| Start date | Site | Title |
---|
IR 05000395/2024003 | 6 November 2024 | Summer | – Integrated Inspection Report 05000395/2024003 |
IR 05000237/2024003 | 29 October 2024 | Dresden | Integrated Inspection Report 05000237/2024003 and 05000249/2024003 |
ML24311A020 | 24 October 2024 | Columbia | Energy Northwest, Emergency Preparedness Procedure 13.14.11, Revision 018, EP Equipment |
ML24253A094 | 23 September 2024 | Dresden | License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) |
ML24274A078 | 5 September 2024 | Columbia | Generation Station - Emergency Procedure 13.14.4, Revision 058, Emergency Equipment Maintenance and Testing |
NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc | 3 September 2024 | Hatch | 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc |
ML24239A333 | 3 September 2024 | Browns Ferry | Full Audit Plan |
ML24157A079 | 8 August 2024 | Dresden | Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID L-2024-Sle-0002) (Docket Numbers: 50-237, and 50-249) |
IR 05000324/2024002 | 5 August 2024 | Brunswick 07200006 | Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 |
ML24212A221 | 2 August 2024 | Clinton | License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) |