ML17291A989

From kanterella
Jump to navigation Jump to search
Forwards Revised Marked Up TS Page 3/4 4-4,incorporating Sruveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Applicable for Each Surveillance Per Conversations W/Nrc
ML17291A989
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/16/1995
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17291A990 List:
References
GO2-95-152, NUDOCS 9508290193
Download: ML17291A989 (5)


Text

-PRZORXTY (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9508290193 DOC.DATE: 95/08/16 NOTARIZED: NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 p AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System R RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) 1

SUBJECT:

Forwards revised marked up TS page 3/4 4-4,incorporating sruveillan'ce notes in front of surveillances 4.4.1.2.1 &

4.4.1.2.2 for jet, pump operability to clarify that notes 0 applicable for each surveillance per conversations w/NRC.

DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR I Submittal: General Distribution ENCL J SIZE: ~5 R TITLE: OR NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 CLIFFORD,Z 1 1 ACRS 'NTERNAL:

6 6 E CENTER 01 1 1 NRR/DE/EMCB 1 1 HQHzI 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D N

NOTE .TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17

f

~ 4 p

V ci si WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 August 16, 1995 G02-95-152 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATION SURVEILLANCES 4.4.1.2.1 AND 4.4.1.2.2 FOR JET PUMP OPERABILITY - SUPPLEMENTAL INFORMATION

References:

1) Letter GO2-92-011, dated January 14, 1992, GC Sorensen (SS) to NRC, "Request for Amendment to Technical Specification Surveillances for Jet Pump Operability"
2) Letter GI2-92-161, dated June 15, 1992, WM Dean (NRC) to GC Sorensen (SS), "Issuance of Amendment No. 106 for the Washington Public Power Supply System Nuclear Project No. 2 (TAC No. M79393)"
3) Letter GO2-95-031, dated February 10, 1995, JV Parrish (SS) to NRC, "Request for Amendment to Technical Specification Surveillances 4.4.1.2.1 and 4.4.1.2.2 for Jet Pump Operability - Supplemental Information" The purpose of this letter is to provide a revised marked up copy of Technical Specification page 3/4 4-4. These editorial changes are consistent with recent conversations between Supply System and Staff personnel and are included in Attachment 1.

The editorial changes include incorporation of the surveillance notes in front of each surveillance so that it is clear that the notes apply to each surveillance. In addition, a specific, rather than implied request for incorporation of a 4.0.4 exemption to the referenced surveillances is included in the notes.

S'508290193 950816 PDR ADOCK 05000397 P '

PDR

4; Page 2 REQUEST FOR AMENDMENT TO TECH SPEC SURVEILLANCES 4.4.1.2.1 AND 4.4.1.2.2 FOR JET PUMP, OPERABILITY - SUPPLEMENTAL INFORMATION Reference 3 discussed the LCO regarding 4.0.4 applicability originally requested by Reference

1. The Reference 1 surveillance change request had included a note to the applicability stating:

"The provisions of Specification 4.0.4 are not applicable provided that this surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after exceeding 25% of RATED THERMALPOWER." Consistent with verbal discussion with the Staff regarding the relevancy of the 4.0.4 exemption to the surveillance, rather than the applicability, the 4.0.4 exemption request details were relocated to the surveillance. Specific reference to 4.0.4 was deleted because the two notes implied an "other specified applicable condition" as called out in 4.0.4, Also consistent with the discussion, the surveillance note was revised for consistency with the Improved Technical Specifications to allow 24 rather than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for completion of the surveillance.

The implied request for a 4.0.4 exemption, although consistent with some other Technical Specifications, is clearly not as apparent as a specific statement. Therefore the surveillance note is being revised to include the specific reference to 4.0.4.

This request does not impact the No Significant Hazards Consideration and Environmental Considerations summaries provided by Reference 3. This request clarifies but does not revise the basis for, or intent of, the changes requested by Reference 3.

Implementation within 30 days from the amendment date is hereby requested.

Should you have any questions or desire additional information regarding this matter, please call me or D.A, Swank at (509) 377-4563.

Sincerel

~ ~