: NO DOCKET I
- FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PARRISH,J.V.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "Cycle 10 COLR." Informs that committee has reviewed
& approved Rev 1 to COLR 94-10.
DISTRIBUTION CODE'OOID COPIES RECEIVED'LTR ENCLl SIZE
+
TITLE: OR Submittal:
General Distribution NOTES P
0 RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORD,J INTERNAL: ACRS NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1 PD4-2 PD 1
1 6
6 Z E=CENTER 01 1
1 NRR/DSSA/SPLB 1
1 NUDOCS-ABSTRACT 1
0 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 EXTERNAL: NOAC 1
1 NRC PDR 1
1 D
0 C
i U,
N NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACI THE DOCUhIENTCONTROL DESK, ROOhI Pl-37 (EXT. 504-2083 ) TO ELIhIINATEYOUR iAhIE FROh!
DISTRIBUTIONLISTS I:OR DOCL'hIEN'I'S YOU DON"I'LED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 17 ENCL 16
WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352-0968
~ (509) 372-5000 Docket No. 50-397 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.
20555 January 25, 1995 G02-95-014 Gentlemen:
Subject:
NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21, CYCLE 10 CORE OPERATING LIMITSREPORT (COLR)
References:
Letter G02-94-158, dated July 11, 1994, JV Parrish (SS) to NRC, "Cycle 10 Core Operating Limits Report (COLR)"
In accordance with the requirements of WNP-2 Technical Specification 6.9.3.4, the Supply System is submitting Revision 1 to COLR 94-10.
Revision 0 to COLR 94-10 was submitted to the NRC in the referenced letter.
The WNP-2 Plant Operating Committee has reviewed and approved Revision 1 to COLR 94-10.
Revision 1 to COLR 94-10 incorporates the re-evaluated MinimumCritical Power Ratio (MCPR) limits associated with the recirculation flowincrease transient.
Previous flow dependent MCPR limits provided in Revision 0 assumed both recirculation loops would run-up simultaneously.
The revised analysis recognizes that only a single pump run-up is credible.
Should you have any questions or desire additional information, please call me or D.A. Swank at (509) 377-4563.
. V. Parrish (Mail Drop 1023)
Vice-President, Nuclear Operations JMP Attachment CC:
> 005'J LJ Callan, NRC-RIV JW Clifford, NRC KE Perkins, Jr., NRC-RIV, Walnut Creek Field Office NS Reynolds, Winston & Strawn NRC Sr. Resident Inspector (Mail Drop 927N)
DL Williams, BPA (Mail Drop 399)
ADOCK 05000597 oiOi95 950i25 PDR AD PD P
,o(
g 1 V C
l I