ML17291A823

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Cycle 11,Core Operating Limits Rept.
ML17291A823
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/30/1995
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17291A824 List:
References
GO2-95-103, NUDOCS 9506080479
Download: ML17291A823 (3)


Text

. PRIDRITY ACCELERATED RIDS PROCESSIX 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9506080479 DOC.DATE: 95/05/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 0 to "Cycle 11,Core Operating Limits Rept."

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE TITLE: OR Submittal: General Distribution NOTES RECX PIFNT COPXES RECIPIENT COPIES ID CODE/ll,'.ME LTTR ENCL XD CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 CLX FFORD, J 1 1 INTERNAL: ACRS 6 6 1 1 NRR/DE/EMCB 1 1 NRR/DRCH/III CB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NU~OCS-r BSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL: NOAC NRC PDR NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE KVASTE! CONTACT TI IE DOCUMENT CONTROL DESK, ROOKI Pl-37 (EXT. 504-2083 ) TO ELIihfl.'PATE YOUR NAifE PRO~I DISTRIBUTION LISTS I:OR DOCUMENTS YOU DONL'ED!

TOTAL NUMBER OF COPXFS REQUIRED: LTTR 18 ENCL 17

f WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 May 30, 1995 G02-95-103 Docket No. 50-397 V.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 CYCLE 11 CORE OPERATING LIMITS REPORT (COLR)

The Supply System hereby submits the COLR 95-11, Revision 0, in accordance, with the requirements of WNP-2 Technical Specification 6.9.3.4. The operating limits in the COLR resulting from the Cycle 11 reload and licensing'analyses have been evaluated against the criteria of 10 CFR 50.59. No unreviewed safety questions were identified and no changes to the Technical Specifications are necessary. The COLR has been reviewed and approved by the WNP-2 Plant Operating Committee.

Should you have any questions or desire additional information regarding this matter, please call me or D. A. Swank at (509) 377-4563.

Sincerely,

. Parrish (Mail Drop 1023)

Vice-President, Nuclear Operations DAS/ml Attachment CC: LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N PDR P 'DR 9506080479"~950530 ADGCK 05000397