f.
.
..
.
INITIAL OPERATING LICENSE REVIEW REPORT FOR
. BEAVER VALLEY POWER STATION, UNIT.2 DOCKET NO. 50-412 INSPECTION REPORT NUMBER 50-412/87-44 i
i
'
PREPARED BY:
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
,
.
,
'
,
.
.
-
-
-.. - - - _,... -. _. _,
_ _ _ _.,,. _ -. _ _. _ _, - -, _,,,, _.. _....
... _,. _. -, -,
.
..
,.... _..
(
,
..
.
SUMMARY FOR BEAVER VALLEY. POWER STATION, UNIT 2 Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings
.73-01 8/21-9/17/73 Quality Assurance program for Significant finding:
construction.
The program was found not to meet require-ments of 10 CFR 50,
Appendix B, in 9 i
criteria.
73-02 11/26-30/73 Review of Revision 1 of DLC None, i
QA procedures.
74-01 5/14-17/74 QA program implementation.
None.
74-02 5/28-31/74 Laboratory proof tests of None.
I concrete design trial mixes.
74-03 8/12-16/74 QC program related to exca-Infraction: Control of
vation, backfill, and founda-measuring and test tions.
equipment does not conform to established procedures.
74-04 8/26-29/74 Environmental monitoring Deficiency: Air was
,
l
program, not sampled and analyzed
'
at each specific loca-tion as required.
I 75-01 4/23-25/75 Environmental monitoring None.
l
program.
l 75-02 6/18/20/75 Audit for conformance to Deficiencies: Failure
'
FSAR and QA program design to follow Engineering review commitments.
Management procedures.
Discrepancies with re-spect to performance and documentation of design review.
76-01 2/9-12/76 Site preparation and founda-None.
tion.-
45 Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Area s
' Noteworthy Findings 76-02 5/4-7/76 Review procedures, records,-
Infraction: Licensee
and work activities for site senior inspectors did preparation and foundations; not complete required review DLC QA/QC procedures.
indoctrination and training.
76-03 5/18-21/76 Environmental monitoring None.
program.
76-04 7/12-14/76 Containment foundation.
None.
76-05 9/14-16/76 Foundations.
None.
76-06 11/2-5/76 Design change requirements None.
involving site foundation soil densification.
77-01 1/25-28/77 Environmental monitoring None.
programs.
77-02 2/1-4/77 Administrative controls re-Deficiency: Failure
lated to Category 1 founda-to train personnel tions and containment base performing activities material, affecting safety (77-02-01).
77-03 3/14-18/77 QA aspects of foundations.
None.
77-04 5/16-18, Containment foundation Infractions: Failure 24-25/77 to provide documented
procedures.
Failure to provide for testing of concrete vibrations.
77-05 6/13-15/77 Containment base material.
None.
77-06 7/18-21/77 Reactor containment QA pro-Infraction: Failure
gram; electrical cable tray to perform all required installation.
inspections for safety-related pipe welds.
77-07 9/13-16/77 Containment liner erection; Infraction: Failure 2-storage / maintenance of to follow procedure safety-related equipment.
for storage.
l l
.
a
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 77-08 10/25-28/77 Containment.
None.
77-09 11/30-12/2/77 Containment liner erection.
None.
77-10 12/19-21/77 Pressure vessel lift and None.
transportation.
78-01 1/10-12/78 NRC Circulars and Bulletins. None.
78-02 1/10-13/78 Environmental protection None.
program.
78-03 1/17/78 Transportation of steam None.
generators.
78-04 2/7-10/78 Contractor (piping) QA pro-None.
gram.
78-05 3/8-10/78 Reactor vessel and steam None.
generator storage; struc-tural velding and NDE proce-dures.
78-06 4/4-6, 11, Construction QC procedures None.
12/78 containment wall concrete
placement.
78-07 4/11-14/78 Containment penetration.
Infraction: Failure
to follow cadweld procedures.
78-08 5/8-11/78 Containment.
None.
78-09 6/6-9/78 Electrical installation; None.
'
safety-related piping, safety-related structures and supports.
78-10 7/11-14/78 Containment structural steel None.
I and penetrations.
78-11 8/21-24/78 Construction of boric acid None.
I tank, ___
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
.
47 Inspection Dates / Number Inspection Enforcement Actions /
__ Number of Inspectors Areas Noteworthy Findings 78-12 Containment building rebar None.
and concrete.
78-13 10/24-26/78 Auxiliary building construc-None.
tion.
78-14 12/11-14/78 Containment rebar installa-
tion, exterior wall erection.
79-01 1/29-31/79 Containment penetrations and None.
liner.
79-02 2/28-3/1/79 Environmental protection Deficiency: Failure
program, to control effluents from concrete disposal.
79-03 3/6-9/79 Equipment storage; welding Infraction: Failure QA procedures, to provide proper weld slopes for piping diameter transitions.
79-04 4/9-10/79 Containment and auxiliary None.
butiding construction.
79-05 7/23-26/79 Concrete QC program; equip-Infraction: Failure
ment storage and maintenance to provide adequate document control.
procedure for equipment maintenance and protec-tion.
79-06 8/27-30/79 Compliance with ASME certi-None.
I fication; compliance with 10 CFR 21; safety-related steel structure QC.
79-07 10/16-19/79 QC program; piping fabrica-None.
tion and installation; struc-tural steel fabrication and erection.
79-08 11/6-8/79 QC program for handling and Infraction: Failure
installation of pipe, to ccmply with specs receipt and storage of pipe.
for pipe hanger and support preservatio.
e
<
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 79-69 12/10-13/79 Pipe welding; structural Infraction: Failure
steel welding procedures; of drawings to require welder qualifications, maintenance of vertical separation of cable trays.79-179 12/10-13/79 Investigation of allegation Allegations were un-1/8-9, regarding welder qualifica-substantiated.
14-16/80 tions.
80-01 1/15/80 Allegation investigation.
Allegation not sub-
stantiated.
80-02 1/7-11/80 Allegation investigation.
Two of six allegations substantiated, internal audits not performed in required time period; training program not adequate to satisfy regulatory requirements.
80-03 3/25-28/80 QC program for concrete None.
placement; storage and main-tenance of equipment.
80-04 4/7-11/80 Pipe welding; welding Infraction: Failure
records; structural steel to provide evidence welding procedures and of evolution and dis-welder qualifications.
position of indications in weld radiographs.
80-05 6/4-6/80 Environmental protection None.
program.
80-06 6/2-6/80 Pipe welding and records; Infraction: Failure
structural steel welding and to return used/ damaged welder qualifications; elec-weld electrodes.
trical and instrument QC.
80-07 7/7-10/80 Structural steel installa-None.
I tion; storage of equipmen.
e
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings
_
80-08 8/11-15/80 Electrical cable and tray None.
3-procurement QC; containment line dome records; steam generator support welds; in-dependent verification of
'
pipe weld thickness.
80-09 9/22-24/80 Turnover of project inspec-None.
tor responsibilities; con-crete placement; settlement monitoring program; QC pro-cedures.
80-10 12/2-4/80 Concrete placement records; None.
shear wall design deficiency; neutron shield tanks; crane-wall repair.
81-01 2/2-5/81 Concrete placement; settle-None.
I ment monitoring; seismic calculations.
81-02 5/5-7/81 project inspector turnover; Noncompliance: Failure
facility tour, to provide adequate storage for piping (Level IV).
81-03 7/6-15/81 Direct independent inspec-None.
tion of neutron shield tank with NDE Mobile Lab.
81-04 5/19/81 SALP Management Meeting.
--
81-05 6/15-25/81 Cable tray qualification None.
data; storage and mainten-ance of electrical equip-ment; vendor QA program.
81-06 8/3-7, 17-21, Tour of construction activi-Violation: Inadequate 9/30/81 ties; construction proce-protectien of electri-
dures for pipe cleanness cal controls (Level and installation.
IV).
<
s.
.
,,
Inspection Dates / Number Inspection Enforcement Actions /
'
Number of Inspectors Areas Noteworthy Findings 81-07 8/18-21/81 Concrete placement; backfill None.
compaction tests; settlement monitoring program; signifi-cant deficiency in structural design of control room exten-t sion.
81-08 10/1-16; Construction activities, None.
1.1/9-20, welding records; neutron 30/61 shield tank; procedures; con-
,
crete drilling for imbeds.
- 81-09 12/1-31/81 Control room rebar design Violation: Failure deficiency; fuel transfer to establish quantita-canal concrete; HVAC duct tive acceptance cri-installation; piping records, terial (Level IV).
receipt inspection reports,
'
'
,-
component storage.
f 82-01 1/2-2/26/82 Piping installation, storage, Violations: Failure
NDE laboratory direct in-to achieve proper weld spection.
control (Level IV).
Failure to assure con-trol of delta-ferrite in stainless steel welds (Level V).
82-02 3/1-4/7/82 Piping and hangers; struc-Violations: Failure
tural steel and supports; to provide quantitative welder and procedure quali-criteria to assure fications, adequate weld size (Level IV).
Failure to perform fit-up in-spection to an accept-able inspection program (Level IV).
82-03 3/25/82 SALP Management Meeting.
--
82-04 4/7-5/6/82 Concrete placement and test-Violation: Failure
ing; QA manual, to comply with QA manual (Level IV).
82-05 4/5-8/82 Safety related cable, cable None.
I trays and conduit.
.
O
/
o
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings -
82-06 5/7-6/1/82 Containment liners, supports None.
installation; weld material control; NDE; storage con-trol; circulars and 10 CFR 21 Reports.
82-07 6/2-7/6/82 Containment liner; supports Violations: Failure
installation; Class 1 pipe to control and identify welds; storage; NDE, follow-nonconforming Category up on 10 CFR 50.55(e) re-I material (Level IV).
ports.
Failure to perform in-spection of containment liner IAW specifica-tions (Level IV).
82-08 7/7-8/2/82 Welding; NDE; instrument Violation: Failure to
calibration; drawing con-protect electrical trol; electrical installa-panels from airborne tion; storage, contaminants (Level IV).
82-09 8/3-31/82 Welding; heat treatment; Violation: Failure to
steam generator nozzle re-follow procedure for pair; concrete; material preserving valve seals storage.
seals (Level IV).
t 82-10 8/9-13/82 Pressure vessel storage and None.
maintenance, vessel lift, and transporting and field rigging and installation.
82-11 9/1-10/1/82 HVAC supports; electrical Violation: Failure to
conduit; containment pene-restrict drawing toler-trations; nonconformance and ances within engineering disposition reports; field calculations boundary, construction procedures; QC failure to perform training; construction defi-engineering calcula-ciency reports.
tions, and failure to establish as-build conditions on HVAC supports (Level IV).
,
82-12 10/5-7/82 Safety-related cable instal-Violation: Failure to
lation; cable trays / conduit.
provide adequate physi-cal protection and in-plant storage of safety-related electrical equipment (Level IV).
=
.
.. _.
-
. _ _ - _
. _ _ _ _ - - _
- -
- .
. s
.
52-Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings
'
82-13 10/4-11/2/82 Weld activities; NDE; pipe None.
support installation; pro-cedure reviews.
82-14-11/2-12/10/82; Repair welds; NDE of elec-Violation: Improper
,
trical penetrations and NDE requirements for primary piring; hydrostatic electrical penetration tests; 10 CFR 50.55(e) re-(Level IV).
"
port followup; painting and coating.
83-01 1/3-7/83 Welding, NDE, QA/QC on Violation: Use of a
reactor coolant pressure stainless steel weld-boundary piping and vessels ing procedure for in-
,
and other safety related conel welding (Level
<
piping.
IV).
83-02 1/3-31/83 Electrical cable tray con-None.
nections, installation of spare penetratica covers,
repairs to piping, cor,trols of contaminants on stainless steel.
83-03 1/24-27/83 Safety-related cables, cable None.
I trays / conduits and equipment.
83-04 2/1-3/31/83 Record review of shop fabri-Violation: Failure to
',,
" '
cated pipe and HVAC fire provide instructions dampers; piping and support for installation of installation; concrete; NDE, temporary supports 10 CFR 50.55(e) followup.
(Level IV).
.
83-05 4/11-29/83-Construction Team Inspec-Violation: Failure to
tion - construction manage-calibrate a torque ment; QA; design control; wrench calibration equipment storage and main-fixture within required tenance; electrical con-due date and use of
,
struction; piping and sup-miscalibrated fixture port installation.
(Level V).
>
,
,
Deviation: Failure to comply with require-ments of ANSI N45.2.11 for design control.
,
.
f.
,
,,.
,-,
, -..
- - -
-
-
. -.
,
- -, -
_ -_- -
_ - ____
___ ________________-_______ _
..
s
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 83-05 (Continued)
Program weaknesses:
(1) lack of a charter and program for Engi-
neering Department of-l
-
DLC Nuclear Division; (2) design control by AE's site Engineering Group ineffective.
83-06 3/3/83 Environmental protection None.
program.
83-07 5/2-31/83 Design control, pressure Violation: Failure to I
tests of piping systems; currently consider dead program review of tank weight when performing i.
fabricator; FSAR commit-calculations for pipe
!
ments.
support (Level IV).
83-08 6/27-7/1/83 Piping installation and re-Violation: Failure to
,
'
lated QC records.
comply with require-ments for QA procedure for control of hold tags (Level V).
83-09 6/1-7/1/83 NDE, QC training, procedure Deviation: Failure to I
reviews; document review of meet commitment date shop fabricated piping, site for performing inspec-modifications; torquing of tion of pipe supports supports.
for excessive baseplate gaps.
.83-10 7/18-21/83 Installation of safety-None.
I related electrical and in-strumentation equipment.
83-11 7/12-8/26/83 10 CFR 50.55(e) followup; Violation: Failure to I
heat treatment of pipe welds; perform post weld heat material certifications; treatment in accordance specification and field pro-with procedure (Level cedure review, storage, weld IV).
qualifications; battery placement; DLC engineering activities.
83-12 9/26-30/83 Safety-related instrumenta-None.
I tion installation and associ-ated wire / cable circuits.
_ - _ _ - _ _ - _ - - _ _ _ _ _ _ _ _
.__
_
..
.
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 83-13 10/3-31/83 10 CFR 50.55(e) followup; Violation: Failure to
installation of structural install washers over steel; NDE of electrical long-slotted holes in penetrations; personnel structural steel (Level qualifications; procedure IV).
reviews.
83-14 11/1-3/83 Safety-related electrical /
None.
instrumentation installation.
83-15 11/1-30/83-Electrical support installa-Significant item:
tion; piping fabrication; Omission of tolerances mechanical shock arrestors; on drawing details re-pipe weld and QC inspection sulted in installation of electrical supports; of supports which do seismic classification; ven-not have calculations dor documentation, justifying installed conditions.
83-16 11/21-22/83 Stainless steel piping weld-None.
ing.
83-17 12/1/83 -
NDE; hydrostatic tests; Potential problem: Need 1/16/84.
fabrication process; supports to assure all water
installation; welding checks; removed from components storage of batteries; pumps after hydro test, and heat exchangers.
84-01 1/17-2/21/84 FSAR; post weld heat treat-Item: FSAR description
ment; storage; pipe instal-of spent fuel racks lation record review.
different from items being fabricated.
84-02 2/6-10/84 Support welding; drawing None.
control.
84-03 2/22-3/23/84 10 CFR 50.55(e) followup; Violations: Exciter
hydrostatic tests; fabrica-control panel wiring
'
tion processes; installation not in accordance with of supports; electrical panel specifications (Level and cable installation; IV).
QC performing radiography; construction inspection using a startup testing, procedure which in-accurately descibed acceptance criteria (Level IV).
,
-
.. _
, _... - - - -
-
-
,
,
y
..,,,,._,_,_., _
.my__.._.,
,.,_y,__,,
, -.,
,.
e
.
~ Inspection Dates / Number Inspection Enforcement Actions /
~ Number of Inspectors Areas Noteworthy Findings 84-04 4/2-5/84 Safety-related electrical None.
equipment installation; elec-trical separation program.
84-05 4/16-5/25/84 Design and inspection of Allegation not sub-
Category 2 components; Alle-stantiated.
gation RI-84-A-43.
84-06 SALP Report.
--
84-07 6/1-7/23/84 Allegation RI-83-A-88; 10 Allegation not sub-
CFR 50.55(e) followup; cable stantiated.
separation; constructability Concern: Turnover of review team.
service water system with large number of items with construction complete. DLC system walkdowns without pro-cedure.
84-08
'7/16-20/84 Installation and termination Violation: Failure to
of instrument cables.
follow installation procedure (Level V).
>
84-09 7/24-8/24/84 10 CFR 50.55(e) followup;_
Violation: Protection
storage; reactor vessel in-of personnel air lock ternals, N&D dispositions; not provided to prevent fire protection; steam damage of sealing sur-
generator tube rolling faces or support of records.
doors to prevent sag-ging (Level IV).
Deviation: 4 failures to implement controls for cable tray overfill.
84-10 8/13-17/84 Installation of instrumen-Violation: Failure to
tation and electrical equip-seal electrical equip-ment storage.
ment in storage against dirt and dust.
84-11 9/4-7/84 HVAC electrical, piping, and None.
I equipment support.
-.
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 84-12 9/10-14/84 Turnover portion of the QA Violation: Walkdown
program for preoperational group personnel not testing.
certified as qualified for their assignments (Level V).
84-13 9/10-14/84 Post weld heat treatment; None.
welds and welding; welder performance qualification; filler metal control.
84-14 8/24-10/5/84 10 CFR 50.55(e) followup; Concern: Numerous pip-
QC reinspection program of ing and HVAC supports supports, electrical cable; fail to meet current CRNs; engineering confirma-drawings.
NRC concerns tion program; drawing con-regarding QC inspector trol; seismic and environ-performance and effec-mental qualification.
tiveness of QC super-vision; quality of construction work pre-sented for QC inspec-tion.
84-15 9/24-10/19/84 Independent measurements in-None.
spection (NDE van) of safety-related selected piping, structural and support weld-ments to ASME and AWS code.
84-16 10/9-11/19/84 Storage of components; con-None.
struction of spent fuel and refueling cavity liner; electrical and instrument tube support installation; repair of MSIV, post weld heat treatment; reactor upper internals, N&D dis-positions.
84-17 10/29-11/1/84 Safety-related electric None.
equipment installation; color separation progra..
n
.
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 84-18 11/20/84 -
Storage of RCS components,
_ Violation: RCS piping 1/2/85 fuel pool coolers and bat-and components not
teries; installation of properly sealed to strut pipe supports, protect from exposure to environment and airborne contamirants (Level IV).
Concern: Weakness of maintenance program for installed plant equipment.
84-19 12/17-19/84 Safety-related electrical None.
I cable and equipment instal-lation.
85-01 1/7-11/85 Preoperational test and pre-None.
operational preparedness in-spection program.
85-02 1/21-25/85 SIS piping; pipe supports; Violations: Failure
RV internals; preservice in-to issue controlling spection.
documents for valve disassembly (Level IV).
Penetrant indication on RPV internals assembly (Level V).
85-03 1/2-2/1/85 Storage of components; in-None.
stallation of pipe supports; Comment:
Good control polar crane maintenance; found in weld electrode weld material control and control program.
certification; welding and inspection procedures.
85-04 1/28-2/1/85 Safety-related instrument Violations: Failure
components and systems.
to include separation as an attribute check in inspection program (level IV).
Failure to include design cri-teria in design docu-ment (Level V).
Fail-ure to follow proce-dures requiring inde-pendent supports for redundant instrument tubing (Level IV).
\\
.
>
.
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 85-05 2/4-3/1/85 Control of hold tags, in-Violations: Hold / reject
spection disposition of tags not removed as electrical panel wiring required and work on separation; cable pull a component tagged as ticket control; pipe weld-HOLD (Level IV).
In-ing; installation of elec-spection disposition trical pull boxes.
and rework of elec-trical wiring without implementing QA program (Level IV). Unsatis-factory dispositioning of N&D (Level IV).
85-06 3/4-29/85 Pipe weld radiographs; None.
welder qualification; N&D reports.
85-07 3/18-29/85 Construction Team Inspection. Violations: Failure
to follow procedures
>
in electrical con-struction (Level IV).
Failure to retrieve records in electrical construction interface (Level IV).
Numerous examples of failure to follow procedures in-volving lack of atten-tion to detail in pro-viding current adminis-trative information in documents (Level _V).
Concerns: Organiza-tional changes result--
ing in turnover of NCD Project Manager; lingering problems in engineering construc-tion interface.
85-08 4/14-19/85 Preoperational test program; None.
RCS hydrostatic test; test program QA/Q.
.
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 85-09 4/15-5/14/85 Electrical cable pulling; None.
rebar cadweld; instrumenta-tion welding; welder quali-fication; N&D dispositions; excessive feedwater transient analysis review.
85-10 4/29-5/3/85 Safety-related electrical /
None.
instrument installation.
85-11 5/13-17/85 Environmental monitoring None.
program.
85-12 5/13-17/85 Safety-related mechanical None.
equipment installation.
85-13 5/23-6/28/85-10 CFR 50.55(e) followup; Violation: Failure to
seismic design; piping sup-meet procedure require-ports; rigid way struts; re-ments (Level-IV).
work of components; N&D dis-position.
Deviation: Failure to meet Reg Guide 1.29.
Concern: Control of rework and/or dis-assembly of installed components.
85-14 6/24-28/85 Preservice inspection pro-Violation: Failure to
gram, provide required clear-
.ance for welds ISI (Level V).
85-15 7/8-12/85 Review of previous elect-None.
I trical area findings.
85-16 7/1-8/5/85 Piping supports; instrumen-Violation: Lack of
tation tubing installation; corrective action on material and equipment con-N&D reports (Level IV).
trol; test of station bat-teries; 5 KV cable termina-tion.
85-17 Not Used.
85-18 8/12-16/85 Preoperational testing QA None.
progra e
'4
.
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 85-19 8/6-9/16/85
_ Pipe supports; rework on Concern: Numerous systems turned over to start problems in methods up group; eddy current test used to tighten and of steam generator tubes.
lock nuts on pipe clamps and supports.
85-20 8/26-30/85 Containment building exterior None.
I wall concrete closure; IE Bulletin 79-02; settlement monitoring.
85-21 9/17-10/22/85 HVAC supports; flex conduit Violation: Failure of
and condulet installation; a QC inspector to per-weld material control; con-form adequate specific crete placement in contain-inspection of two HVAC ment building exterior wall.
supports (Level IV).
85-22
.9/23-27/85 Preventive maintenance pro-None.
I gram for emergency diesel generators.
85-23.
10/28-11/1/85 Instrument and electrical Violation: Failure to.
equipment.
incorporate instrument tube slope requirements in design drawings re-leased for construction (Level IV).
85-24 10/21-25/85 Structural, piping, and None.
electrical supports.
'85-25 10/23-12/2/85 Electrical installations; Violation: Conflicting
monorail systems; environ-information on two de-mental _ qualification; elec-sign documents result-trical rework control; main ing in use of wrong steam piping field welds; type terminal block ISI procedures.
for feewater isolation valve (Level IV).
Deviation: Failure to implement Reg Guid 1.29 requirements pertaining to seismic design and construction of non-safety-related systems such as monorails whose failure could affect safety-related systems.
__
-
-
-,
.
.
.
,
-
_
..
.
s
Inspection Dates / Number Inspection Enforcement Actions /
Number lof Inspectors Areas-Noteworthy Findings 85-26 12/3/85 -
Limitorque operators; equip-- Concern: Adequacy of 1/6/86 ment layup; QA/QC program; QC inspections on sys-
main steam piping to auxili-tems turned over to ary feedwater turbine; pre-DLC Startup Group.
service examinations; fire protection supports.
86-01 1/6-30/86 Initial test program open Concern: Verification
items of BV-2 SER (NUREG-of system restoration 1057); RCS hydrostatic test; during preoperational RPS and EDG testing.
testing and use of temporary procedures.
-86-02 1/6-2/10/86 Environmental qualification; Concerns: Control of
flexible conduit installa -
tools and equipment, tion; cleanliness controls test control and over-during flushing; pipe sup-all reactor vessel port clearance measurements; cleanliness control; steam generator shot peening; installation of un-reviews of engineering dis-qualified electrical positions.
connectors; installa-tion problems with flexible conduit in-volving disengaged or loose couplings.
86-03 1/27-2/7/86 Instrument and electrical None.
equipment.
86-04 2/1-28/86 Preoperational program im-None.
plementation; EDG qualifica-tion and proof testing; re-circulation spray and quench spray system preoperational tests.
86-05 2/24-28/86 Preservice inspection acti-None.
vities.
-86-06 3/1-31/86 Preoperational program ir-None.
plementation; containment integrated leak rate proce-dures; recirculation and quench spray system pre-operational test procedure e
')
Inspection Dates / Number Inspection Enforcement Actions /-
Number of Inspectors Areas Noteworthy Findings 86-07 4/1-5/9/86 Preoperational program im-Concerns: RCS and CVCS
plementation; RCS cold hydro-cleanliness leading status test; EDG and high to sheet metal intro-head safety injection pump duction into RCP 21C proof test; QC during test-suction; nozzle dam ing.
in primary system.
86-08 4/14-21/86 RCS hydrostatic test.
None.
86-09 Not Used.
86-10 4/2-6/86 Electrical systems and com-None.
I ponent installation.
86-11 5/19-22/86 Preoperational test program; None.
JTG approved preoperational test procedures; approved test results; QA/QC inter-face activities; indepen-dent review of design as-pects of auxiliary feed pump turbine steam supply line regarding water hammer.
86-12 5/10-6/13/86 Preoperational program im-None.
plementation; RCS hydro test evaluation and system restor-ation; EDG exhaust hood fail-ures.
86-13 6/9-20/86 Mobile NDE laboratory in-Violations: Unaccept-
spection of structrual sup-able indication in base ports, fuel racks and pre-metal (Level IV).
service weldments.
Liquid penetrant in-dications in weldments (Level IV).
86-14 6/17-20/86 Nonradiological chemistry None.
programs.
86-15 6/14-7/21/86 Preoperational program im-None.
plementation; AFW pumps Phase 1 testing; battery Phase 2 testing; electrical separa-tion program :O
s
Inspection Dates / Number Inspeution Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 86-16 6/17-20/86 Nuclear material control and None.
I accounting.
86-17 6/2-6/86 Technical Assurance Audit None.
Program inspection.
86-18 7/7-11/86 JTG preoperational test pro-None.
cedures; JTG-approved test results of cold hydros; QA/QC interface; manual and motor operated valve and SFP bridge hoists and perform Phase 1 test results.
86-19 7/14-18/86 Reactor vessel installation None.
I records; installation modifi-cation and QC of safety-related systems.
86-20 7/21-25/86 JTG-approved preoperational None.
I procedures; containment in-strument air compressor test; QA/QC interface; human error deficiencies; motor operated valves Phase 1 test results.
86-21 8/25-10/3/86 Preoperational program im-Violation: Controlled
plementation; new fuel re-area barrier degraded ceipt.
(Level V).
86-22 8/18-22/86 Preoperational test program; None.
.QA/QC interface; independent
>
review and inspection of 8 temporary strainers.
86-23 7/28-30, 8/4, Technical Aassurance Audit None.
5/86 Program inspection.
86-24 9/2-4/86 Operations, maintenance, and None.
QA.
86-25 9/2-5/86 JTG-approved test procedures None.
I and approved test results; QA interface; main steam isola-tion valves.
,
I
- --
,
,, - - -, - - -
-,
_,, -
--,
--~.-.r,
--.-,--<- -..-.
, -,-- --
.
.,
......
-
.
..
_ _ _ - - - _ _ - _ _ _. - _ _ _ _.
._-
_
e
.
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 86-26 9/8-12/86 Preservice inspection pro-None.
l
gram and results.
86-27 9/15-19/86 Preoperational test program; None.
MSIV Phase 1 tests.
l l
86-28 9/30-10/3/86 Preoperational test program; Violations: System l
witnessing of preoperational changes not properly
'
tests of CVCS, pressurizer reflected in preopera-level and protection channel tional tests (Level calibration.
IV).
Failure to assure that all system pre-requisites were satis-fied prior to testing (Level V).
86-29 9/29-10/3/86 Instrumentation and control Violation: Improper
and electrical systems and reporting per 10 CFR components.
50.55(e) (Level III).
86-30 9/29-10/3/86 Instrument and instrument None.
cable installation.
86-31 10/4-11/5/86 Fuel receipt; security, aux-Violation: Failure to
iliary feedwater system; provide appropriate emergency diesel generators; criteria to QC inspec-solid state protection sys-tors and failure to tem; RTDs; RCS; high energy verify conformance with line break in safeguards clearance requirements building on rigid sway struts.
86-32 10/20-24/86 Preoperational test program; Deviation: Not deter-
QA interface; test of un-mined, NPSH available
,
l coupled turbine; MSIV.
for recirculation l
system spray pumps.
86-33 10/20-24/86 MSIV operability; MSSV im-None.
proper ring settings.
86-34 10/20-24/86 Preoperational activities Concern: Administrative
related to radiation protec-weaknesses in RWPs and tion; receipt, handling, and vehicle survey records.
control of new fuel.
86-35 None.
_ _ _ _ _ _ _
O O
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 86-36 11/17-21/86 Preoperational testing QA None.
program.
86-37 10/20-24/86 Preservice inspection acti-None.
I tivies.
86-38 11/3-7/86 Preoperational test program; None.
procedure review; test wit-nessing; test results review; QA interface; EDG record re-view and inspection.
86-39 11/3-30/86 Fuel receipt; hot functional None.
testing; potential failure of multiple ECCS pumps; TMI Action Plan;-AFW system test-ing; MSSV testing.
86-40-11/17-21/86 Preoperational test program; None.
hot functional tests; QA interface; latch release test of MSIV-A operator.
86-41 11/17-21/86-Installation / rework of elec-None.
I trical cable for separation; degraded grid voltage motor starting transients.
86-42 12/2-5/86 Procedure preparation and None.
staffing for operations; maintenance and IOL in preparation for OL.
86-45 12/8-12/86 Preoperational test program None.
for process monitoring and radioactive waste systems; chemistry and effluent controls.
86-46 12/8-11/86 Electrical splices and ter-Violation: Failure to mination using heat shrink follow procedures re-tubing.
quiring deburring of sharp edges in contact with safety-related cable (Level IV).
'o.
.
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 87-01 1/5-9/87-Procedure preparation, staff-None.
ing and implementation for operations, maintenance, and I&C, in preparation for OL.
87-02 1/17-2/28/87 Preoperational test program Violation: Failure to
implementation, EDG sequence include appropriate start testing, TMI Action criteria for inspection Plan requirements, charging of HVAC equipment sup-pump test deficiencies, reac ports (Level IV).
tor trip system, reactor ves-sel pressure transient protec-tion, CO actuation of fire
dampers, HVAC' seismic sup-ports, containment integrity.
87-03 1/12-16/87 QA program; receipt inspec-None.
tion, storage and handling, design change and modifica-tions; onsite safety commit-tee, non-licensed training program.
87-04 1/12-16/87 Preoperational test proce-None.
dure review, initial startup testing program status, QA/QC interface with preoperational testing.
87-05 1/26-30/87 Security Department Training None
Program.
87-06 1/26-3/30/87 Operator Licensing Examina-None.
tions.
87-07 Cancelled 87-08 1/3/87 Report of meeting regarding NA Operations Training Program.
87-09 2/10-13/87 Radiological controls pre-Nene.
operational activitie e.
t
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors Areas Noteworthy Findings 87-10 2/2-13/87 Preoperational test witness-None.
ing, review of operating pro-cedures in preparation for plant operation, QA/QC inter-face with preoperational testing activities.
87-11 2/3-6/87 Fire protection program, None.
procurement / installation procedure, QA combustible material control / hazard reduction program, opera-bility and maintenance of fire protection system.
87-12 2/9-14/87.
Preoperational containment None.
structural acceptance test and containment integrated leak rate test preliminary results evaluation.
87-13 2/17-19/87 Radiography of regenerative None.
heat exchanger welds and preservice inspection iden-tified deficiencies.
87-14 3/2-6/87 Emergency Preparedness Im-None.
plementation Appraisal 87-15 2/23-27/87 Document control, records None.
I management.
87-16 3/16-20/87 TMI Action Plan status and None.
Emergency Operating Proce-dures.
87-17 3/9-15/87 Fire Protection program com-Protection of cable pliance with 10 CFR 50 Ap-room cable tray sup-pendix R and Generic Letter ports is unresolved.
86-10.
87-18 3/1-4/5/87 Preoperational test program, Violations: Inadequate
TMI Action Plan implementa-design control (Level tion, containment surveys V); Inadequate accept-screen installation; control tance criteria speci-room temporary wall removal, fied for cable tray HVAC controls, cable tray installation (Level inspection.
IV).
l
m e
,
e
Inspection Dates / Number Inspection Enforcement Actions /
Number-of Inspectors Areas Noteworthy Findings 87-19 3/9-13/87 Preoperational test program, None.
test witnessing, test re-port review, QA interface.
87-20 3/16-27/87 Regional As-Built Team In-Violations: Failure
spection, to implement QC pro-cedures affecting safety related inspec-tions (Level V); Safety related electical equipment was found not to be identified
~
'
as committed in FSAR (Level V).
87-21 3/9-13/87 Report Pending 87-22 3/16-20/87 QA programs for maintenance, None.
design change and modifica-tions, test and experiment control, measuring and test equipment control, procure-ment control, offsite review committee operational safety.
87-23 3/30-4/10/87
. Report Pending 87-24 3/23-27/87 Report Pending 87-25
_4/6-10/87 Report Pending-87-26 3/30-4/3/87 Report Pending 87-27 3/30-4/3/87 Report Pending 87-28 3/30-4/3/87 Report Pending 87-29 4/6-24/87 Report Pending 87-30 4/6-10/87 Report Pending 87-31 4/6-17/87 Report Pending 87-32 4/6-15/87 Report Pending 87-33 4/21-24/87 Report Pending
I
-
- 9 -
+.
e
Inspection Dates / Number Inspection Enforcement Actions /
Number of Inspectors.
Areas Noteworthy Findings 87-34 3/30-4/10/87 Technical Specifications As-None.
Built Inspection.
87-35-4/3-5/31/87 Inspection In Progress 87-36 4/20-24/87 Report Pending 87-37 4/20-5/1/87 Report Pending-87-38 5/11-15/87 Report Pending 87-39 5/4-8/87 Report Pending
,
.