ML20203D069

From kanterella
Jump to navigation Jump to search

Forwards SE Accepting Approval of Proposed Revs to Plant QA Program Description in Chapter 17.2 of Updated Fsar,Per Util 981224 Submittal
ML20203D069
Person / Time
Site: Beaver Valley
Issue date: 02/10/1999
From: Dan Collins
NRC (Affiliation Not Assigned)
To: Cross J
DUQUESNE LIGHT CO.
Shared Package
ML20203D073 List:
References
TAC-MA4521, TAC-MA4522, NUDOCS 9902160003
Download: ML20203D069 (4)


Text

.

. Mr. J. E. Cross Februan 10, 1999 Pr:sid:nt-Generttion Group Duqu:sna Light Comp:ny Post Office Box 4 Shippingport, PA 15077 i

SUBJECT:

APPROVAL OF PROPOSED REVISIONS TO THE BEAVER VALLEY POVvER STATION, UNIT NOS.1 AND 2, QUALITY ASSURANCE PROGRAM DESCRIPTION (TAC NOS. MA4521 AND MA4522)

Dear Mr. Cross:

By letter dated December 24,1998, Duquesne Light Company (DLC) submitted a request for approval of a proposed change in the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) Program described in Chapter 17.2 of the BVPS-2 Updated Final Safety Analysis Report (UFSAR). The BVPS-1 and BVPS-2 QA Program description is applicable to both units and is contained in the BVPS-2 UFSAR. Specifically, DLC proposed that the procurement document review function for materials and equipment be transferred from the Quality Services Unit (OSU) to the line organization (Nuclear Procurement Department). QSU personnel would remain responsible for reviewing purchasing documents related to services. This change was submitted pursuant to 10 CFR 50.54(a)(3) as a change that reduced commitments in the BVPS-1 and BVPS-2 QA Program description previously approved by the Nuclear Regulatory Commission (NRC).

The NRC staff has reviewed the proposed change to the QA Program description and has concluded that the proposed change will continue to satisfy the requirements of Appendix B to 10 CFR Part 50 and is, therefore, acceptable. The enclosed safety evaluation documents the bases for our conclusion that the proposed change to the QA Program description is acceptable.

Please contact rne at 301-415-1427 if you have any questions regarding this issue.

Sincerely, Original signed by:

Daniel S. Collins, Project Manager bk P

Dohk0$0$0034 Project Directorate 1-1 PDR Division of Reactor Projects - 1/ll Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 Enc!osure: Safety Evaluation cc w/ encl: See next page tm o F.9 F, g M L # " %..,c. ~'~ m he nYe

, 2 ;f Y

' ' , gj DISTRIBUTION:

Docket File MO'Brien ACRS 3 PUBLIC DCollins PEselgroth, RGN-I PDI-1 Reading JZwolinski OGC RGramm JPeralta &fU l SBajwa RNorsworthy (E-Mail SF to RCN)

RCorreia OFFICE _. PQl-1/PM PDMdA/l PDI-1/d NAME Dhol s:lec rie jwa DATE 2/W/99 M/h/99 I /*/99 OFFICIAL RECORD COPY DOCUMENT NAME: G:\ BEAVER \QACG4376.WPD

. . Mr. J. E. Cross February 10, 1999

, Pr:sid:nt-Gen:rction Group Duqu;sn] Light Comp:ny f Post Office Box 4 Shippingport, PA 15077 i

SUBJECT:

APPROVAL OF PROPOSED REVISIONS TO THE BEAVER VALLEY POWER STATION, UNIT NOS.1 AND 2, QUALITY ASSURANCE PROGRAM DESCRIPTION (TAC NOS. MA4521 AND MA4522) i

Dear Mr. Cross:

By letter dated December 24,1998 Duquesne Light Company (DLC) submitted a request for approval of a proposed change in the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) Program described in Chapter 17.2 of the BVPS-2 Updated Final Safety Analysis Report (UFSAR). The BVPS-1 and BVPS-2 QA Program description is applicable to both units and is contained in the BVPS-2 UFSAR. Specifically, DLC proposed that the procurement document review function for materials and equipment be i transferred from the Quality Services Unit (OSU) to the line organization (Nuclear Procurement l

Department). QSU personnelwould remain responsible for reviewing purchasing documents '

related to services. This change was submitted pursuant to 10 CFR 50.54(a)(3) as a change that reduced commitments in the BVPS-1 and BVPS-2 QA Program description previously .

approved by the Nuclear Regulatory Commission (NRC).

I The NRC staff has reviewed the proposed change to the QA Program description and has l concluded that the proposed change will continue to satisfy the requirements of Appendix B to 10 CFR Part 50 and is, therefore, acceptable. The enclosed safety evaluation documents the bases for our conclusion that the proposed change to the QA Program description is acceptable. l Please contact me at 301-415-1427 if you have any questions regarding this issue.

Sincerely, 4

Original signed by:

Daniel S. Collins, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

Safety Evaluation cc w/ encl: See next page DISTRIBUTION:

Docket File MO'Brien ACRS PUBLIC DCollins PEselgroth, RGN-1 PDI-1 Reading OGC JPeralta JZwolinski RGramm RNorsworthy (E-Mail SE to RCN)

SBaiwa RCorreia OFFICE RQl-1]PM PDI-1kN1 PDI-1]Il NAME Dhol s:lec MChri a DATE 2/'#/99 M/99 I /* /99 OFFICIAL RECORD COPY DOCUMENT NAME: G:\ BEAVER \QACG4376.WPD

[ "4

't UNITED STATES

( !o j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666 4 001

% February 10, 1999 Mr. J. E. Cross President-Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077

SUBJECT:

APPROVAL OF PROPOSED REVISIONS TO THE BEAVER VALLEY POWER STATION, UNIT NOS.1 AND 2, QUALITY ASSURANCE PROGRAM DESCRIPTION (TAC NOS. MA4521 AND MA4522)

Dear Mr. Cross:

l By letter dated December 24,1998, Duquesne Light Company (DLC) submitted a request for I approval of a proposed change in the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) Program described in Chapter 17.2 of the BVPS-2 Updated Final Safety Analysis Report (UFSAR). The BVPS-1 and BVPS-2 QA Program description is applicable to both units and is contained in the BVPS-2 UFSAR. Specifically, DLC proposed that the procurement document review function for materials and equipment be transferred from the Quality Scrvices Unit (OSU) to the line organization (Nuclear Procurement ,

Department). QSU personnel would remain responsible for reviewing purchasing documents i related to services. This change was submitted pursuant to 10 CFR 50.54(a)(3) as a change that reduced commitments in the BVPS-1 and BVPS-2 QA Program description previously approved by the Nuclear Regulatory Commission (NRC).

The NRC staff has reviewed the proposed change to the QA Program description and has concluded that the proposed change will continue to satisfy the requirements of Appendix B to 10 CFR Part 50 and is, therefore, acceptable. The enclosed safety evaluation documents the bases for our conc;usion that the proposed change to the QA Program description is acceptable.

Please contact me at 301-415-1427 if you have any questions regarding this issue.

Sincerely,

/ m f S, bW aniel S. Collins, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11

. Office of Nuclear Reactor Regulation i

Docket Nos. 50-334 and 50-412

Enclosure:

Safety Evaluation cc w/ encl: See next page l

l L _

J. E. Cross Beaver Valley Power Station, Units 1 & 2 Duquesne Light Company cc:

Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge Pennsylvania Department of 2300 N Street, NW. Environmental Resources Washington, DC 20037 ATTN: Michael P. Murphy Post Office Box 2063 Director-Safety and Licensing Harrisburg, PA 17120 Department (BV-A)

Duquesne Light Company Mayor of the Borough of Beaver Valley Power Station Shippingport PO Box 4 Post Office Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner Roy M. Smith Regional Administrator, Region i West Virginia Department of Labor U.S. Nuclear Regulatory Commission Building 3, Room 319 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WV 25305 Resident inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 Director, Pennsylvania Emergency Duquesne Light Company Management Agency Beaver Valley Power Station Post Office Box 3321 PO Box 4 Harrisburg, PA 17105-3321 Shippingport, PA 15077 ATTN: S. C. Jain, Senior Vice President Ohio EPA-DERR Nuclear Services (BV-A)

ATTN: Zack A. Clayton Post Office Box 1049 Mr. J. A. Hultz, Manager Columbus, OH 43266-0149 Projects & Support Services First Energy Dr. Judith Johnsrud 76 South Main Street National Energy Committee Akron, OH 44308 l

Sierra Club

433 Orlando Avenue l State College, PA 16803 Duquesne Light Company Beaver Valley Power Station PO Box 4 Shippingport, PA 15077 ATTN
Kevin L. Ostrowski, Division Vice i President, Nuclear Operations Group and Plant Manager (BV-SOSB-7) l