ML17292A385

From kanterella
Jump to navigation Jump to search
Informs That Pilot Initial License Exam Outline to Be Administered by NRC on 961007,completed
ML17292A385
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/26/1996
From: Albers J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
GO2-96-148, NUDOCS 9608050208
Download: ML17292A385 (3)


Text

CATEGORY

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9608050208 DOC.DATE: 96/07/26 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION ALBERSIJ.P. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION GWYNN,T.P. Region 4 (Post 820201)

SUBJECT:

Informs that pilot initial license exam outline to be administered by NRC on 961007,completed.

DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR I TITLE: Operator Licensing Examination Reports ENCL 0 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD COLBURN,T 0

INTERNAL: ACRS ILE CENTER NRR/DRCH/HHFB NRR DR RGN4 FILE 01 EXTERNAL: NOAC NRC PDR D

0 N

iVOTE TO ALL "RIDS" RECIPIEiVTS:

PLEASE HELP US TO REDUCE WASTE! COiVTACT THE DOCUMEVT COVTROL DESK, ROOM OWFIV. 5D-5(EXT. 4I5-2085) TO ELIM iVATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMEVTS YOU DOiV' YiEED:

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL

WASHliVGTOYi PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George 1Vashington 1Vay ~ Richland, '1Vashington 99352-0968 ~ (509) 372-5000 July 26, 1996 G02-96-148 Docket No. 50-397 Mr. T.P. Gwynn, Director Division of Reactor Safety U.S. NRC, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064

Dear Mr. Gwynn:

SUBJECT:

WNP-2 OPERATING LICENSE NPF-21 PROPOSED PILOT INITIALLICENSE EXAMINATIONOUTLINE The proposed pilot initial license examination outline for the exam to be administered by the Nuclear Regulatory Commission on October 7, 1996, has been completed. The examination outline is being mailed to Mr. Howard Bundy at Region IV on Friday, July 26, 1996, for evaluation and approval.

Per the requirement in Examiner Standards-201, the proposed examination outline is being sent to Mr. Bundy in a double envelope marked "FOR OFFICIAL USE ONLY" and "TO BE OPENED BY ADDRESSEE ONLY". WNP-2 requests that these materials be withheld from public disclosure until after the examination has been completed.

If you have any comments or concerns, please contact W.D, Shaeffer, Superintendent, Operations Training at (509) 377-8266.

Respectfully, J.. Albers Nuclear Training Manager (MD 1027)

CC: TO McKernon - NRC/RIV JL Pellet - NRC/RIV Document Control Desk - NRC TG Colburn - NRR NS Reynolds - Winston and Strawn NRC Sr. Resident Inspector - 927N DL Williams - BPA/399 960805020S 960726 PDR ADOCK 05000397 V PDR

C C