IR 05000412/1987008

From kanterella
Jump to navigation Jump to search
Meeting Insp Rept 50-412/87-08 on 870105.Major Areas Discussed:Status of Operator cross-training Program & Dual Licensing of Selected Senior Operators
ML20210D717
Person / Time
Site: Beaver Valley
Issue date: 02/03/1987
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20210D694 List:
References
50-412-87-08-MM, 50-412-87-8-MM, NUDOCS 8702100151
Download: ML20210D717 (3)


Text

._.

[

.'

U.S. NUCLEAR REGULATORY COMISSION

REGION I

MEETING SUMMARY Docket No.

50-412 Meeting No.

87-08 License No.

CPPR-105 Licensee:

Duquesne Light Company Nuclear Construction Division P. O. Box 328 Shippingport, Pennsylvania 15077 Facility Name: Beaver Valley Powe_r Station, Unit 2 1.

Introduction A meeting was held at the Region 1 office on January 5, 1987 at 10:30 a.m.

at the request of the NRC. The purpose of the meeting was to discuss the status of.the operator cross-training program and the issue of dual licens-ing selected senior operators at Beaver Valley Unit 2.

The following people attended the meeting.

NRC Attendees Samuel J. Collins, Deputy Director Division of Reactor Projects Robert M. Keller, Chief, Projects Section 1C Lowell E. Tripp, Chief, Projects Section 3A Peter S. Tam, Project Manager Joseph J. Buzy, Licensing Qualification Branch Noel F. Dudley, Lead Reactor Engineer (Examiner)

G. Scott Barber, Reactor Engineer (Examiner)

David M. Silk, Reactor Engineer (Examiner)

Duquesne Light Company Attendees Jack Sieber, Vice President, Nuclear Thomas Burns, Director, Operator Training Roger Martin, Manager Regulatory Affairs Al Morabito, Manager Nuclear Training 2.

Status of Cold License Training Program The NRC and Duquesne Light Company (DLC) discussed the candidates who would be applying for operator licensing examinations in January and May 1987, and the proposed cross-training program.

DLC presented the backgrounds of the licensing candidates. The twenty candidates for the January 1987 examination are all experienced licensed operators on Unit I with the exception of one individual who was licensed on Unit 1 kg2]Oh

O

.-

-

_-.

-

.

--

'

/

.

in March 1986. The experience of the group of twenty candidates for the May 1987 examination is more varied. Nine candidates are experienced licensed operators on Unit 1.

Six candidates are not licensed on Unit 1.

Five candidates, who were recently licensed as reactor operators on Unit 1, will be sitting for the Senior Reactor Operator (SRO) examination for Unit 2.

The licensing candidates who failed Unit I licensing exami-

'

nations in 1986 were provided additional simulator training and performed

,

reactor startups at the Rensselaer Polytechnic Institute reactor. Three candidates who failed the SR0 examination for Unit I will be applying for the RO examination for Unit 2.

The NRC found the experience of these individuals, as present'ed, to be acceptable.

'

,

DLC explained that the cross-training program, submitted by letter dated September 30, 1986, differed from the program submitted by letter dated

'

October 30, 1985 in respect to the personnel to be trained. The most recent program expanded the scope of personnel to be trained to include

,

individuals who had completed training for Unit 1 as well as individuals i

licensed on Unit 1.

As discussed below, since there will be no dual

licenses issued prior to fuel loading, the requirement to hold a license i

on Unit I has been negated.

The NRC encouraged the licensee not to become complacent about the upcoming licensing examinations in light of the results of examinations given to

other recent near term operating license (NTOL) facilities. DLC stated that their candidates were well motivated and were expending substantial effort on their preparations.

'

The NRC encouraged the licensee to review the operating experience of shift personnel and requested an update of Section 13.1, Organizational Structure of Applicant, of the Final Safety Analysis Report (FSAR). DLC and the NRC will continue to work together to determine what information needs to be provided in the FSAR, Chapter 13.1, update.

DLC explained the status of INP0 accreditation of training programs at Seaver Valley Unit 2.

The Beaver Valley site is accredited by INPO.

A job analysis for Unit 2 will be completed in the next few weeks.

A complete job task analysis for the differences identified by the job analysis will then be conducted.

Following the job task analysis, lesson plans will be reviewed to ensure compliance with the knowledges and

'

abilities identified by the job task analysis. The resulting training

,

program will be reviewed by INPO as part of either a two year review or

,

a four year re-evaluation of the job analysis.

DLC committed to provide all Unit I requalification classroom training,

.

i missed during training for Unit 2, to any operator who fails the Unit 2 i

licensing examination prior to returning him to Itcensed duty at Unit 1.

.

f The NE and DLC agreed that the Beaver Valley simulator is not at present a plant reference simulator for Unit 2, but that the simulator is a useful training tool. DLC stated that steps have been taken to improve the simulator's training value by developing a separate core model for Unit 2 i

I

,

- -... -. -. -.

.,,...c.,,

_, _, _,,,. ~.,,,, _, _ _.,.,,....

.,, - -.. -.., - -,, _ _. - -,,,, -. - - -

--.

.'

o

and by constructing a 50% photo-mosaic of the Unit 2 control board for discussion of control board differences.

3.

Dual Licensing of Operators DLC presented a proposed organizational chart for the Nuclear Operations Unit. The revision would provide a completely separate shift organization for Unit I and for Unit 2.

The reorganization would allow DLC to complete the facility licensing process without the concern for dual licensing of operators.

The reorganization also allows the licensee time to evaluate the desirability of dual licensing selected individuals in the future.

4.

Commitments DLC and the NRC Project Manager will work together to identify what items need to be updated in Chapter 13.1 of the FSAR.

Items to be updated should include the amount of operating experience on shift, and the pro-posed organizational structure of the Nuclear Operations Unit.

DLC will review the experience of other NTOL facilities on their initial licensing examinations.

DLC will provide a letter to the NRC Project Manager which incorporates by reference all correspondence relevant to the Unit 2 docket.

.,

I I

!

!

!

.

.--

.--

--

.,

,,,,

.,,,,, -. - - -,.

.. - - - -,,. -. -,. -.., - - -. -.

,, _.. ~., -. -.. -,. -, - - - - - - -

-n

- - - -- - -a

,