IR 05000412/1987034

From kanterella
Jump to navigation Jump to search
Forwards Parameter,Inc Insp Rept 50-412/87-34 Re Comparison of Facility Tech Specs W/Facility.Numerous Minor Inconsistencies & Errors Noted.Response Detailing Resolution of Discrepancies in Rept Requested within 30 Days
ML20215D837
Person / Time
Site: Beaver Valley
Issue date: 06/11/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20215D841 List:
References
NUDOCS 8706190161
Download: ML20215D837 (2)


Text

g . .

-

g JUN 111987 l

' Docket No. 50-412 Duquesne-Light Company j ATTN: 'Mr. J. J. Carey -)

Senior Vice President'

Nuclear Group Post Office Box 4 Shippingport, Pennsylvania 15077 I

Gentlemen:

Subject: Inspection Report No. 50-412/87-34 This forwards the enclosed NRC. contractor report of a comparison of draft Beaver Valley Power Station Unit 2 Technical Specification provisions and the Unit 2-f acili ty.- The preliminary results of the comparison were discussed with Mr. Swiderski and other members of your staff on April 10, 198 Numerous. inconsistencies and errors of.a minor nature were noted in comparing the Technical Specifications, the FSAR and licensee procedures, drawings'and, and as-built' field conditions. The source of most of the discrepancies appears to be due l to the_ ongoing nature and status of your. efforts which required the use of an early draft of the Technical Specifications and incomplete test information. In addition, we recognize'that your procedures were still under development'and required final-ized plant data.in several cases for completion. Nonetheless, to assure that th discrepancies noted in this report have been addressed, we request that you provide a written response within 30 days describing how the findings-in the following detail sections of the enclosed report have been resolved: Sections 2.1.a, b, c,

.and e; 2.3; 2.4.a and b; and Your. cooperation with us and our contractor is appreciate

Sincerely, postad #1gnedBgs Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects Enclosure: NRC Region I Inspection Report 50-412/87-34 8706190161 PDR ADocK B7 h k2 PDR O

I\

'

g -v/

p --

. , . .

. , e. , ,

...

,

Duquesne Light' Compan ~2

<

,

cc w/ enc 1:

J. D.'Sieber, Vice' President, Nuclear J. Crockett, Senior Manager, Nuclear Operations E. Ewing, Quality Assurance Manager-

, J..Swiderski', Manager, Startup Group J. P. Thomas, Manager, Engineering ,

R. E. Martin, Manager, Regulatory Affair C. O. Richardson, Stone and Webster Engineering Corporation Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center'(NSIC)

'NRC Resident Inspector Commonwealth of Pennsylvania bec w/ enc 1: i

' Region I Docket Room (with concurrences) '

-Management Assistant, DRMA'(w/o encl)

DRP Section Chief .'

W.1 Troskoski, SRI, BV-1 P. Tam, LPM, NRR

.

T. Martin, DRSS S. Ebneter, DRS '

A. Lodewyk, DRS Robert J. Bores,~DRSS ,

!

R :BRP RP . P k imroth/meo {r[pp enzinger

'

s/22/87 g glg7 gggy '

OFFICIAL RECORD COPY l

l i