ML17292B139

From kanterella
Jump to navigation Jump to search
Forwards Rev 27 to Operational QA Program Description (OQAPD) (WPPSS-QA-004), to Reflect Organizational Change of Relocating Supplier Quality & Receiving Insp Functions from Procurement Dept to Quality Dept
ML17292B139
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/04/1997
From: Coleman D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17292B140 List:
References
GO2-97-217, NUDOCS 9712220022
Download: ML17292B139 (5)


Text

CATEGORY "REGULA Y INFORMATION DISTRIBUTI w SYSTEM (RIDS)

DOC.DATE: 97/12/04 NOTARIZED: NO'OCKET

'C ACCESSION NBR:9712220022 FACIL:50-397'PPSS Nuclear P~roject, Unit 2, Washington Public Powe 05000397 AUTH ~ VflQCE AUTHOR AFFILIATION f COL'EMAN,D.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards

~

rev 27 to "Operational QA Program Description (OQAPD) (WPPSS-QA-004," to reflect organizational change of C relocating supplier quality 8 receiving insp functions from Procurement Dept to Quality Dept. A DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR I ENCL ( SIZE:

TITLE: QA Topical Report, Change, Amendment, or Correspondence (Docket/Utili T

~ .

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 POSLUSNY,C 1 1 INTERNAL: AC 1 1 DRS/RGN.. 1 1 FILE CENTER 0 1 1 NRR/DISP/PIMB 1 1 RC~Q 1 1 NUDOCS-ABSTRACT 1 1 OC/LFDCB 1 1 RGN4 FILE 1 1 DMB/OSS 'XTERNAL:

1 1 IHS NRC PDR 1 1 D

U E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12

p WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 December 4, 1997 G02-97-217 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21, REVISION 27 TO OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)

In accordance with 10 CFR 50.54(a)(3), the Supply System is revising the U.S. Nuclear Regulatory Commission (NRC) approved topical report "Operational Quality Assurance Program Description (OQAPD) (WPPSS-QA-004)."

Revision 27 to the OQAPD was necessary to reflect an organizational change of relocating the Supplier Quality and Receiving Inspection functions from the Procurement Department to the Quality Department. The changes in Revision 27 are identified in the OQAPD, Section 1, Organization; Section 7, Control of Purchased Material, Equipment, and Services; Section 18, Audits, and Appendix I, Qualification Requirements.

A description and justification for the revisions to the OQAPD are provided in Attachment 1.

Vertical lines have been placed in the right-hand margin of Attachment 2 to identify text changes, additions and deletions.

The changes have been evaluated by the Supply System in accordance with 10 CFR 50.54(a)(3) and they are not considered a reduction in commitments.

97i2220022 97i2040 0S000SSr I Da aoaCX P PORE IIIIIII IIIIIIIIIIIIII,IIIII,IIIIIIIIIIIII,'

REVISION 27 TO OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)

Page 2 Should you have any questions or desire additional information regarding this matter, please call me or DK Atkinson at (509) 377-4302.

Respectfully, DW Coleman Acting Manager, Regulatory Affairs Mail Drop PE20 Attachments

1. Description and Justification
2. List of Effective Pages, Table of Contents, Sections 1, 7, 18, and Appendix I CC: EW Merschoff - NRC RIV KE Perkins Jr. - NRC RIV, Walnut Creek Field Office TG Colburn - NRR C Poslusny, Jr, - NRR NRC Sr. Resident Inspector - 927N DL Williams - BPA/399 PD Robinson - Winston & Strawn

REVISION 27 TO OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPTION Page1of1 Section 1.3.3.1 is being changed, Descri ti n and Ju ification, to move the responsibility for, "Providing the review and concurrence of selected programs, procedures, and/or instructions affecting safety..." to the Manager, Quality from the Supervisor, Quality Services. The review and concurrence of programs, procedures, and/or instructions affecting safety are delegated to various members of the quality staff and the responsibility for the review does not reside with one supervisor.

Section 1.3.3.1.3 Lead, Supplier Quality was added. The responsibilities for the position were listed in Revision 26 under the Procurement Manager. Moving the function of Supplier Quality and Quality Receiving Inspection is considered an improvement in our organization and process. These functions were located within the Quality Department prior to Revision 23 of the OQAPD. Revision 23 dated January 12, 1996, relocated these functions to the Procurement Department.

Section 7.2.2.b and 7.2.4 are being changed to reflect the responsibility for Supplier Quality.

Section 18.2.1 is being changed to reflect the responsibility for external audits of Supply System vendors to be performed by the Quality Department.

Appendix I, is being changed to add the qualification requirements for the Lead, Supplier Quality.

These changes have been evaluated by the Supply System and they are not considered a reduction in commitments.