MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] |
Text
PRIORITY 0 (ACCELERATED RZDS PROCESSING)
REGULATORY'INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9508020116 DOC.DATE:- 95/07/18 NOTARIZED: NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 P AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION R Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Rev 22 to TR WPPSS-QA-004, "Operational QA Program I Description." Rev reflect mgt & organizational changes &
modifies reporting requirements as listed. 0 DISTRIBUTION CODE: Q004D TITLE: QA COPIES RECEIVED'LTR Topical Report, Change, Amendment,
+ ENCL g SIZE:
or Correspondence Doc et Utili NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL CLIFFORD,J 1 1 INTERNAL: ACRS 8 8 DRS/RGN1 1 1 DRS/RGN2 1 1 RS N3 1 1 DRS/RGN4 1 1 FILE C TER 01 2 2 NRR/DISP/IMS 1 1 /DOTS/TQMB 1 1 OC/LFDCB 1 1 RGN4 FILE 1 1 EXTERNAL: DMB/OSS 1 1 IHS 1 1 NRC PDR 1 1 N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWEN 5DB (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED(
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352968 ~ (509) 372-5000 July 18, 1995 G02-95-136 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 REVISION 22 TO OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)
The Supply System, in accordance with 10 CFR 50.54 (a)(3), has made changes to the U.S.
Nuclear Regulatory Commission (NRC) approved topical report, "Operational Quality Assurance Program Description (WPPSS-QA-004)."
Revision 22 to the OQAPD was necessary to reflect management and organizational changes.
This revision modifies the reporting responsibilities as listed below:
REVISION 22 Changed Senior Staff level positions.
Changed position titles.
Deleted one level of management in most organizations.
Independent Safety Engineering Group (ISEG); administering the nonconforming condition and corrective action process (PER); root cause determination and evaluation of industry operating experiences have been reassigned to Director, Regulatory and Industry Affairs.
Radiological Environmental Monitoring Program and Bioassay Program responsibilities have been reassigned to the Plant General Manager.
Environmental Sciences responsibilities have been reassigned to the Plant General Manager.
The, supply, engineering, and efficient in-core management of nuclear fuel and transient analysis responsibilities have been reassigned to the Plant General Manager.
The responsibility for technical maintenance of the simulator to support operator training and testing was reassigned to the Director, Nuclear Training.
9508020116 950718 PDR ADOCK 05000397 io(
P PDR
Page 2 REVISION 22 TO OPERATIONALQUALITYASSURANCE PROGRAMDESCRIPTION (WPPSS-QA-004)
The position and responsibilities for the Manager, WNP-2 Projects are now listed under the Director, Engineering.
Reliability and availability analysis to improve plant performance, safety and maintainability function has been reassigned to the Director, Regulatory and Industry Affairs.
Vertical lines have been placed in the right-hand margin to identify text changes, additions and deletion s.
Should you have any questions or desire additional information regarding this matter, please call me or G. O. Smith at (509) 377-6042.
Sincerely,
. Parrish (Mail Drop 1023) ice President, Nuclear Operations DAK/ml
Enclosures:
- 1) Description of OQAPD, Rev. 22 changes
- 2) OQAPD Revision 22 CC: . LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N
Enclosure 1 Page 1 of 5 OQAPD Rev. 22 m I in A ivi D n The Supply System Organization is being flattened by removing one level of management for most organizations. The Training, Support Services and Regulatory Programs Divisions have been upgraded to the Director level and now report to the Vice President, Nuclear Operations. This revision included reassignment of job functions, changes in organizational responsibilities and position titles.,
Senior Staff level positions and new titles.
- a. The position Assistant Managing Director, Operations has a new title of Vice President, Nuclear Operations.
- b. The position WNP-2 Plant Manager has a new title of Plant General Manager.
- c. The position Director, Quality Ass'urance has a new title of Director, Quality.
- d. The position Manager, Nuclear Training has a new title of Director, Nuclear Training.
e, The position Manager, Support Services has a new title of Director, Support Services.
- f. The position Manager, Regulatory Programs has a new title of Director, Regulatory and Industry Affairs.
- 2. To flatten the organization, the following positions which were described in Rev. 21 have been deleted from Rev. 22:
ae Manager, Quality Assessments, Paragraph 1.3.2.1.1
- b. Manager, WNP-1 and WNP-3 QA, Paragraph 1.3.2.1.1.3 C. Manager, Quality Support, Paragraph 1.3.2.1.2
- d. Manager, Design Engineering, Paragraph 1.3.2.9.1
- e. Manager, Engineering Programs, Paragraph 1.3.2.9.2
- f. Manager, Engineering Services, Paragraph 1.3.2.9.3
- 3. The key changes within the Quality Assurance Directorate are:
The positions Manager, Quality Assessment; Manager, Quality Support; and Manager, WNP-1 and WNP-3 were deleted. Managers previously reporting to these positions report directly to the Director, Quality. The Manager, Plant Assessment title was changed to Manager, Quality Services. The Manager, Plant Support Assessment title was changed to Manager, Quality Support Services. The Manager, Procurement Quality
Enclosure 1 Page 2 of 5 Assurance title was changed to Manager, Supplier Quality. The functions performed by the Manager, Operating. Events Analysis and Resolutions and Manager, Nuclear Safety Assurance Division were combined and transferred to Director, Regulatory and Industry Affairs.
Responsibilities listed in Paragraph 1.3.2.1.1 Rev. 21 for the Manager, Quality Assessment have been reassigned to the Director, Quality or other managers within the Quality Assurance organization.
ii. Responsibilities listed in Rev. 22 for the Manager, Quality Services and Manager, Quality Support Services as shown in Paragraph 1.3.2.1.1 have been clarified to remove duplicate/redundant statements.
Responsibilities listed in Paragraph 1.3.2.1.2 Rev. 21 for the Manager, Quality Support that applied to vendor qualification, inspection, receiving inspection, or audits of vendor facilities have been reassigned to Manager, Supplier Quality, All other responsibilities have been reassigned to the Director, Regulatory and Industry Affairs.
lv. The functions listed in Paragraph 1.3.2.1.2.2 and 1.3.2.1.2.3, Rev. 21:
Independent Safety Engineering Group gSEG); administering the nonconforming condition and corrective action process (PER); root cause determination and evaluating industry operating experiences have been reassigned to the Director, Regulatory and Industry Affairs.
The following revisions have been made to Section 1 - Organization, for the Plant General Manager, Paragraph 1.3.2.2 Rev. 22.
ao Revised Paragraph 1.3.2.2 to reflect new position titles.
- b. Radiological Environmental Monitoring Program and Bioassay Program responsibilities previously assigned to Corporate Radiological Health Officer Paragraph 1.3.2.7 Rev. 21 have been transferred to Plant General Manager.
C. Environmental sciences responsibilities previously assigned to the Corporate Chemist Paragraph 1.3.2.6 Rev. 21 have been transferred to Plant General Manager.
- d. The supply, engineering, and efficient in-core management of nuclear fuel and Transient analysis responsibilities assigned to Director, Engineering Paragraph 1.3.2.9 and Manager, Engineering Services Paragraph 1.3.2.9.3 Rev. 21 have been transferred to Plant General Manager.
Enclosure 1 Page 3 of 5
- 5. The following changes have been made to Section 1 - Organization, Rev. 22 for the Director, Nuclear Training Paragraph 1.3.2.3.
- a. =
Revised to reflect new position titles.
- b. Responsibility'or technical maintenance of the simulator to support operator training and testing was added. This function was assigned to the Manager, Simulator Project Paragraph 1.3.3.3 Rev. 21. That position has been deleted.
- 6. The following changes have been made to Section 1 - Organization, Rev. 22 for the Director, Support Services.
- a. Paragraph 1.3.2.4, 1.3.2.4.1, 1.3.2.4.2, and 1.3.2.4.3 were revised to reflect new position titles.
- 7. The position and responsibilities for The Manager, WNP-2 Projects Paragraph 1.3.2.5.
Rev. 21 are listed in Rev. 22 under Director, Engineering.
- 8. The following changes have been made to Section 1 - Organization, Paragraph 1.3.2.5 Rev. 22 for the Corporate Chemist. The responsibilities listed in Rev. 21 for environmental sciences function which performs nonradiological monitoring and Fitness For Duty chemical analysis has been reassigned to the Plant General Manager .
- 9. The following changes have been made to Section 1 - Organization, Paragraph 1.3.2.6 Rev. 22 for the Corporate Radiological Health Officer. The responsibilities listed in Rev. 21 for radiological environmental monitoring program and bioassay program have been reassigned to the Plant General Manager.
- 10. The following changes have been made to Section 1 - Organization, Paragraph 1.3.2.7 Rev. 22 for the Director, Regulatory and Industry Affairs. Changes include; position title change for the Director, editorial clarification on responsibilities, and added four (4) managers reporting to the Director. New responsibilities include:
ao Administering the WNP-2 industry and in-plant operating experience programs; providing the Independent Safety Engineering Group gSEG) functions; and administering the nonconforming condition and corrective action processing including assisting the cognizarit organization in evaluation and assisting in determination of the root cause for plant-related events. These function were listed in Rev. 21 as responsibilities under the Director, Quality Assurance.
- b. Reliability and availability analysis to improve plant performance, safety and maintainability. These function were listed in Rev. 21 as responsibilities under the Director, Engineering and Manager Engineering Services.
Enclosure 1 Page 4 of 5
- 11. The following changes have been made to Section 1 - Organization, Paragraph 1.3.2.8 Rev. 22 for the Director, Engineering.
ao The position and responsibilities for Manager, WNP-2 Projects listed in Paragraph 1.3.2.5 Rev. 21 have been reassigned to Engineering.
- b. The responsibilities for Fuels Engineering, Safety Analysis (Transient Analysis Function) and Plant Support Engineering listed in Rev. 21 have been transferred to the Plant General Manager.
C. The responsibilities for Safety Analysis (PSA Function) listed in Rev. 21 have been transferred to the Director, Regulatory and Industry Affairs.
- d. Position titles for the various managers within the Engineering organization have been revised.
- e. The responsibilities for the managers reporting to the Director, Engineering have been removed from the OQAPD and will be described in Chapter 13 of the WNP-2 FSAR.
- f. The responsibilities for the Director, Engineering were clarified.
- 12. Title changes were made in Paragraph 1.3.3 Rev, 22 for the Director, Projects and responsibilities for Projects WNP-3, WNP-4, and WNP-5 were transferred to The Chief Financial Officer. Responsibilities for the managers reporting to the Director, Projects were removed from the OQAPD.
13, Paragraph 1.3.4 Rev. 22 for the Chief Financial Officer was changed to add the responsibilities for sale and demolition of Projects WNP-3, WNP-4, and WNP-5.
- 14. Figures 1-1 and 1-2 Rev. 22 have been revised to show the revised organizational structure and position titles.
- 15. Section 2 - Quality Assurance Program, Rev. 15 includes new position titles in paragraphs 2.2.2 and 2.2.6. Table 2-1 was changed to delete reference to NOS-38, Radiation Protection Program, and NOS-48, Application of 10CFR50.59.
The Radiation Protection Program NOS-38, is not governed by the requirements of 10CFR50, Appendix B. The Radiation Protection Program is governed by 10CFR20.
NOS-38 was removed from the program, but the requirements for performing a 10CFR50.59 review remain. All of the requirements for performing 10CFR50.59 reviews are located in PPM 1.3.43, which is the implementing procedure. Having both a NOS and a PPM was not necessary.
Enclosure 1 Page 5 of 5
- 16. Section 7 Rev. 7 - Control of Purchased Material, Equipment, and Services has been modified to the correct organization title in paragraph 7.2.2.b.
- 17. Appendix I Rev. 10 - Qualification Requirements has been modified to show revised position titles in paragraph I.1 and I.2.