GO2-94-282, Forwards Rev 27 to Nuclear Plant 2 License NPF-21 WNP-2 Physical Security Plan.W/O Encl (Ref 10CFR73.21)

From kanterella
Jump to navigation Jump to search
Forwards Rev 27 to Nuclear Plant 2 License NPF-21 WNP-2 Physical Security Plan.W/O Encl (Ref 10CFR73.21)
ML20078T004
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/19/1994
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-94-282, NUDOCS 9412300014
Download: ML20078T004 (2)


Text

e l

WASillNGTON PUllLIC POWER SUPPLY SYSTEM l'.U. Box 968

  • 3000 George hitshington Mity

LOCKED STORAGE REQUIRED Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-37 Washington, DC 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21 WNP-2 PIlYSICAL SECURITY PLAN, REVISION 27 Enclosed is Revision 27 to the subject document. The enclosure is submitted pursuant to 10CFR 50.54(p) and does not decrease the safeguards effectiveness of the approved plan.

The enclosed contains Safeguards Information concerning security contingency measures for the physical protection of Supply System facilities in which special nuclear material is used. This mformation is to be protected in accordance with 10CFR 73.21.

Should you have any questions or desire additional information regarding this matter, please call me or D. W. Martin at (509) 377-8628.

Sincerely, f

. V. Parrish Assistant Managing Director of Operations (MD 1023)

WASHINGTON PUBLIC POWER SUPPLY SYSTEM  !

MCP:mcp SAFEGUARDS INFORMATION (10CFR73 21)  !

LOCKED STORAGE REQUIRED l

Enclosure:

WNP-2 Physical Security Plan (3 copies) cc: LJ Callan - NRC RIV KE Perkins, Jr. w/o - NRC RIV, Walnut Creek Field 0."fice NS Reynolds w/o - Winston & Strawn

[ Ig JW Clifford w/o - NRC DL Williams w/o - BPA/399 NRC Sr. Resident Inspector w/o - 927N llUS PAGE Ui4CONTHOLLEL) WricN .

SEPARATED FROM ENCLOSURES.

9412300014 941219 PDR ADOCK 05000397 F "

PDR

s -

WASHINGTON PUBLIC POWER SUPPLY SYSTEM SAFEGUARDS INFORMATION (100FR73.21)

LOCKED STORAGE REQUIRED STATE OF WASIIINGTON)

Subject:

WNP-2 Physical Security Plan. Rev. 27

)

COUNTY OF BENTON )

I, J. V. Parrish, being duly sworn, subscribe to and say that I am the Assistant Managing Director of Operations at the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; thot I have the full authority to execute this oath; that I have reviewed the~

foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

This document cordus Safeguards Information and must be protected in accordance with 10 CFR 73.21.

DATE / ,1994

/

A ltl

[V. Parrish, Assistant Managing Director of Operations On this date personally appeared before me, J. V. Parrish, known to me to be the individual who executed the foregoing instrument, and acknowledged that he sign the same as his free act and deed for the uses and purposes herein mentioned.

l GIVEN under my hand and seal this I9 day of TkOfmb1I 1994.

l WASHINGTON PUBLIC POWER SUPPLY SYSTEM  ;

SAFEGUARDS INFORMATION (10CFR73.21)

LOCKED STORAGE REQUIRED i

& AMt $ C (Lwb Notary Public in and for the , I STATE OF WASIIINGTON l Residing at bAlavoR . 00 A I

I My Commission Expires duo.  ?' /W5 l C

l i.. 0 PAGE UNCONTROLLED WHEN SEPARATED FROM ENCLOSURES.

1