Text

R.1C) R.IMY' PACCELERATED RIDS PROCESSIN REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9409160175 DOC.DATE: 94/09/02 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Uni't 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Discusses withdrawal of requests for amend to tech specs.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:<"

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA PD4-2 PD CLIFFORD,J INTERNAL: ACRS NRR/DE/EELB, 1 NRR/DRCH/HICB NRR/DRPW 1 NRR/DSSA/SPLB NRR/DSSA/SRXB 1 NUDOCS-ABSTRACT OC/-ErPDeB~ 1 OGC/HDS3 REG FILE 01 1 EXTERNAL: NOAC NRC PDR NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRI!3UTIONLISTS I'OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL

C 0

'fl I

IZ

ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 Geotge Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 September 2, 1994 G02-94-208 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 WITHDRAWALOF REQUESTS FOR AMENDMENTTO TECHNICAL SPECIFICATIONS

References:

.1) Letter G02-90;178,,datedOctober 23, 1990, GC Sorensen (SS) to NRC,

., "Request, for, Amendment to Technical Specification 3.1.3.1, Actions for Inoperable Scram Discharge Volume'.Vent and Drain Lines"

2) Letter G02-91-043, dated March', 1991, GC Sorensen (SS) to NRC, "Request for Amendment to Technical Specification 3.1.3.5, Control Rod Scram Accumulators"
3) Letter G02-92-166, dated July 13, 1992, GC Sorensen (SS) to NRC, "Request for Amendment to Technical Specifications 3/4.6.5.3, Standby Gas Treatment, and 3/4.7.2 Control Room Emergency Filtration Systems"
4) Letter G02-93-029, dated February 10, 1993, GC Sorensen (SS) to NRC, "Request for Amendment to Technical Specification 4.1.3.1.4.a, Reactivity Control Systems, Scram Discharge Volume Valve Testing"
5) Letter G02-92-088, dated April 10, 1992, GC Sorensen (SS) to NRC, "Request for Amendment to Technical Specification 3/4.4.6 Pressure/

Temperature Limits" In conjunction with the NRC Project Manager for WNP-2, the Supply System has determined that several Technical Specification Amendment requests could be more concisely written to support NRC review,and approval.,The Supply System goal is to provide to the staff well documented requests. As such, the amendment, requests contained in References 1 through 5 are withdrawn from further NRC,consideration.,

,,~ ~Bi.0 Z 9<09>so>7s s40e02 PDR ADOCK 05000397 P PDR

li

"~"f,, $ '~ y"'"Sl.'. '~ l;>>i'5:.'i)l>l. '4'.:>L"~yiC~c. 4

'4 <<4 X~~'l ' )) l(jy g)

II, 4 tq

,,r" gr 4

k j4 ~ .

Page Two WITHDRAWALOF REQUESTS FOR AMENDMENTTO TECHNICAL SPECIFICATIONS The Supply System will evaluate the withdrawn submittals for either re-submittal at a later date, or for inclusion in the "Improved Technical Specifications." In particular, References 1 and 4 will be resubmitted as a single submittal that will require NRC review and approval prior to March 17, 1995, in order to avoid a forced plant scram to complete the scram discharge volume drain and vent valve testing in accordance with the current Surveillance Requirement 4.1.3.1.4.

Withdrawal of the referenced requests is part of the Supply System effort to improve overall plant performance. By withdrawing those requests which could require higher than normal staff and Supply System resources to resolve potential questions, these resources can more effectively be devoted to the remaining pending, and future, Supply System submittals.

Should you have any questions or desire additional information regarding this matter, please call me or D.A. Swank at (509) 377-4563.

Sincerely,

.V. Parrish (Mail Drop 1023)

Assistant Managing Director, Operations CC: LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn JW Clifford - NRC DL Williams - BPA/399

., NRC Sr. Resident Inspector - 927N FS Adair - EFSEC