ML17284A744
| ML17284A744 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/19/1998 |
| From: | Dunigan P ENERGY, DEPT. OF |
| To: | Boynton S NRC, WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17284A745 | List: |
| References | |
| 98-SID-366, NUDOCS 9809110069 | |
| Download: ML17284A744 (4) | |
Text
'CATEGORY 2 A
R"-GULRRTORY INFORNATIQN D ISTR IBUTION SYSTEM
~ ( R IDS )
ACCESSION NBR C
FACIL: 50-397 AUTH. NAME DUNI GAME P. F.
RECIP. NAME BOYNTQNi S.
9809110069 DOC. DATE: 98/OB/19 NOTARIZED:
NO WPPSS Nuclear Pro Ject.
Uni 2.
Washing on Public Powe AUTHOR AFFILIATION En'erg'>
Dept.
oF REC IP IENT AFFILIATION NRC No Deta i 1 ed AFfi 1 iat i on Gi ven DOC/gE I 05000397
SUBJECT:
Forwardsi "Draft Environ Assessment for Washington Public C
Power Supply Sgs Sublease for Aluminum Smelter Plant, Hanford Sitei Richland
~ WashingtonT" for review prior to finalization.
DISTRIBUTION CODE:
DFOID COPIES RECEIVED: LTR J ENCL t
SIZE: /+
TITLE: Direct Flow Distribution:
50 Doc 1<et (PDR Avail )
NOTES:
RECIPIENT ID.
INTERNAL. FILE CENTER EXTERNAL:
NOAC COPIES LTTR ENCL 1
a REC IP IENT ID CODE/MANE NUDOCS-ABSTRACT NRC PDR COP IES LTTR ENCL D
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME'OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUXBER OF COP IES REQUIRED:
LTTR e
ENC(
4
0
98-SID-366 Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 AUG 1g 1998 Mr. Scott Boynton, Mail Stop 927N Nuclear Regulatory Commission c/o Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352
Dear Mr. Boynton:
DRAFT ENVIRONMENTALASSESSMENT (EA) FOR THE WASHINGTONPUBLIC POWER SUPPLY SYSTEM (SUPPLY SYSTEM) SUBLEASE FOR THEALUMINUM SMELTER PLANT,HANFORD SITE, RICHLAND,WASHINGTON In conformance with the U.S. Department ofEnergy's (DOE) National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021), enclosed is the subject draft EA foryour review prior to finalization. Please provide your written comments to me within 30 days of
'eceipt ofthe document.
The purpose and need ofthis EA is that DOE, Richland Operations Office needs to consider a request fiom the Supply System for approval ofa sublease from the Supply System, or transfer offee simple title Rom DOE for construction and operation ofan aluminum smelter plant.
Ifyou have any questions about this proposed action, please contact Shannon Ortiz, Site Infrastructure Division, on (509) 373-0908.
Questions about the NEPA process may be directed to me on (509) 376-6667.
Sincerely, SID:SMO Enclosure
/~ax Paul F. X. Dunigan, Jr.
NEPA Compliance Officer cc w/o encl:
C. M. Borgstrom, EH-42 S. Frank, EM-75 9809ii0069 9808i9 PDR
" ADOCY 05000397 P
PDR C'-'
~0
4