Forwards Insp Rept 50-337/87-10 on 870605-17.Violation Noted.Insp Rept Documents Failure of Organization to Properly Design & Test Control Room Chlorine Detection Sys. Enforcement Conference Scheduled for 870702
ML20216C496
Person / Time
Site: Beaver Valley, 05000337
Issue date: 06/23/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20216C500 List:
References
NUDOCS 8706300297
Download: ML20216C496 (2)


Text

A, .

<f jg 2 SW

!

. Docket / License: 50-334/DPR-66 Duquesne Light Company

' ATTN: Mr. J. D. Sieber Vice President;

' Nuclear' Operations Post Office Box 41 Shippingport, Pennsylvania 15077 j i

' Gentlemen:

Subjecti Inspection 50-334/87-10

During the period June. 5-17, 1987, Messrs. F. Young and S. Pindale~of the NRC Region I~ staff conducted a special safety inspection of activities'at Beaver Valley ,

Nuclear 1 Power Station, Unit 1, Shippingport, Pennsylvania. At the conclusion of- 4 the inspection, Mr.. Young of my staff summarized the inspection findings with you :l and other. members of your. staff; The results of this~ inspection are documented

'in the enclosed repor '

q L A number of concerns-raised in this report require your~special attention. This-inspection report documents the failure of.your organization to properly design

'

.and test the Control Room. Chlorine Detection System. Technical Specification

'3.3.3.7, effective September 29, 1980, requires that this system be operable when the reactor is.in Modes 1 through 4, or that'the control room ventilation ~ system be in the recirculation mode. However, from testing conducted on this system'in May'1987 in support of Unit 1/2 control room modifications, the chlorine detection rystem was determined to never hav- Lo Pinctional and the system was declared-inoperable on May 4, 1987. Threefore, it appears .that all. operation in Modes 1-4 without the control room' ventilation system in recirculation between September 29, 1980 and May 4,1987 was in violation of the Technical Specification i We' consider this apparent violation to be serious and are considering further en -

forcement action. Consequently, we have scheduled an Enforcement Conference'on July.2, 1987. At this meeting, you should be prepared to discuss the circumstances surrounding this event and your corrective actions to prevent recurrence of prob -

lems of_this nature. In particular, this should include the adequacy of your pre- !

vious~and current design and testing processes, including your assessment of-the- 1 potential for any other plant modifications to be similarly affecte I Your cooperation with us in these matters is appreciate {

Sincerely, 32 "alSigned By:

)

William F. Kane, Director Division of Reactor Projects Enclosure: NRC Region I Inspection Report No. 50-334/87-10-8706300297 870622 7 )

-

D ADOCK 050 g 4 g

!

x dy , :*

DuquesneLightLCompany< 2

cc.w/ enc 1 4-H. M. Siegel, Manager,' Nuclear Engineering Department- E.' Ewing, QA Manager-

- W..S.. Lacey, Plant Manager '

R. Druga, Manager,. Technical Services R. Martin, Manager, Regulatory Affairs-

- J. Crockett,. Senior Manager of Nuclear Operation Ni R. Tonet, Manager,' Nuclear: Engineering & Construction Unit-

.Public' Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC) .

NRC Resident Inspecto . Commonwealth of Pennsylvania-

- bec w/ enc 1:

Region I' Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)-

Section Chief,- DRP . ,

M.'McBride, RI, Pilgrim-F. Young, SRI,.BV-2

'

P. Tam, LPM, NRR ..

y Robert J. Bores, DRSS

~

,

,

R RP Rl y P RI:DRP R -Q

/ - / 66