ML20059E753
| ML20059E753 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 08/24/1990 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sieber J DUQUESNE LIGHT CO. |
| Shared Package | |
| ML20059E755 | List: |
| References | |
| NUDOCS 9009100305 | |
| Download: ML20059E753 (2) | |
See also: IR 05000334/1990014
Text
b_
,
c:
q< .
.
[P '
!
'
.
1
AUG 2 4'1990
Docket No. 50-334
Duquesne Light Company
Attn:
Mr. J.D. Sieber
.
'
-Vice President'
Nuclear Group
. Post Office Box 4
. *
Shippingrort, PA 15077
. Gentlemen:
J
SUBJECT: REQUALIFICATION PROGRAM EVALUATION REPORT'NO. 50-334/90-14(0L-RQ)
From July 9-19, 1990, the NRC administered requalification examinations to
. employees of your company who operate the Beaver Valley Power Station, Unit 1.
The evaluation was conducted in accordance with Revision 5 to NUREG-1021,
l
Operator Licensing Examiner Standards, ES-601, " Administration of NRC Requali-
i
'
- fication Program Evaluations." The evaluation .has two purpses:'(1) to evalu-
I
ate individual operator competency; and, (2) to evaluate the effectiveness of
l
the licensed operator requalification training program at Beaver Valley Unit.1.
l
Generic findings and preliminary results were discussed during the interim and
i
at.the conclusion of the two week examination period with members of your staff
j
identified in the enclosed report.
!
!
As a result of this evaluation, your' requalification program has been assigned
)
L
an overall- rating of " satisfactory." The NRC results indicate nine Senior
l.
Reactor Operators, and seven Reactor Operators' passed all p6rtions of the
.
1
requalification examination. There was one crew failure. Section 3.0 of the
L
attached report contains the details of the program evaluation.
-!
l
.
.
.
.)
In accordance with 10 CFR 2.790 of the-Commission's regulations, a. copy of this
]
u
l
letter and the enclosure will be placed in the Public Document Room.
L
'
Should you have any questions regarding this examination, please contact me at
'
l
- 215-337-5291.
'
Sincerely,
orisinni SLB"'#'
,
e
ROBERT M. GALLO
l
E
Robert M. Gallo, Chief
l
Operations Branch
Division of Reactor Safety
Enclosure:
Requalification Program Evaluation Report
f) p'A ('
No. 50-334/90-14(OL-RQ) w/ Attachments 1, 2
{2 -
o
9009100305 900824
%
sh
ADOCK 05000334
p.)
v
eDc
w
f.
lh'
'
'd
n
ds
Duquesne Light Company
2
.N'
v
cc w/ encl. and /.ttachments 1 and 2:
' J. J. Carey, Executive Vice President, Operations
J. 0..Crockett, General Manager, Corporate Nuclear Services
W. S. Lacey, General Manager, Nuclear Operations
N. R. Tonet, Manager, Nuclear Engineering
T. P. Noonan, Gene al Manager, Nuclear Operations
S. C. Fenner, QA Manager
K. D. Grada, Manager, Nuclear Safety
H. R. Caldwell, General Superintendent, Nuclear Operations
Public Document Room (PDR)
Local Public Document Roon (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania-
bec w/ enc 1. and Attachments 1 and 2:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1; w/o Attachments 1 and 2)
'l
R. Bellamy, DRSS-
'
C. Cowgill, DRP
J. Caldwell, EDO
P. Tam, NRR
R. Gallo, DRS
P. Eselgroth, DRS
B. Hughes, DRS
!
'
OL Facility File
i
DRS Files (3)
i
i
!
-
!
L
'!
l
l
DRS:RI
D
u
/aj k/dmt,
' oth
Ga lo
(k/22/9
08/27/90
08
/90
L
l'
0FFICIAL RECORD COPY
HUGHES/BV 90-14/7/27/90 - 0002.0.0
1
07/30/90
i
L