Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20062F247 | 16 November 1990 | Summarizes Staff Understanding of Current Status Re GSIs Remaining Unimplemented at Facility Based on Util 900627 Response to Generic Ltr 90-04 & 901025 Meeting | |
ML20058D532 | 30 October 1990 | Forwards Addl Info Re Proposed Change Request 1A-176 Relating to Overpressure Protection Sys | |
ML20058B665 | 19 October 1990 | Grants 901018 Request for Temporary Waiver of Compliance from Tech Spec 3.6.2.2 Re Reduced Flow Through Spray HXs | |
ML20062B662 | 12 October 1990 | Extends Invitation to Attend 910220-21 Util Symposium/ Workshop in King of Prussia,Pa Re Engineering Role in Plant Support | |
ML20062A696 | 11 October 1990 | Responds to Util 900907 Request for Authorization to Use Alloy 690 for Steam Generator Tube Plugs.Use of Alloy 690 Acceptable | |
ML20059N465 | 1 October 1990 | Forwards Insp Repts 50-334/90-19 & 50-412/90-19 on 900917- 21.One Noncited Violation Noted | |
ML20059L634 | 20 September 1990 | Advises That No short-term Safety Concerns Noted Per 890530 Response to NRC Bulletin 88-011 Re Thermal Stratification | Finite Element Analysis Earthquake |
ML20059E753 | 24 August 1990 | Forwards Requalification Program Evaluation Rept 50-334/90-14OL-RQ on 900709-19.Util Requalification Program Assigned Overall Rating of Satisfactory | |
ML20058P392 | 10 August 1990 | Forwards Requalification Program Evaluation Rept 50-412/90-11(OL-RQ) Administered on 900529-0607.Program Assigned Overall Rating of Satisfactory | License Renewal |
ML20058N071 | 6 August 1990 | Discusses Licensee Engineering Initiatives.Encourages Initiation of Initiative Similar to Region V Establishment of Engineering Managers Forum | |
ML20056A351 | 24 July 1990 | Forwards Safety Insp Repts 50-334/90-12 & 50-412/90-12 on 900505-0622 & Notice of Deviation | |
ML20055G807 | 16 July 1990 | Forwards Insp Repts 50-334/90-15 & 50-412/90-15 on 900611-15.No Violations Noted | |
ML20055G425 | 11 July 1990 | Forwards Radiological Controls Insp Repts 50-334/90-16 & 50-412/90-16 on 900604-08.No Violations Noted.Weaknesses Noted.Review of Weaknesses Requested & Results of Review Should Be Submitted to NRC by 900901 | |
IR 05000334/1989024 | 2 July 1990 | Advises That Requesting Withdrawal of Violation Noted in Insp Rept 50-334/89-24 Inconclusive.Util Actual Measurements Demonstrate Wide Variation on Specified Angle Indicating Inaccuracies in Physical Measurement Technique | |
ML20058K451 | 29 June 1990 | Advises That NRC Has No Objection to Util Corrective Actions & Schedule for Unqualified Fire Damper Engineering Evaluations.Complete Review of Util Engineering Evaluations Will Be Issued Later | |
ML20059M929 | 13 June 1990 | Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl | |
ML20248G003 | 29 September 1989 | Forwards Safety Insp Repts 50-334/89-13 & 50-412/89-14 on 890708-0831 & Notice of Violation | |
ML20248D745 | 29 September 1989 | Forwards Supplemental Safety Evaluation Supporting Util 890707 Response to Open Items Re Plant Safety Monitoring Sys Verification & Validation | |
ML20248G154 | 25 September 1989 | Forwards Safety Insp Rept 50-334/89-15 on 890905-08.No Violations Noted | |
ML20247R478 | 20 September 1989 | Forwards Amend 12 to Indemnity Agreement B-73,reflecting Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements | |
ML20247K177 | 15 September 1989 | Advises That Licensee 890616 Response to NRC Bulletin 89-001 Consistent W/Actions Requested by Items 2,3 & 4 | |
ML20247K305 | 12 September 1989 | Forwards Insp Repts 50-334/89-14 & 50-412/89-15 on 890801- 03.No Violations Noted | |
ML20247K646 | 11 September 1989 | Forwards Vol 1 to NRC Maint Insp Guidance, Per 890907 Discussion.Guidance Contains Insp Element Trees | |
ML20246K569 | 24 August 1989 | Forwards Insp Repts 50-334/89-17 & 50-412/89-17 on 890731-0810.No Violations Noted | |
ML20246E955 | 22 August 1989 | Forwards Exam Rept 50-334/89-16OL Administered on 890727- 28 | |
ML20246H862 | 18 August 1989 | Clarifies NRC Position Re Definition of Extremity for Purposes of Setting Occupational Exposure Limits.Request That Util Ensure Procedures Incorporate Applicable Dose Limits of 10CFR20 | |
ML20246A966 | 11 August 1989 | Forwards Safety Insp Repts 50-334/89-12 & 50-412/89-13 on 890523-0707 & Notice of Violation | |
ML20245F181 | 7 August 1989 | Confirms Plan to Conduct Site Audit to Evaluate NDE Performed in Response to Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Audit to Be Performed by R Hermann & M Hum | Nondestructive Examination |
ML20245F641 | 4 August 1989 | Requests Util Provide Encl List of Ref Matls for Maint Program Insp Scheduled for 890918-29.NRC Draft Temporary Instruction 2515/97, Maint Instruction, Also Encl for Info & to Aid in Preparing Insp | Probabilistic Risk Assessment |
ML20247L832 | 21 July 1989 | Forwards Insp Repts 50-334/89-08 & 50-412/89-08 on 890501-05.No Violations Noted | |
ML20246Q072 | 17 July 1989 | Discusses NRC Position on Util 880811 Request for Amend to Tech Spec Section 4.7.8.1.b to Relax Supplemental Leak Collection & Release Sys Charcoal Filter Test Requirements. Deviation from Westinghouse STS Not Justified | |
ML20246N224 | 13 July 1989 | Forwards Safety Insp Repts 50-334/89-11 & 50-412/89-12 on 890531-0602.No Violations Noted | |
ML20246G217 | 6 July 1989 | Forwards Safety Insp Repts 50-334/89-10 & 50-412/89-11 on 890515-19.No Violations Noted | |
ML20245K350 | 28 June 1989 | Confirms NRC Plan to Conduct Site Audit on 890803-04,as Part of Efforts to Complete Review of Util Submittals on Thermal Stratification of Pressurizer Surge Line.Encl 1 Provides Outline of Audit Activities for NRC Bulletin 88-010 Issues | |
ML20245G636 | 20 June 1989 | Forwards Safety Insp Rept 50-412/89-10 on 890515-19.No Violations Noted | |
ML20245A929 | 9 June 1989 | Fowards Security Insp Repts 50-334/89-09 & 50-412/89-09 on 890508-11.No Violations Noted | |
ML20244C466 | 7 June 1989 | Confirms Plans to Conduct Site Tour on 890614 as Part of Efforts to Better Understand Phenomenon of Hydrogen Gas Accumulation in Charging Pump Suction Piping.Phenomena Also Subj of NRC Info Notice 88-023,Suppl 1 | |
ML20244B590 | 6 June 1989 | Forwards Safety Insp Repts 50-334/89-05 & 50-412/89-05 on 890401-0522.No Violations Noted | |
ML20247N345 | 30 May 1989 | Forwards SER Supporting Util Actions in Response to Generic Ltr 83-28,Item 4.5.3, Reactor Trip Sys Functional Testing | |
ML20247K943 | 23 May 1989 | Forwards Safety Insp Repts 50-334/89-07 & 50-412/89-07 on 890417-21.No Violations Noted | |
ML20247H619 | 23 May 1989 | Concludes That Proposed Use of Type 420 Stainless Steel Plug in Regulating Valve Acceptable for One Fuel Cycle (Cycle 2) or Until ASME Code Committee Transmits Written Approval | Weld Overlay |
ML20247D348 | 19 May 1989 | Final Response to FOIA Request.Regulatory Info Tracking Sys Project Managers Rept Encl | |
ML20247D418 | 15 May 1989 | Forwards Radiological Controls Insp Repts 50-334/89-06 & 50-412/89-06 on 890410-14.No Violations Noted.Lack of Awareness Re Requirements of 10CFR50.70(b)(4) Identified | |
IR 05000334/1988002 | 12 May 1989 | Ack Receipt of Changing Schedule for Completion of Corrective Actions Re Insp 50-334/88-02.Actions Will Be Examined During Next Insp of Unit 2 Emergency Operating Procedures,Scheduled for Sept 1989 | |
ML20246M049 | 10 May 1989 | Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification, That Was Mutually Agreed Upon Between NRC & Westinghouse at 890411 Meeting.Util Schedule Not Approved | |
ML20246M165 | 10 May 1989 | Forwards Safety Evaluation Re Plant Safety Monitoring Sys Verification & Validation Plan Submitted by . Hardware Design of Subj Sys Acceptable.Verification & Validation Plan Incomplete & Unacceptable.Info Requested | |
ML20245K648 | 3 May 1989 | Forwards Revised Tech Spec Bases Section 3/4.7.9,adding New Paragraph to Define Sealed Sources | High Radiation Area |
ML20246P785 | 3 May 1989 | Extends Invitation to Attend Power Reactor Operator Licensing Seminar Planned by Region I on 890531 in King of Prussia,Pa.Seminar Agenda & Map of Local Area Encl | |
ML20245H429 | 28 April 1989 | Confirms Plan to Conduct Site Insp as Part of Efforts to Resolve Issue of Differential Settlement of Buried Pipes. Areas to Be Inspected Includes Ongoing Settlement Monitoring & Review of Settlement Data | |
ML20245H773 | 26 April 1989 | Forwards Comments on Util 890113 Response to Generic Ltr 88-17 Re Loss of Dhr.Though Response Appears to Meet Recommended Expeditious Actions,Overall Response Brief & Therefore Fails to Address All Items in Detail | Loop seal |