,,o J July 17,1989
'l Docket No. 50-412 L
Mr. J. D. Sieber,. Vice President Duquesne Light Company Nuclear Group Post Office Box 4 1 -
Shippingport, Pennsylvania 15077
Dear Mr. Sieber:
l
SUBJECT:
BEAVER VALLEY UNIT 2 - STAFF POSITION ON SLCRS CHARC0AL l
FILTER TESTING (TAC 69220)
By letter dated August 11, 1988, you requested, among other' things, that Section 4.7.8.1.b of the Technical Specifications be amended.- Specifically, y(ou req)uested to relax the Supplemental Leak Collection and Release System SLCRS charcoal filter test requirement such that a bypass leakage test need not be performed after an incident of painting, fire or chemical release.
It is our position that chemicals released as a result of various incidents could'potentially clog up HEPA filters, thus leading to high. pressure differentials across the filters and possible rupture. New penetration
-(bypass) paths could be created.
For. this reason, we take the position that a bypass leakage test be required after'these incidents. The current Beaver Valley Unit 2 and Westinghouse Standard Technical Specifications (WSTS) both express this position.
We evaluated the Beaver Valley Unit 2 SLCRS design and determined that there is no basic difference from other plants'; thus we cannot justify a plant-specific deviation from the WSTS. An amendment as you requested would necessarily be preceded by an appropriate change to the WSTS, in accordance with current NRR policy (Office Letter No. 803, dated July 14,1988)..Since the safety benefits of such a change appear non-existent, and reduction of man-rem exposure appears minimal, the action would be given a low priority.
Please evaluate your requested amendment and determine appropriate actions.
Meanwhile, the balance of your request not discussed in this letter is being processed separately.
Sincerely,
. Sin ed bf Peter S. Tahi, Senigr Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION
. Docket:F11ef NRC & Local PDRs Plant file SVarga BBoger SNorris PTam 0GC EJordan
- BGrimes, ACRS(10)
[ DOCKET NO. 50-412]
LA:PDI N PM:PDI-PD:
-4 SNdrhs PTam:cb I
JSto s
3 7/r//89
- 7////89 8907200421 890717
~
7/p89 i
PDR ADOCK 05000412 P
.o
' ~ Mr. J. Sieber Beaver Valley Power Station Duquesne Light Company Units 1 8 2 CC:
Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts and Trowbridge Pennsylvania Department of 2300 N Street, N.W.
Environmental Resources Washington, DC 20037 ATTN:
R. Janati Post Office Box 2063 Kenny Grada, Manager Harrisburg, Pennsylvania 17120 Nuclear Safety Duquesne Light Company Mayor of the Borrough of P. O. Box 4 Shippingport Shippingport, Pennsylvania 15077 Post Office Box 3 Shippingport, Pennsylvania 15077 John A. Lee, Esquire Ashley C. Schannauer Duquesne Light Company Assistant City Solicitor One Oxford Centre City of Pittsburgh 301 Grant Street 313 City-County Building Pittsburgh, Pennsylvania 15279 Pittsburgh, Pennsylvania 15219 W.F. Carmichael, Commissioner Regional Administrator, Region I Department of Labor U.S. Nuclear Regulatory Commission 1800 Washington Street East 475 Allendale Road Charleston, West Virginia 25305 King of Prussia, Pennsylvania 19406 John D. Borrows Resident Inspector Director, Utilities Depdrtment
- U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 181 180 East Broad Street Shippingport, Pennsylvania 15077 Columbus, Ohio 43266-0573
)
4 Director, Pennsylvania Emergency Management Agency Post Office Box 3321 Harrisburg, Pennsylvania 17105-3321 I
l J