September 30, 1999
'
Mr. J. E. Cross
Generation Group
Duquesne Light Company
Post Office Box 4
Shippingport, Pennsylvania 15077
SUBJECT:
NRC INTEGRATED INSPE7 TION REPORT NOS. 50-334/99-05;50-412/99-05
Dear Mr. Cross:
This refers to the inspection conducted ffom July 25 to September 4,1999, at the Beaver Valley
Power Station facility. The enclosed report represents the results of this inspection.
i
During the 6-week inspection period, your conduct of activities at the Beaver Valley Power
Station facility was characterized by safe operation. Overall prioritization of various backlogs
-including the maintenance procedure change and engineer:ng backlogs was appropriate.
However, the backlogs remain high which requires continued emphasis and management
oversight.
Based on the results of this inspection, the NRC has determined that two Severity Level IV
violations of NRC requirements occurred. The violations were identified by our inspectors and
are being treated as Non-Cited Violations (NCVs), consistent with Appendix C of the
Enforcement Policy. These NCVs involved failures to follow the operation manual procedure
associated with configuration control and failure to take timely corrective actions for three
engineering backlog items. The NCVs are described in the subject inspection report. If you
contest the violations or severity level of the NCVs, you should provide a response within
30 days of the date of this inspection report, with the basis for your denial, to the Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with
copies to the Regional Administrator, Region I, and the Director, Office of Enforcement, United
States Nuclear Regulatory Commission, Washington, DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room.
Sincerely,
Original Signed by:
Peter W. Eselgroth, Chief
Projects Branch 7
[
Divisien of Reactor Projects
Docket Nos.: 50-334,50-412
License Not: DRP-66, NPF-73
>
Enclosure: Inspection Report Nos. 50-334/99-05,50-412/99-05
9910070076 990930
AIMK 05000334
G
^
OFFICIAL RECORD COPY
IE:01
I
...
.
"
Mr. J. E. Cross -
2
'
cc w/ encl:
S. Jain, Senior Vice President, Nuclear Services Group
L Myers, Executive Vice President, Generation Group
K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager
i
W. Pearce, General Manager, Nuclear Operations Unit
W. Kline, Manager, Nuclear Engineering Department
M. Pearson, Manager, Quality Services Unit
M. Ackerman, Manager, Safety & Licensing Department
J. Macdonald, Manager, System and Performance Engineering
J. A. Huitz, Manager, Projects and Support Services, FirstEnergy
M. Clancy, Mayor, Shippingport, PA
Commonwealth of Pennsylvania
State of Ohio
State of West Virginia
(
'
,
,
.
"
Mr. J.'E. Cross
3,
Distnbution w/ encl:
Region 1 Docket Room (with concurrences)
Nuclear Safety information Center (NSIC)
PUBLIC
NRC Resident inspector
H. Miller, RA/J. Wiggins, DRA
P. Eselgroth, DRP.
N. Perry, DRP
C. O'Daniell, DRP
Distribution w/enci(VIA E-MAIL):
M. Tschiltz, OEDO -
E.' Adensam, PD1, NRR .
S. Bajwa, PDl-1, NRR
- D. Collins, PM, PDl-1, NRR -
V. Nerses, PDl-1 NRR
' R. Correia, NRR
-
DOCDESK
Inspection Program Branch, NRR (IPAS)
D. Barss, NRR -
y
I
!
!
DOCUMENT NAME:G:\\ BRANCH 7\\ Beaver Valley \\bv9905.wpd
To race,ve a copy of this document. Indicatein the box: "C" = Copy without ettschment/ enclosure T = Copy with ettachment/ enclosure "N" =
No cept
OFFICE
Rl/DRP
l
Rl/QRpf
l6
l
/
l
~
NAME -
Kern /algf,r
M
-
'
0'8499
DATE-
9/W/99
9
30