GO2-95-139, Informs of Change to Commitment Re Compensatory Posting of Vital Area Access Doors,Per NRC Concern Raised in Insp Rept 50-395/85-33

From kanterella
Jump to navigation Jump to search
Informs of Change to Commitment Re Compensatory Posting of Vital Area Access Doors,Per NRC Concern Raised in Insp Rept 50-395/85-33
ML20086R219
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/25/1995
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-139, NUDOCS 9507310060
Download: ML20086R219 (2)


Text

r ~

1 F- ,  ;

s a 9

e WASIIINGTON PUBl.IC POWER SUPPL.Y SYSTEM P.O. Box 968

  • 3000 George Washington Way e Rkhland, Washirgton 99352-0968 e (509)372-5000 i
. , July 25,1995

~ GO2-95-139 Docket No. 50-397  !

U.S. Nuclear Regulatory Commission Attn: Document Control Desk i Washington, D.C. 20555.  !

Gentlemen: i

Subject:

WNP-2, OPERATING LICENSE NPF-21 i MODIFICATION OF SECURITY COMPENSATORY MEASURES COMMITMENT

Reference:

NRC Inspection 85-33 (Report dated October 29,1985)

The purpose of this letter is to inform you of the change to a commitment pertaining to compensatory posting of vital area access doors. During the reference inspection, the NRC raised a concern pertaining to establishment of compensatory measures for doors for which the ,

automatic closing mechanism could not be adjusted to tolerate variable air pressures and, i therefore, which must be manually closed upon entry and exit by authorized personnel.

In response to the concern, the Supply System implemented a corrective action to require that i a security officer be posted as a compensatory measure if a vital area door, that generates an l alert open condition, is found physically open and a walk-through operability test indicates that the door will not secure without assistance.

The Supply System has evaluated the compensatory posting of vital area doors and determined I that it would be appropriate to continue to require security response to door alarms during times when posting a guard is not otherwise required. However, as an alternate approach, posting of a compensatory officer would not be requiro$ h %ose instances where there is reasonable assurance by physical survey that the alreim w scrated due to a differential air pressure condition. This conclusion is based, in part, on seveal access control enhancements that have i

31 G a t ti ,

9507310060 950725 f- l DR ADOCK 05000397 f PDR g

1

r ~,

Page,2 . - i MODIFICATION OF SECURITY COMPENSATORY MEASURES COMMITMENT been implemented since the time-frame when the commitment was made. These enhancements j include actions such as improvenents to certain vital area doors, implementation of a fitness-for- ;

duty program and increased background investigative requirements for unescorted access as i delineated in Regulatory Guide 5.66. In addition, as part of General Employee Training, personnel are instructed to physically check vital area doors to verify they are completely closed and secured following entry and exit. The current process of posting a guard results m an economic burden with no commensurate improvement in secunty. l This submittal is made for information only. No staff action is requested. Should you have any questions or require additional information regarding this matter, please contact me or D. A.

Swank at (509) 377-4563. t Sincerely, m

J. J. Parrish (Mail Drop 1023) i Vice President, Nuclear Operations  ;

JDA/ml cc: LJ Callan, NRC-RIV '

JW Clifford, NRC-NRR KE Perkins, NRC-RIV, Walnut Creek Field Office NS Reynolds, Winston & Strawn DL Williams, BPA (Mail Drop 399) j NRC Sr. Resident Inspector, Mail Drop 927N i