g.
_
,-
. _ - -
_
_ _ _ _ _ _
hl
.; # a-
,
-
is
'
AUG 111989
,
Docket / License: 50-334/DPR-66
50-412/NPF-73
=Duquesne Light-Company
l
ATTN:
Mr.'J. D. Siebe'r
Vice President, Nuclear. Group-
Post Office' Box 4
Shippingport, Pennsylvania 15077.
1
Gentlemen:
Subject: Combined Inspection Report Nos. 50-334/89-12 and 50-412/89-13
- This refers to the routine resident safety. inspection by Messrs. J. Beall and
P.' Wilson at the Beaver Valley Power Station in Shippingport, Pennsylvania.
The reporting period covers the time from May 23 - July 7,-1989. The inspec-
. tion' consisted of~ document reviews, interviews and observation of activities.
The findings-were summarized and discussed with you and members of your staff
- at'the conclusion of the inspection.
Based on the_results of this inspection, it' appears that in two instances, ac-
tivities'were 'not conducted in compliance with NRC requirements.
In one in-
stance, . failure to follow procedures accurately led to a reactor trip.
In the
.second. case, corrective actions in response to a previous violation were not
- adequate to control' problems with separations of electrical cable. Note that
ineffective corrective action was the subject of a previous violation in the
inspection report transmitted to you in a December 7, 1988 letter.
Please
respond to these matters in accordance with the enclosed Arpendix A.
- Your' cooperation with us 'is appreciated.
Sincerely,
g ,, o . . .. ~ ^ -
EDWARD C. WENllkGER
Edward C. Wenzinger, Chief
Projects Branch No. 4
Division of Reactor Projects
Enclosures:
- l '.
Appendix A, Notice of Violation
a'
_'2.
NRC Region I Combined Inspection Report Nos. 50-334/89-12 and 50-412/89-13
,
1
\\ \\
OFFICIAL RECORD COPY
IR BV 89-12/13 - 0001.0.0
.y
08/08/89
,/(f
8908230202 890811
ADOCK 0500
4
-
n
-
-
-
- -_
- - - - - -
-
,.
. x-
!
- <*
,
,
.
.
g g 1 1 1989
Duquesne Light Company
2
l^
cc w/encis:
J. J. Carey, Executive Vice President, Operations
J. O. Crockett, General Manager, Corporate Nuclear Services
W. S. Lacey, General Manager, Nuclear Operations
N. R. Tonet, Manager, Nuclear Engineering
T. P. Noonan, Plant Manager
i
C. E. Ewing, Manager, Quality Assurance
'
K. D. Grada, Manager, Nuclear Safety
H. R. Caldwell, General Superintendent, Nuclear Production, Ohio tdisen Company
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
C.J. Cowgill, DRP
N.F. Dudley, DRP
P. S. Tam, LPM, NRR
R. J. Bores, DRSS
J. R. Strosnider, DRS
RI:D
RI:D
Beall/m /pj
Cowgill
Wenzinger
7/18/89
8/t-/89
8/lp/89
0FFICIAL RECORD COPY
IR BV 89-12/13 - 0002.0.0
08/02/89
- _ _ _ _