ML17292B759

From kanterella
Jump to navigation Jump to search
Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl
ML17292B759
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/24/1999
From: Coleman D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17292B760 List:
References
GO2-99-173, NUDOCS 9909290229
Download: ML17292B759 (4)


Text

REGULA'Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9909290229 DOC.DATE: 99/09/24 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NB@ME AUTHOR AFFILIATION COLEMAN,D.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Records Management "Branch (Document Control Desk)>>( ~/gq

SUBJECT:

Forwards rev 24 to WNP-2 emergency plan,IAW 10CFR50.4(b),

50.54(q) 8 10CFR50 App E.Detailed DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR Q ENCL j synopsis of changes, encl.

TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedures, SIZE: 1. + Z 0 C T

Q NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL CUSHING,J 1 1 0

INTERNA . FILE CENTER 01 2 2 IRO/HAGAN,D. 1 1 1 1 NUDOCS -ABSTRACT 1 1 R EXTERNAL: NOAC 1 1 1 1 4

)~<~4 V 4 Q i D')l53RRI

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 8 ENCL 8

EWER&Ã NOR TH NfES T PO. Box 968 a Richland, Washington 99352-0968 September 24, 1999 G02-99-173 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 TRANSMITTALOF REVISION 24 TO THE WNP-2 EMERGENCY PLAN In accordance with 10 CFR 50.4(b), 50.54(q), and 10 CFR 50 Appendix E, attached is the signed original of the WNP-2 Emergency Plan, Revision 24, and a detailed synopsis of, changes.

Revision 24 provides minor enhancements to the description of the dispatch process used for state and county representatives; updated Emergency Action Levels that reflect human factor improvements; clarifications to describe backup dose projection capability and the Emergency Plan Audit distribution process. This revision reflects the name change of the company from Washington Public Power. Supply System to Energy Northwest. Revision 24 of the Emergency Plan was evaluated pursuant to the requirements of 10 CFR 50.54(q). We have determined the changes do not reduce the effectiveness of the plan as previously approved.

Should you have any questions or desire additional information regarding this matter, please contact me or Tim Messersmith at (509) 377-8568.

Respectfully, D.W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs Attachments ~)Ot t ~ i" J cc: EW Merschoff- NRC RIV I Cushing - NBR NRC Sr. Resident Inspector - 927N DL Williams - BPA/1399 TC Poindexter - Winston 2 Strawn 99092'F0229 990924 PDR ADOCK 05000397 F PDR

h~

jJ

~

A It