Ack Receipt of Changing Schedule for Completion of Corrective Actions Re Insp 50-334/88-02.Actions Will Be Examined During Next Insp of Unit 2 Emergency Operating Procedures,Scheduled for Sept 1989
ML20247D404
Person / Time
Site: Beaver Valley
Issue date: 05/12/1989
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
References
NUDOCS 8905250405
Download: ML20247D404 (2)


Text

..

_

.

_ _ _ _ - _

_

l}(

'

1.

,

.,,

-

,

.

. NAY i 2 1Ng

'

..

,

,

.

Docket No. 50-3341 j

'

lh Duquesne Light Company ATTN:.Mr. J. D. Sieber

!'

. Vice President-Nuclear Group

-

. Post' Office. Box 4 Shippingport, Pennsylvania 15077 Gentlemen:

-

Subject:

Inspection No.'.50-334/88-02 This refers Lto'your letter dated February.21,1989 which revises your' action plan schedule provided in your letter dated May 13, 1988.

Thank you for informing us of the schedule change for completion of corrective

' actions' documented in your letter.

These actions will be examined during'the'

inspection of the Unit 2 Emergency Operating Procedures scheduled for September 1989.

lYour cooperation with us is appreciated.

'

'

Sincerely, Robert M. Gallo, Chief-Operations Branch Division of Reactor Safety cc:

J' J. Carey, Executive Vice President, Operations

.y

.

J. O. Crockett, General Manager, Corporate Nuclear Services W. S. Lacey, General Manager, Nuclear Operations

'

'N. R. Tonet,-Manager, Nuclear Engineering T. P. Noonan, Plant Manager

.

C. E. Ewing, QA Manager K. D. Grada,' Manager, Nuclear Safety

..

Public Document Room (PDR)

Local.Public Document Room (LPOR)

Nuclear' Safety Information Center (NSIC)

'l NRC Resident Inspector

'

Commonwealth of Pennsylvania (Ol 8905250405 890512

'

PDR ADOCK 05000334 i

,

G PNU g

(

OFFICIAL RECORD COPY RL BV1 88-02 - 0001.0.0 05/11/89

_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -

_ _. - _ _ _

!

-

.

.4

_

l 4'

.Duquesne Light Company-2-

bec:

Region I Docket Room (with concurrences)

L. Tripp, DRP D. Limroth, DRP P..

Tam, LPM, NRR R. Bores, DRSS J. Wiggins, DRP

P. Wilson, DRP l

B. Norris, DRS

!

i

!

RI: S Ea Gallo 5/[{/89 5d h s

.

OFFICIAL RECORD COPY RL BV1 88-02 - 0002.0.0 05/11/89

,

-

______-___-_ __ _

_ _ _

. _ _

.__

_.

_

.___u

,

_-- - __-_- _ -

.v.

~

b

'gc/b

'

g gage vanev pow staoon

/

l Shopmgoort. PA 15077 0004 e

s.<

n Nuciear Group.

C2)6452%'

February 21, 1989 U.

S.

Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 Reference:

Beaver Valley Power Station, Unit No. 1

. Docket No. 50-334, License No. DPR-66

..

Inspection Report'50-334/88-02 Gentlemen:

By letter dated May 13, 1988, Duquesne Light Company provided a

reply to address.the Notice of Deviation which was included with NRC Inspection Report 50-334/88-02. ~ Unit 1 Emergency Operating The Notice of Deviation stated.that when the Beaver Valley Procedures (EOPs)

were upgraded per Generic Letter 82-33.

requirements, many of the EOPs did not adhere to the guidelines of the NRC approved Procedures Generation Package (PGP).

In our reply, we committed to address the identified concerns in accordance with our existing schedule for the revision of the Unit 1 EOPs.

An action plan was provided, along with target dates for addressing specific problem areas.

All tasks were expected to be completed by March 31, 1989.

This effort has taken longer than originally anticipated, therefore, our action plan schedule has been revised.

All action

'

plan tasks are now scheduled to be completed for both Unit 1 and Unit

EOPs -prior to the return to service of Unit 2 from its first refueling outage.

This is expected to occur during May, 1989.

The revised EOPs for both units will be in use at that I

time.

J Our need for additional time to complete our actions has previously been discussed with our Senior Resident Inspector.

g This submittal provides formal notification of our revised completion date.

dhh

.

. _ _.

_ - _. -

-.

_-

- _

---_--_-----_-------O'

_ _ _ _ _ - _ _ _ _.

.

=

'

  • ss,*

<<

'

Beaver Valley Power Station, Unit No. 1

.

..

Dockst No. 50-334, License No. DPR-66

,Page 2 If there are any questions concerning this response, please contact my office.

Very truly yours, l1* -

,

J.

D.

Sieber Vice President Nuclear Group Attachment cc:

Mr.

J.

Beall, Sr. Resident Inspector L

'Nr.

W.

T.

Russell, NRC Region I Administrator

,

Mr.

P.

Tam, Sr. Project Manager Director, Safety Evaluation & Control (VEPCO)

l l

l l

l L

-

- _ _ _ _ _. _ -

_ _ _ _ _ -. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

____