Submits Response to GL 94-02,Action 2, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Boiling Water Reactors.
ML17292A639
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/17/1996
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-94-02, GL-94-2, GO2-96-246, NUDOCS 9701030004
Download: ML17292A639 (7)


Text

CATEGORY j.

REGULAT INFORMATION DISTRISUTION+ISTEM (RIDE)

ACCESSjON NBR:9701030004 DOC.DATE: 96/12/17 .'NOTARIZED: YES DOCKET FAC.L:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power; Supply. System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits response to GL 94-02,Action 2, "Long-Term Solutions

& Upgrade of Interim, Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors."

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 'PD4-2 PD 1 1 COLBURN,T 1 1 "INTERNAL: ACRS 1 1 LE CENTER 1 1 NRR/DE/ECGB/A 1 1 NRR D C5 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 I

EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

0 E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK/

ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

br WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richlatut, Washington 99352-0968 December 17, 1996 G02-96-246 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 RESPONSE TO NRC GENERIC LETTER 94-02, ACTION NO. 2

References:

1) NRC Generic Letter 94-02, "Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors," dated July 11, 1994
2) Letter, dated July 12, 1993, A. Thadani (NRC) to L.A. England (BWROG),

"Acceptance for Referencing of Topical Reports NEDO-31960 and NEDO-31960, Supplement 1, "BWR Owners'roup Long-Term Stability Solutions Licensing Methodology"

3) Letter, dated January 12, 1995, JV Parrish (SS) to NRC, "Response to NRC Generic Letter 94-02"
4) Letter, dated August 29, 1994, JV Parrish (SS) to NRC, "Response to NRC Generic Letter 94-02"
5) Letter, dated January 11, 1993, JV Parrish (SS) to NRC, "Response to 0] OooI Notice of Violation and Notice of Deviation - Power Oscillation Event" The NRC requirement for stability long-term corrective actions to ensure compliance with General Design Criteria 10 and 12 of 10 CFR 50 was originally presented in NRC Bulletin 88-07, Supplement 1 (December 30, 1988). The resulting BWR Owners'roup (BWROG) efforts in this area led to the solution concepts and supporting methodology described in NEDO-31960, "BWR Owners'roup Long-Term Stability Solutions Licensing Methodology" and NEDO-31960, Supplement 1. NRC acceptance of the BWROG-developed solution concepts and supporting methodology was indicated in Reference 2. Based on the NRC acceptance of these concepts and methodology, the Supply System elected in reference 3 to 970f030004 qhf2f7 PDR ADOCK 05000397 QD~II '~

P PDR

l I

Page 2 RESPONSE TO NRC GENERIC LETTER 94-02, ACTION NO. 2 proceed with the Enhanced Option 1-A concept described in NEDO- 32339 for the stability long-term solution. This option introduces new plant hardware and software to provide early detection of oscillations and to initiate an appropriate mitigating action. Reference 3 also provided a preliminary implementation schedule which was dependent upon GE hardware/software design development, delivery of the final product, and Supply System processing and implementation of the necessary plant design change packages.

Delays with GE hardware delivery, the availability of GE supporting design documents, and the need to assure a quality design change document have resulted in the Supply System being unable to complete the necessary design effort for the Enhanced Option 1-A stability solution to meet our outage milestone. As a result of the need to ensure the development of a quality design change document and the identified delays, it has become necessary to extend, by one year, the originally proposed schedule for installation of the Enhanced Option 1-A solution.

The following revised schedule is based on the best delivery dates for the Period Based Detection System (PBDS) and Flow Control Trip Reference (FCTR) cards and allows for sufficient time to ensure the development of a quality design document, ensuring a quality installation and implementation of the stability long-term solution. The revised schedule also includes the necessary time needed to accumulate operational experience before the long-term stability modification is fully implemented.

Original Projected schedule Schedule

~ Design change packages completed June 30, 1996 June 30, 1997

~ Installation of one PBDS and FCTR card June 30, 1997 June 30, 1998

~ Installation of remaining PBDS and FCTR June 30, 1998 June 30, 1999 cards

~ Technical Specification Change submitted March 31, 1997 December 31, 1997

~ Full implementation (trip function armed) June 30, 1998 June 30, 1999 In response to previous core stability concerns and to assure safe plant operation, the Supply System strengthened the administrative controls intended to avoid power oscillations and to detect and suppress them if they occurred. The Supply System implemented power distribution controls, the use of a stability monitor, revised appropriate operating procedures, and performed operator training regarding core stability issues. These additional controls will be continued until the long-term core stability solution is fully implemented. As a result, the continued operation of the facility for an additional year under the present administrative controls ensures adequate protection of the public health and safety. Additional discussion of the WNP-2 interim compensatory actions is provided in references 4 and 5.

Page 3 RESPONSE TO NRC GENERIC LETTER 94-02, ACTION NO. 2 Should you have any questions or desire additional information regarding this matter, please call me or Ms L.C. Fernandez at (509) 377-4147.

Respectfull J . Parrish

'ef Executive Ofncer (Mail Drop 1023) cc: LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N TG Colburn - NRC NS Reynolds - Winston 8'c Strawn DL Williams - BPA/399

STATE OF WASHINGTON )

Subject:

NRC Generic Letter 94-02

) Action No. 2 COUNTY OF BENTON )

I, J. V. PARMSH, being duly sworn, subscribe to and say that I am the Chief Executive Officer for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

DATE , 1996

. Parrish ief Executive Officer On this date personally appeared before me J. V. PARMSH, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this ~lday +h of 1996.