GO2-94-081, Forwards Rev 1 to COLR 93-9, WNP-2,Cycle 9 Colr. COLR Reviewed & Approved by Util Plant Operating Committee
| ML17290B106 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/13/1994 |
| From: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17290B107 | List: |
| References | |
| GO2-94-081, GO2-94-81, NUDOCS 9404200270 | |
| Download: ML17290B106 (3) | |
Text
ACCELERATED DIS REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9404200270 DOC.DATE: 94/04/13 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILXATION PARRISH,J.V.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits COLR 93.9,rev 1, in accordance w/requirements of WNP-2 TS 6.9.34.COLR has been reviewed 6 approved by WNP-2 plant operating committee.
DISTRXBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TXTLE: OR Submittal:
General Distribution NOTES:
R D
RECIPIENT ID CODE/NAME PDIV-3 LA CLIFFORD,J INTERNAL: ACRS NRR/DORS/OTSB NRR/DRPW NRR/DSSA/SRXB
- C/bFD REG FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 6
6 1
1 1
1 1
1 1
0 1
1 1
1 RECIPIENT ID CODE/NAME PDIV-3 PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 1
1 D
nD D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE XVAPKE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 20 D
D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352-0968
~ (509) 372-5000 April 13, 1994
~
G02-94-081 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 CYCLE 9 CORE OPERATING LIMITSREPORT (COLR)
Reference:
1) 2)
Letter G02-93-155, JV Parrish (SS) to NRC, "Cycle 9 Core Operating Limits Report (COLR)"
Letter G02-93-297, JV Parrish (SS) to NRC, "Generic Approval of Extended Burnup for 8X8 Fuel" The Supply System is submitting the COLR 93-9, Revision 1, in accordance with the requirements of WNP-2 Technical Specification 6.9.3.4.
The COLR has been reviewed and approved by the WNP-2 Plant Operating Committee.
Revision 1 to COLR 93-9 is required because the thermal limits provided in COLR 93-9 Revision 0, were based on a maximum cycle exposure of 273 Effective Full Power Days (EFPD) of operation.
Siemens Pow'er Corporation (SPC) performed an analysis which confirmed that the thermal limits provided by COLR 93-9 Revision 0 were applicable to support plant coastdown through the end of May 1994.
Revision 1 of COLR 93-9 adds the reference for the SPC coastdown analysis to the COLR.
Although Cycle 9 is currently scheduled to end on April29, 1994, this revision to the COLR will support continued operation through the end of May.
However, WNP-2 SPC 8X8 fuel assemblies are limited to 35 GWd/MTU. An extension to that limitwas requested by Reference 2.
The Supply System willcontinue to monitor the SPC 8X8 assembly exposure to ensure the limitis not exceeded without prior approval from the NRC.
9404200270
~404~3 PDR
'ADQCK 05000397 9
PDR.','
Page Two CYCLE 9 CORE OPERATING LIMITSREPORT (COLR)
Should you have any questions or desire additional information regarding this matter, please call me or H. E. Kook at (509) 377-4278.
Sincerely, J. V. Parrish (Mail Drop I 3)
Assistant Managing Director, Operations MGE/bk
Attachment:
WNP-2 Cycle 9 Core Operating LimitReport, revised pages CC:
LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn JW Clifford-NRC DL Williams - BPA/399 NRC Site Inspector - 927N