ML20059E753

From kanterella
Jump to navigation Jump to search
Forwards Requalification Program Evaluation Rept 50-334/90-14OL-RQ on 900709-19.Util Requalification Program Assigned Overall Rating of Satisfactory
ML20059E753
Person / Time
Site: Beaver Valley
Issue date: 08/24/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20059E755 List:
References
NUDOCS 9009100305
Download: ML20059E753 (2)


See also: IR 05000334/1990014

Text

b_q< .

c: .

,

[P '

'

!

.

1

AUG 2 4'1990

Docket No. 50-334

Duquesne Light Company .

'

Attn: Mr. J.D. Sieber

-Vice President'

Nuclear Group

. Post Office Box 4 .*

Shippingrort, PA 15077

. Gentlemen: J

SUBJECT: REQUALIFICATION PROGRAM EVALUATION REPORT'NO. 50-334/90-14(0L-RQ)

From July 9-19, 1990, the NRC administered requalification examinations to

. employees of your company who operate the Beaver Valley Power Station, Unit 1.  ;

The evaluation was conducted in accordance with Revision 5 to NUREG-1021, l

Operator Licensing Examiner Standards, ES-601, " Administration of NRC Requali-

'

i

- fication Program Evaluations." The evaluation .has two purpses:'(1) to evalu- I

ate individual operator competency; and, (2) to evaluate the effectiveness of l

the licensed operator requalification training program at Beaver Valley Unit.1. l

Generic findings and preliminary results were discussed during the interim and i

at.the conclusion of the two week examination period with members of your staff j

identified in the enclosed report.  !

! As a result of this evaluation, your' requalification program has been assigned )

L an overall- rating of " satisfactory." The NRC results indicate nine Senior

l. Reactor Operators, and seven Reactor Operators' passed all p6rtions of the .

1

requalification examination. There was one crew failure. Section 3.0 of the

L attached report contains the details of the program evaluation. -!

l .

.

. .)

In accordance with 10 CFR 2.790 of the-Commission's regulations, a. copy of this

u

l letter and the enclosure will be placed in the Public Document Room. ]

L

Should you have any questions regarding this examination, please contact me at

'

'

l - 215-337-5291.

Sincerely,

'

, orisinni SLB"'#'

e  ;

ROBERT M. GALLO l

E Robert M. Gallo, Chief  ;

l Operations Branch

Division of Reactor Safety

Enclosure: Requalification Program Evaluation Report

No. 50-334/90-14(OL-RQ) w/ Attachments 1, 2 f) p'A ('

{2 -

9009100305 900824

o

%

PDR

v

ADOCK 05000334

eDc

p.)w

sh

f.

'

lh'

'dn

ds Duquesne Light Company 2

.N'

v

cc w/ encl. and /.ttachments 1 and 2:

' J. J. Carey, Executive Vice President, Operations

J. 0..Crockett, General Manager, Corporate Nuclear Services

W. S. Lacey, General Manager, Nuclear Operations

N. R. Tonet, Manager, Nuclear Engineering

T. P. Noonan, Gene al Manager, Nuclear Operations

S. C. Fenner, QA Manager

K. D. Grada, Manager, Nuclear Safety

H. R. Caldwell, General Superintendent, Nuclear Operations

Public Document Room (PDR)

Local Public Document Roon (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania-

bec w/ enc 1. and Attachments 1 and 2:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1; w/o Attachments 1 and 2) 'l'

R. Bellamy, DRSS-

C. Cowgill, DRP

J. Caldwell, EDO  ;

P. Tam, NRR

R. Gallo, DRS

P. Eselgroth, DRS

B. Hughes, DRS

'

!

OL Facility File

i

DRS Files (3) i

i

!

-

!

L '!

l

l

DRS:RI D

u /aj k/dmt, ' oth Ga lo

(k/22/9 08/27/90 08 /90

L

l' 0FFICIAL RECORD COPY HUGHES/BV 90-14/7/27/90 - 0002.0.0

1 07/30/90

i

L