Forwards Insp Repts 50-334/89-14 & 50-412/89-15 on 890801- 03.No Violations Noted
ML20247K305
Person / Time
Site: Beaver Valley
Issue date: 09/12/1989
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DETROIT EDISON CO.
Shared Package
ML20247K308 List:
References
NUDOCS 8909210129
Download: ML20247K305 (2)


See also: IR 05000334/1989014

Text

- - _ . .__ _ _ _ _ - _

DCS

..

'4

-

-'

.

~

'

'

SEP 121989

Docket Nos. 50-334

50-412

D_n=ane Light Conpany

ATIN: Mr. J. D. Sieber

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject: Inspection Nos. 50-334/89-14 & 50-412/89-15

A rurtine safety inspection of your annual swtycy preparedness exercise was

conducted by Mr. C. Gordan of this office and other hanimts of an NRC team on

Atzpst 1-3, 1989, at your Beaver Valley Power Station, Units 1 & 2,

Shippingport, Pennsylvania.. Discussions of our findings were held by Mr..Gordon

with Mr. Lacey and other w Mrw of your staff at the conclusion of the

.

inspection.

Areas examined during the irspection are described in the NRC Region I Inspec-

tion Report which is enclosed. Within these areas, the inspection consisted

of selective examination of procedures and twt =suitative records, interviews

with personnel, and nhamvation of the emergency exercise by team Naiimis.

Within the scope of this inspection, no violations were observed.

D_n==ne Licjht Ocupany's performance during the exercise demimi.tated the

ability to 2mplenent the Emergency Plan and the Emergency Plan Implementing

Procedures in a manner that would provide adequate protective measures for the

health and safety of the public.

No Igly to this letter is required. Your Wation with us in this rutter

is appreciated.

Sincerely,

orginal a14aea n

Ronald R. Bellamy, Chief

Facilities Radiological Safety and

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure: Region I Inspection Report Nos. 50-334/89-14 & 50-412/89-15

8909210129 890912

PDR ADOCK 05000334

Q PDC I. I

,~- .
  • k.1 -

_ _ _ _ _ _ _

- - - - - _ _ _ _ _ - - . -

_ - - - . - - - - - - - _ - - - - - - - . - - _ - - - - - - - - - . - - - - - - - - - - - - - - - - - - - . - - - - _ _ _ - - _ - - - - - -

' *

.

.;

. - 1

,

SEP 12 1989

Damne Light Campany 2

oc w/ encl:

J. J. Carey, Executive Vice President, Operations

J. O. Creda::t.t., General Manager, Corporate Nuclear Services

i

W. S. Iaoey, General Manager, Nuclear Operations

l N. R. Tanet, Manager, Nuclear Engineering  !

T. P. Noonan, Plant Manager

S. C. Fenner, QA Manager

K. D. Grada, Manager, Nuclear Safety

Public Docket Room (PER)

Iocal Public Docket Room (LPER)

Nuclear Safety Information Center (NSIC)

NRC Resident. Inspector

Ocnnmonwealth of Pennsylvania

FDR III

boc w/ encl:

Region I Docket Rocan (with concurrences)

Managwi=ud. Assistant, IEMA (w/o encl)

C. Cowgill, IEP

N. Dudley, IRP

P. Tam, IRf, NRR

J. Wiggins, IRP

R. Van Niel, NRR

CG-

Gordon FCKJ

kh Iazarus

M

Bellamy

9/$/89 9/ /89 9/y/89 9/{/89

h

Official Record Copy

I

- _ - _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ _