Annual Assessment Letter for Beaver Valley Units 1 and 2 (Report 05000334/2012001 and 05000412/2012001)
ML13063A077
Person / Time
Site: Beaver Valley  FirstEnergy icon.png
Issue date: 03/04/2013
From: Darrell Roberts
Division Reactor Projects I
To: Harden P
FirstEnergy Nuclear Generation Corp
HUNEGS, GK
References
IR-12-001
Download: ML13063A077 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY UNITS 1 AND 2 (05000334/2012001 AND 05000412/2012001)

Dear Mr. Harden:

On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Beaver Valley Units 1 and 2 during the most recent quarter was within the Regulatory Response Column of NRC=s Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs as described in NRC Inspection Report 05000334/2012404 and 05000412/2012404 sent on August 16, 2012. Beaver Valley Units 1 and 2 transitioned to the Regulatory Response Column beginning the third quarter of 2012 as documented in a letter issued by the NRC on December 14, 2012. Consistent with the graded approach in the NRCs Reactor Oversight Process, this change in performance from the Licensee Response Column to the Regulatory Response Column results in a corresponding increase in the NRCs inspection and assessment oversight. Therefore, in addition to ROP baseline inspections, the NRC plans to schedule and conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," after your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction (TI) 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Gordon K. Hunegs at (610)337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Darrell J. Roberts, Director Division of Reactor Projects Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73 Enclosure: Beaver Valley Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML13063A077 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber/ GSB GHunegs/ GKH DRoberts/ DJR DATE 02/ 21 /13 02/ 26 /13 02/ 28/13

Page 1 of 2 Beaver Valley 01/28/2013 08:34:44 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP 4 1, 2 09/03/2013 09/06/2013 IP 7111402 Alert and Notification System Testing 1, 2 09/03/2013 09/06/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 09/03/2013 09/06/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies MODS - PERMANENT PLANT MODIFICATIONS 6 1, 2 01/28/2013 02/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 02/11/2013 02/15/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 71124 - OCC RADIATION SAFETY 1 1, 2 01/28/2013 02/01/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 01/28/2013 02/01/2013 IP 71124.02 Occupational ALARA Planning and Controls 71124 - OCC RADIATION SAFETY 1 1, 2 04/01/2013 04/05/2013 IP 71124.07 Radiological Environmental Monitoring Program 7111107T - TRIENNIAL HEAT SINK 1 1, 2 06/03/2013 06/07/2013 IP 7111107T Heat Sink Performance 7111111B - BV2 REQUAL INSPECTION WITH P/F RESULTS 2 2 08/26/2013 08/30/2013 IP 7111111B Licensed Operator Requalification Program 71124 - OCC RADIATION SAFETY 1 1, 2 07/29/2013 08/02/2013 IP 71124.05 Radiation Monitoring Instrumentation 60853 - ISFSI PAD CONSTRUCTION 2 1, 2 09/01/2013 12/31/2013 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 71124 - OCC RADIATION SAFETY 1 1, 2 09/30/2013 10/04/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/30/2013 10/04/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/30/2013 10/04/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/30/2013 10/04/2013 IP 71124.04 Occupational Dose Assessment 7111108P - U1 INSERVICE INSPECTION 1 1 10/07/2013 10/18/2013 IP 7111108P Inservice Inspection Activities - PWR PI&R - PI&R TEAM 7 1, 2 11/18/2013 11/22/2013 IP 71152B Problem Identification and Resolution 1, 2 12/02/2013 12/06/2013 IP 71152B Problem Identification and Resolution TI 182 - DEGRADED UNDERGROUND PIPING - PHASE 2 1 1, 2 12/09/2013 12/13/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Beaver Valley 01/28/2013 08:34:44 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - OCC RADIATION SAFETY 1 1, 2 01/27/2014 01/31/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 01/27/2014 01/31/2014 IP 71124.02 Occupational ALARA Planning and Controls 71124 - OCC RADIATION SAFETY 1 1, 2 04/21/2014 04/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/21/2014 04/25/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/21/2014 04/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/21/2014 04/25/2014 IP 71124.04 Occupational Dose Assessment 7111108P - U2 INSERVICE INSPECTION 1 2 04/28/2014 05/09/2014 IP 7111108P Inservice Inspection Activities - PWR EP EXER - EP EXERCISE INSPECTION 1 1, 2 06/16/2014 06/20/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.