MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] |
Text
PRIORITY 1 ACCELERATED RZDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9510020202 DOC.DATE: 95/09/27 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 P AUTH. NAME PARRISH,J.V.
'UTHOR AFFILIATION Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards relief request 2ISI-16 for temporary non-code I
repair of 'standby svc water piping per GL 90-05. 0, DISTRIBUTION CODE: A047D, COPIES RECEIVED:LTR ENCL'IZE:
TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-89-04 NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL 6 0 AEOD/SPD/RAB 1 1 LE CEN'Ig 1 1 1 NRR/DE/EMCB 1 1 NOD~
OGC/HDS3 MEB 1 1
1 0
NUDOCS-ABSTRACT RES/DSIR/EIB 1
1 1
1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D
0 N
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT'HE DOCUMENT CONTROL DESKi ROOM OWFN SDS (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 12
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 September 27, 1995 G02-95-200 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject; WNP-2, OPERATING LICENSE NPF-21 RELIEF REQUEST FOR TEMPORARY NON-CODE REPAIR PER GENERIC LETTER 90-05 OF STANDBY SERVICE WATER PIPING
References:
(1) NRC Generic Letter 90-05, "Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping" dated June 15, 1990 (2) Internal NRC memorandum dated August 16, 1990, from James E.
Richardson, "Follow-up on Generic Letter 90-05 Regarding Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping" This letter submits for NRC approval relief request 2ISI-16. In accordance with Generic Letter 90-05 (Reference 1) and 10CFR50.55a(g)(6)(i), we request relief from performing an immediate Code repair of a small leak in the ASME Section III, Code Class 3 standby service water system (SW) loop A at WNP-2. The relief request is provided as Attachment 1.
A through-wall flaw was discovered during a system line up by an equipment operator in the SW piping. A rubber gasket, clamped over the flaw, has been installed for housekeeping purposes (Reference 2). To perform a repair per the requirements of ASME Section XI would require the system and its supported safety functions to be taken out of service and entry into a limiting condition for operation (LCO). The Supply System continues to evaluate the potential for performing Code repairs or system modifications on line. Pursuant to 10CFR50.55a(g)(6)(i) and using the guidance of Generic Letter 90-05, relief is requested for the installed temporary non-Code repair until a permanent Code repair or modification can be performed. The Code repair will be implemented at the next scheduled outage exceeding 30 days, but no later than the completion of the next refueling outage which is currently scheduled to start in April/May, 1996, 9510020202 950927 PDR ADOCK 05000397 9 PDR
l Page 2 TEMPORARY NON-CODE REPAIR PER GENERIC LETTER 90-05 OF STANDBY SERVICE WATER PIPING Should you have any questions or desire additional information regarding this matter, please call me or D. A. Swank at (509) 377-4563.
Sincerely,
. V. Parrish (Mail Drop 1023)
Vice President, Nuclear Operations DPR/dpr CC: LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N
ATTACHMENT 1 RELIEF REQUEST NO. 2ISI-16 Component for Which Relief is Requested Repair of pinhole leak located in ASME Section III Code Class 3 Standby Service Water (SW) loop A piping, approximately 78 inches upstream of west flange connection at SW-PCV-38A.
See Figures 1 and 2 for location of the leak.
Section XI Requirements ASME Section XI, 1989 Edition no Addenda, Article IWA-4000 requires the removal of an unacceptable defect and a subsequent repair.
Code Requirement from Which Relief is Requested Requirement to perform a repair per Article IWA-4000 Basis for Relief Using the guidance from Generic Letter 90-05, it is impractical to perform a Code repair of this flaw during plant operations. To perform a Code repair of the flaw requires entry into a limiting condition for operation (LCO) with the potential for a forced plant shutdown should the repair not be completed within the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action Statement time limit. During the LCO this SW loop and its supported safety-related equipment will not be available to perform their safety function.
Alternative Repair A temporary non-Code repair has been performed using the guidance of Generic Letter 90-05.
This repair consists of a rubber gasket clamped over the flaw.
Justification for the Granting of Relief The format of this justification follows the format of Generic Letter 90-05, Enclosure 1.
A. Introduction A small through-wall flaw exists in the SW "A" division discharge piping to the spray pond header in the "B" pond. The flaw exists in line 18"SW(21)-2 (see Figures 1 and 2) within the SW Pumphouse-A valve pit. The leak rate is estimated at one quarter (0.25) gpm. Two additional areas of wall thinning near the through-wall flaw were found during the augmented inspection. These areas are approximately 5 and 6.5 inches from the through-wall flaw.
Page 1
ATTACHMENT 1 RELIEF REQUEST NO. 2ISI-16 B Sco e Limitations and S ecific on ideration
- 1. Scope The non-Code repair was made to ASME Section III, Code Class 3, 18 inch diameter standard schedule (0.375 inch wall) ferritic steel pipe (SA-106, GR B). The operating pressures and temperatures are 216 psig and 32 to 106 degree F respectively'. The repair will cover the through-wall flaw and the two nearby areas of wall thinning.
- 2. Limitations The flaw originated from the inner diameter of the pipe.
The flaw was detected during plant operations.
The flaw will be repaired in accordance with ASME Section XI, IWA-4000 requirements at the next scheduled outage exceeding 30 days, but no later than the next refueling outage in the Spring of 1996.
- 3. Specific Considerations Flooding~
A 5 inch diameter overflow pathway is provided between the valve pit and the pump intake well. This overflow path assures that ifthe non-safety related sump pump fails then flooding of the valve pit will be limited to approximately 4 feet in depth. There is no safety-related equipment in the valve pit below the elevation of the overflow pathway. The assumed maximum defect-induced orifice (0.75 inch diameter - see Other Interactions - Erosion for derivation ) cannot exceed the discharge capability of the 5 inch diameter overflow penetration. Finally, the lost volume of spray pond inventory that would be trapped in the valve pit (( 20,000 gallons) is small in comparison to the spray pond volume of nearly 12 million gallons.
"Process Piping and Pipe Support ASME Section III Design Specification" (Certified Design Specification), page 1-67 PER 295-1002, Follow-up Assessment of Operability, pg 3 Page 2
S h
C
ATTACHMENT 1 RELIEF REQUEST NO. 2ISI-16 Spraying There is no safety-related equipment in the area of the leak that would be affected by spray from the leak.
Loss of Flow'he operating system pressure at the spray header discharge is approximately 20 psi. A square edged 0.75 inch diameter,(see Other Interactions - Erosion for derivation ) orifice working at a differential pressure of 20 psi will yield a volume flow rate of less than 50 gpm at standard conditions.
The total SW flow to the spray header is greater than 10,000 gpm. Consequently, a spray pond bypass flow of 50 gpm directly to the SW pump intake willresult in an approximate 0.1
'F increase in the pump discharge temperature (i.e. a SW cooling flow temperature increase based on the ratio of bypass flow to total supply flow). This magnitude of cooling flow temperature increase is not significant and is well within the error limits of process system thermal hydraulic analyses.
Other Interactions - Erosion4 Erosion of the defect is not easily defined since the material condition adjacent to the defect is not known. Volumetric NDE inspections do reveal that outside of a 0.38 inch radius the piping wall thickness is not eroded (i.e. the nominal full piping section thickness is maintained). Ifit is assumed that the piping material is degraded in the vicinity of the defect area, which cannot be NDE inspected, then the resultant maximum circular diameter would be equivalent to a 0.75 inch diameter hole.
Integrity of Design Load The total weight of the non-Code repair material added to the pipe is bounded by the seismic calculation for this pipe and does not affect the existing seismic calculation.
ibid, pg 2-3 4
ibid, pg 2 Page 3
ATTACHMENT 1 RELIEF REQUEST NO. 2ISI-16 Failure Consequences The failure of this piping would result in a loss of one of the two SW loops and subsequent loss of safety-related equipment supplied by this loop. Plant procedures and Technical Specifications provide guidance for placing the plant in a cold shutdown condition.
Impact on Safe Shutdown Capability The procedure PPM 4.4.5.1 "Loss of Standby Service Water System" provides guidance to the operators when SW is lost and Technical Specification 3.7.1 defines the LCO for loss of SW.
Integrity of Repair An assessment of leakage through the temporary non-Code repair will be made on a weekly basis. An NDE examination will be performed every 3 months to assess the integrity of the temporary non-Code repair. If degradation is noted during the above assessments an engineering evaluation willbe performed to assess the rate and extent of degradation to assure structural integrity is maintained during the life of the temporary non-Code repair.
C. Evaluation
- 1. Flaw Detection During Plant Operation and Impracticality Determination The flaw in the SW piping was found during a system line up by operations personnel. The section of piping where the flaw is located can not be repaired without taking this loop of the SW out of service. This would initiate a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limiting condition for operation (LCO).
At this time a complete Code repair cycle has not been identified that can be performed within this time frame.
- 2. Root Cause Determination and Flaw Characterization From NDE results, the defect appears to be localized. Preliminary determination is that the flaw was caused by corrosion.
Page 4
ATI'ACHMENT 1 RELIEF REQUEST NO. 2ISI-16
- 3. Flaw Evaluation A fracture mechanics evaluation of the SW through-wall defect has been completed and documented by Supply System Calculation ME-02-95-22. This calculation concludes that the defect size is well within acceptable size limits as established by the fracture mechanics methods and criteria of Generic Letter 90-05 (Enclosure 1, C.3a). Evaluation of the through-wall defect is deemed bounding with respect to the two partial-depth defects which are found in the local area of the leakage defect. The partial-depth defects are linearly separated by a distance which is more than 1.5SQRT(Rt) (i.e. 2.75 inches) and therefore stress-field interactions are not significant (i.e. the defects do not structurally interact).
- 4. Augmented Inspection To assess the overall degradation of SW, augmented ultrasonic examinations were performed on 5 locations that were considered susceptible to similar degradation. The augmented examinations were completed within 15 days after the flaw was discovered. Two areas of wall thinning within the local area, but greater than 5 inches from the flaw were noted. An area of pipe wall thinning was noted in a similar location on the B SW loop. This thinning was evaluated and determined to be acceptable for continued operations. The sample size was further expanded to an additional 5 locations. No further adverse degradation was found in the second sample.
Implementation Schedule The temporary non-Code repair is to be implemented upon NRC approval of the relief request.
Page 5
N
'A'A AHA HX LO QFE SFP MU 75A LOOP A I
Ps --
SW.P-1 A pa I-EORMS I
HPCS SW 170B 165B 29 68A SW POND A p LO VI RO I
~ AEMOVABLE SPOOL J PIECE SFP MU
--+PS ~AMS 933A RHR HX 9 75B LOOP B 2B QZQI(
LOCk7l oP CO I
I BI SW.P-1 B 170A Ch 165A o CC o 5g5 o o LO o o 8 og R~
8 68B SW POND B AE LO RO 8904?6.401LT I
MARCH 1992 PCV-38B 12B SW FIGURE 4. STANDBY SERVICE WATER ( SIMPLIFIED )
t STANDBY SERVICE WATER PUMP HOUSE 1A (APPROXIMATE DIMENSIONS) 18" {5 ORIFICE FLANGE, 3008, SCH. STD, RF, WN (REF: SW-FE-1A)
I ~ I 18"@ PIPE, SCM. STD, SA 106 GR B ASME III/3 12" FLANGE SUPPLIED SW-PCV-38A EL.
18" 433'-2 SW{21i-2 I
t L 1 I
I I
I I
I I
I go~ FLOW I
I I LJ III I
18" X 12" REDUCER Ch 2" SOCKOLET Q
LOCATION OF LEAK 1 1/2" SOCKOLET Q NAMEPLATE
~REF WG ELEVATION LOOKING NORTH SW-296-54.57 9/13/95 CVIIIt 215-00,1040
t f