| Start date | Site | Title |
---|
IR 05000298/2024003 | 29 May 2025 | Cooper | Integrated Inspection Report 05000298/2024003, Disputed Non-Cited Violation Revised |
ML25107A143 | 27 May 2025 | | IP 60854 Preoperational Testing of an Independent Spent Fuel Storage Installation |
05000382/LER-2025-001, Inoperability of Startup Transformer a Results in a Condition Prohibited by Technical Specifications | 23 May 2025 | Waterford | Inoperability of Startup Transformer a Results in a Condition Prohibited by Technical Specifications |
IR 05000263/2025001 | 12 May 2025 | Monticello | Integrated Inspection Report 05000263/2025001 |
IR 05000458/2025001 | 6 May 2025 | River Bend | Integrated Inspection Report 050004582025001 |
IR 05000528/2025012 | 1 May 2025 | Palo Verde | NRC Inspection Report 05000528/2025012 and 05000529/2025012 and 05000530/2025012 |
ML25099A251 | 9 April 2025 | 05200050 | LLC - Part 2, Chapter 6, Engineered Safety Features, Revision 2 |
ML25099A250 | 9 April 2025 | 05200050 | LLC - Part 2, Chapter 5, Reactor Coolant System and Connecting Systems, Revision 2 |
L-2025-054, Subsequent License Renewal Application - Fourth Annual Update Revision 1 | 1 April 2025 | Point Beach | Subsequent License Renewal Application - Fourth Annual Update Revision 1 |
ML25017A333 | 6 March 2025 | Farley | Issuance of Amendment Nos. 253 and 250 to Revise Technical Specification 3.6.6, Containment Spray and Cooling Systems, Surveillance Requirement 3.6.6.8 to Change Spray Nozzle Blockage Testing Frequency |