Requests Change to Confirmatory Order Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier Corrective Actions,Per GL 92-08
ML17292B518
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/28/1998
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-08, GL-92-8, GO2-98-219, NUDOCS 9901060069
Download: ML17292B518 (5)


Text

CATEGORY 1 go REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

J ACCESSION NBR:9901060069 DOC;DATE: 98/12/28 NOTARIZED: YES DOCKET FACIL:SP-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME '-" "

AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

'Requests change to confirmatory order which modified WNP-2 OL to reflecting schedule for implementing Thermo-. Lag 330-1 fire barrier corrective actions,per GL 92-08.

DISTRIBUTION CODE: A029D COPIES RECEIVED:LTR I ENCL I SIZE: 3 TITLE: Generic Letter 92-008 Thermo-Lag 330 Fire Barrier E

NOTES:

G RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD4-2 LA 1 ' 0 PD4-2 PD 1 1 POSLUSNY,C 1 INTERNA FILE CE ER 0 1 1 NRR/DE/EELB 1 1

-1 1 1 NRR/DSSA/SPLB 1 1 NRR/KUGLER,A 1 1 RGN4 FILE 1 1 EXTERNAL: NOAC NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10

~ ~

o b

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 December 28, 1998 G02-98-219 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 REQUEST FOR CHANGE TO CONFIRIVIATORYORDER THERMO-LAG 330-1 I<<RE BARRIERS

Reference:

Letter, dated March 25, 1998, C Poslusny (NRC) to JV Parrish (SS),

"Confirmatory Order Modifying License" The purpose of this letter is to request a change to the confirmatory order which modified the WNP-2 operating license to reflect the schedule for implementing Thermo-Lag 330-1 fire barrier corrective actions. Specifically, we are requesting that the confirmatory order be changed to reflect that final implementation of Thermo-Lag 330-1 fire barrier corrective actions at VPP-2 will be completed during Fall 1999 instead of Spring 1999. The reason for the request is due to the planned transition to a 24-month fuel cycle during 1999.

In the order, the NRC stated that the Director, Office of Nuclear Reactor Regulation, may relax or rescind, in writing, any provisions of the confirmatory order upon a showing by the licensee of good cause.

The order had confirmed a commitment to complete implementation of Thermo-Lag 330-1 fire barrier corrective actions on a schedule commensurate with previous Supply System correspondence docketed in response to Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers."

Specifically, by the referenced letter, the WNP-2 operating license was modified to state that final implementation of Thermo-Lag fire barrier corrective actions would be completed during the R-14 Maintenance and Refueling Outage (Spring 1999). The reference also indicated that overall work package close-out would be completed by December 1999. The Spring 1999 date was based upon a previously-established, 12-month refueling outage schedule.

9'Mi060069, 981228, '""f PDR ADQCK <05000397(

P PDR~l

REQUEST FOR CHANGE TO CONFBMATORY ORDER THERMO-LAG330-1 FIRE SAMJERS Page 2 of 2 Although current plans are to complete the overall project as originally scheduled, we are in the process of transitioning to a 24-month fuel cycle. This requires rescheduling of the R-14 Maintenance and Refueling Outage from Spring 1999 to Fall 1999. The last remaining outage related Thermo-Lag modifications will be implemented during the R-14 outage, but in the fall time-frame. This will have no impact on the final completion schedule because the overall Thermo-Lag resolution effort will be completed by December 1999 as required by the order.

Therefore, we are proposing that the Confirmatory Order Modifying License NPF-21 be revised to read as follows:

"WPPSS shall complete final implementation of Thermo-Lag 330-1 fire barrier corrective actions at Washington Public Power Supply System, Nuclear Project No. 2, described in the WPPSS submittals to the NRC dated April 13, 1993, February 11, 1994, November 9, 1994, April 27, 1995, September 26, 1997, and December 28, 1998, during the R-14 Maintenance and Refueling Outage (Fall 1999). Overall work package close-out will be completed by December 1999."

We appreciate your assistance in this matter. Should you have any questions or desire additional information pertaining to this letter, please call PJ Inserra at (509) 377-4147.

Respectfully, JV Parrish Chief Executive Officer Mail Drop 1023 cc: EW Merschoff - NRC RIV NRC Senior Resident Inspector - 927N GA Pick - NRC RIV PD Robinson - Winston & Strawn C Poslusny, Jr - NRC NRR DL Williams - BPA/1399

STATE OF WASHINGTON )

Subject:

O eratin License NPF-21

) Reactor Stabili Lon Term Solution COUNTY OF BENTON ) Schedule Chan e I, RL Webring, being duly sworn, subscribe to and say that I am the Vice President, Operations Support/PIO for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

DATE ( E Z. , 1998 Webring Vice President, Operations Support/PIO On this date personally appeared before me RL Webring, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this ~g day of 1998 Public n and for the STATE OF WASHINGTON Residing at My Commission Expires