Forwards Radiological Controls Insp Repts 50-334/89-06 & 50-412/89-06 on 890410-14.No Violations Noted.Lack of Awareness Re Requirements of 10CFR50.70(b)(4) Identified
ML20247D418
Person / Time
Site: Beaver Valley
Issue date: 05/15/1989
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20247D424 List:
References
NUDOCS 8905250412
Download: ML20247D418 (3)


See also: IR 05000334/1989006

Text

.o

. . .

.

i

MAY 151989

.

Docket Nos. 50-334

50-412

Duquesne Light Company

i -

ATTN: Mr. J. D. Sieber

'

Vice President

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject: NRC Combined Inspection Report No. 50-334/89-06; 50-412/89-06

A routine radiological controls inspection was conducted at the Beaver Valley

Power Station by Mr. R. L. Nimitz on April 10-14, 1989. Areas reviewed during

the inspection included action on previous NRC findings, radiological controls

during the Unit 2 outage, ALARA and audits. The findings of the inspection were

discussed with Mr. S. Lacey on April 14, 1989.

No violations were identified during the inspection. However, NRC observations

indicated a need to improve supervisory oversight of steam generator work

activitie and housekeeping inside the Unit 2 containment.

Our inspector also identified an apparent lack of awareness on the part of your

staff relative to the requirements of 10 CFR 50.70 (b)(4) which deals with

communication of NRC inspector presence onsite. You ere requested to review

L

this matter and ensure all appropriate personnel have been informed of this

j

requirement. We will review your actions during a subsequent inspection.

The inspection also identified an apparent significant increase in radiation

levels on primary components inside the Unit 2 containment due to radioactive

crud transport and deposition during shutdown. You are requested to review this

,

matter relative to the adequacy of your current radioactive source term

(

controls. We will review the results of your evaluation during a subsequent

inspection.

No response to this letter is required.

Your cooperation with us is

appreciated.

l

Sincerely,

Signal Signed By:

)

R:m:U R. BW! art,y

gg5] % $905153 ooh [

Ronald R. Bellam , Chief

i

Facilities Radio ogical Safety

~

G

and Safeguards Branch

Enclosure: Combined NRC Inspection Report

No. 50-334/89-06; 50-412/89-06

"[dd[lki;U!iO b

3h

i

,

..

,

p

.

l

l

l

MAY 151989

Duquesne Light Company.

2

cc w/ enc 1:

J. J. Carey, Executive Vice President, Operations

J. 0. -Crockett, General h0 nager, Corporate Nuclear Services

..W. 'S. Lacey,- General . Manage.r, Nuclear Operations

- N. R. Tonet, Manager, Nuclear Engineering

.

T. P. Noonan, Plant Manager

C. E.' Ewing,.QA Manager.

-K. D.-Grada, Manager Nuclear Safety

Public Document Room (Room)

PDR

Local Public Document

LPDR)

Nuclear Safety Information enter

-NRC Resident Ins)ector

Commonwealth of ) pennsylvania

..

_

_-_

_

..

- _ _ _ _ _ _ _ _

1

..;

,

.

MAY 151989

'

Duquesne Light Company

3

bec w/ encl:

Management Assistant, DRMA (w/o encl.) )

Region I Docket Room (with concurrences

L. Tripp,h, DRP

DRP

D. Limrot

P. Tam, LPM, NRR

R. J. Bores, Technical Assistant, DRSS

J. Wiggins, DRP

P. Wilson- DRP

PA0 (9) SALP Reports Only

l-

?

-

k

'

R]):BRb

RI:DRSS

RI:DRSS

I

.S

-

J[fpp

Bellamy

Nimitz

sik

P.L4

P

5/so/89

5/jt/89

5//Z/89

5/\\v/89

'hhbf!h, Ibbb $h

b

- - - ---

_----__