See Category:Ultimate Heat Sink
Topic |
|---|
|
|
| 10 CFR | |
|---|
| All by date | | | Start date | Site | Title |
|---|
| Inspection Manual Change Notice 26-007, TOC for Inspection Manual Change Notice 26-007 | 20 February 2026 | | TOC for Inspection Manual Change Notice 26-007 | | ML26043A120 | 17 February 2026 | Vogtle | Notification of Vogtle Electric Generating Plant, Units 3 & 4 Comprehensive Engineering Team Inspection - U.S Nuclear Regulatory Commission Inspection Report 05200025/2026011 and 05200026/2026011 | | NL-26-0047, Units 3 and 4, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 12 February 2026 | Vogtle | Units 3 and 4, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | | IR 05000254/2025004 | 11 February 2026 | Quad Cities | Integrated Inspection Report 05000254/2025004 and 05000265/2025004 | | ML26030A150 | 5 February 2026 | Vogtle | January 27, 2026, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Proposed Extended Power Uprate | | Inspection Manual Change Notice 26-004, TOC for Inspection Manual Change Notice 26-004 | 5 February 2026 | | TOC for Inspection Manual Change Notice 26-004 | | ML26027A103 | 3 February 2026 | River Bend | Issuance of Amendment No. 220 Revision to the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink | | IR 05000395/2025004 | 3 February 2026 | Summer | Integrated Inspection Report 05000395/2025004 and Apparent Violation | | IR 05000382/2025002 | 2 February 2026 | Waterford | Amended Integrated Inspection Report 05000382/2025002 | | Inspection Manual Change Notice 26-003, TOC for Inspection Manual Change Notice 26-003 | 29 January 2026 | | TOC for Inspection Manual Change Notice 26-003 |
|
|---|