Forwards Insp Repts 50-334/99-04 & 50-412/99-04 on 990613- 990724.One Violation Noted & Treated as Non-Cited Violation Involved Failure to Maintain Containment Equipment Hatch Closed During Fuel Movement
ML20211A511
Person / Time
Site: Beaver Valley  FirstEnergy icon.png
Issue date: 08/18/1999
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cross J
DUQUESNE LIGHT CO.
Shared Package
ML20211A516 List:
References
50-334-99-04, 50-412-99-04, NUDOCS 9908240064
Download: ML20211A511 (3)


See also: IR 05000334/1999004

Text

August 18,1999

Mr. J. E. Cross

Generation Group -

Duquesne Light Company

Post Office Box 4

Shippingport, Pennsylvania 15077

SUBJECT: NRC INTEGRATED INSPECTION REPORT NOS. 50-334/99-04

Dear Mr. Cross:

This refers to the inspection conducted from June 13 to July 24,1999, at the Beaver Valley

Power Station facility. The enclosed report represents the results of this inspection.

During the 6-week inspection period, your conduct of activities at the Beaver Valley Power

Station facility was generally characterized by safe operation and response to transients. Unit 2

operators took prompt action to isolate an electrical fault and stabilize the plant following a loss

of the 2DF emergency 4 kilovolt electrical bus. The unit was safely shut down as required by

technical specifications to resolve an inoperable emergency diesel generator. Industry

operating experience evaluations were typically thorough and industry issue backlogs were

reduced by 30%. Engineers properly evaluated several emergent material problems to support

Unit 2 restart.

Notwithstanding, our inspectors identified soveral problems which challenged your ability to

complete safety related maintenance activities in a timely manner. Manpower constraints,

ineffective communications, untimely work package planning, and poor prejob walkdowns

delayed several Unit 1 maintenance activities thereby increasing overall plant risk. The poor

schedule implementation represented a weakness. Additionally, two problems associated with

the forced Unit 2 shutdown were not fully evaluated and addressed at Unit i until questioned by

our inspectors. ' I understand that you are addressing these issues through your corrective

action program.

,

Based on the results of this inspection, the NRC has determined that one violation of NRC

requirements occurred, which you identified. This violation is being treated as a Non-Cited

Violation (NCV), consistent with _Apnendix C of the Enforcement Policy. This NCV involved a

failure to maintain the containment equipment hatch closed during fuel movement. The NCV is

described in the subject inspection report. If you contest the violation or severity level of the

NCV, you'should provide a response within 30 days of the date of this inspection report, with the

. basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

, Washington DC 20555-0001, with a copies to the Regional Administrator, Region I, and the

. Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

' DC 20555-0001.

j

\

\

9908240064 990818

PDR ADOCK 05000334

h' 0

G PDR \y

.

..

~ Mr. J. E. Cross 2

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

I

Original Signed By: l

l

Peter W. Eselgroth, Chief '

Reactor Projects Branch 7

Division of Reactor Projects I

I

Docket Nos.: 50-334, 50-412'  !

License Nos: DRP-66, NPF-73

Enclosure: Inspection Report Nos. 509-334/99-04,50-412/99-04

l

cc w/ encl:  ;

S. Jain, Senior Vice President, Nuclear Services Group '

L. Myers, Executive Vice Pr,esident, Generation Group

K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager

B. Tuite, General Manager, Nuclear Operations Unit

W. Kline, Manager, Nuclear Engineering Department

M. Pearson, Manager, Quality Services Unit

M. Ackerman, Manager, Safety & Licensing Department

J. Macdonald, Manager, System and Performance Engineering

. J. A. Huitz, Manager, Projects and Support Services, FirstEnergy

M. Clancy, Mayor, Shippingport, PA

Commonwealth of Pennsylvania

State of Ohio

State of West Virginia

i

I

!

!

,

F', c 1

.

.:

3

Distnbution w/ encl:

Region i Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)--

~ PUBLIC

NRC Resident inspector

H. Miller, RA/J. Wiggins, DRA

P. Eselgroth, DRP -

- N. Perry, DRP

C. O'Daniell, DRP  ;

!

Distribution w/enci(VIA E-MAIL):

M. Tschiltz, OEDO

E. Adensam, PD1, NRR

- S. Bajwa, PDI-1,- NRR -

D. Collins, PM, PDl-1, NRR l

"

V. Nerses, PDl-1 NRR

i

R. Correia, NRR

DOCDESK

Inspection Program Branch, NRR (IPAS)

1

!

!

l

l

.-

l

!

I

DOCUMENT NAME: G:\ BRANCH 7\ Beaver Valley \ir9904.bv.wpd

To rooseve e copy of this document,indeste in the box: 'C" = Copy without enschmenuenciosure "lE" = Copy with eGechmenWendoeure '90 =

Dio copy -

OFFICE - RipfjP l Rl/DJP,f l6- l / l

NAME MWs EN

DATE '8/12/99 ' jr//f/ff

OFFICIAL RECORD COPY